[2026] VCAT 79
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-02-09
Original judgment source is linked above.
41.1 the proposal is not supported by the purpose and decision guidelines of the RCZ, nor by relevant policy in the Scheme relating to settlement, housing, protection of environmental and landscape values and management of risks;
To construct a building or construct or carry out works associated with a 'Dwelling'
To construct a building within 100 metres from a waterway
To construct a building or construct or carry out works
To construct a building or construct or carry out works
To construct a building or construct or carry out works
Approved and endorsed plans - changes required
(a) be prepared to the satisfaction of the Responsible Authority
(b) be drawn to scale with dimensions
(c) submitted in electronic form
(d) be generally in accordance with the plans forming part of the application and identified as 65 Wattle Gully Road, Mt Glasgow, project no. 2709, dated May 2025, prepared by Natural Resource Link Pty Ltd, but amended to show the following details:
- elevation details for the dwelling;
- the details required by Condition 3 of this Permit;
- Notation of that all site excavation and earthworks and slope stability works are to be undertaken in accordance with the Geotechnical Assessment Ref. 24H1056GTA, prepared by AGR GeoSciences, dated 8 October 2024.
- the findings and recommendations of the Land Capability Assessment Report No. A251010 prepared by Paul Williams & Associates, November 2025.
(a) be prepared to the satisfaction of the Responsible Authority; and
(b) include the use of muted and non-reflective colour finishes for external cladding.
The Responsible Authority may consent in writing to vary these requirements and the details in an approved schedule.
(a) Access to the dwelling must be provided via an all-weather road with dimensions adequate to accommodate emergency vehicles.
(b) The dwelling must be connected to reticulated sewerage if available. If reticulated sewerage is not available, all wastewater from the dwelling must be treated and retained within the lot in accordance with the requirements of the Environment Protection Regulations under the Environment Protection Act 2017 (Vic) for an on-site wastewater management system.
(c) The dwelling must be connected to a reticulated potable water supply or have an alternative potable water supply with adequate storage for domestic use as well as for fire fighting purposes.
(d) The dwelling must be connected to a reticulated electricity supply or have an alternative energy source.
(a) Access
- Vehicle access to the property must be from Wattle Gully Road.
- The existing crossover must be upgraded to the standard of Infrastructure Design Manual Standard Drawing 255 to the satisfaction of the Responsible Authority.
- Any works to crossovers/driveways will require the permit holder to apply and have approved driveway crossing and/or consent for works permit/s for crossover/driveway/access works. All works constructed or carried out must be in accordance with the approved plans/permit(s).
- Once constructed the crossovers/driveways/access must be thereafter maintained by the permit holder to the satisfaction of the Responsible Authority.
(b) Drainage
- The permit holder must design and construct a drainage system to drain the development to the legal point of discharge to the satisfaction of the Responsible Authority.
- The stormwater site discharge must not be increased by the proposed development. The drainage system shall include provision for an onsite detention system to limit site discharge from the development to pre-development levels.
- No effluent or polluted water of any type will be allowed to enter any Council drainage system.
(c) Asset Protection
- At any time, the permit holder must ensure that the operation and condition of Council assets (including street trees, drainage pits and covers, footpaths and kerb and channel) are not damaged by the site construction works.
- If the Responsible Authority deems Council assets have been detrimentally affected or damaged by development construction access, then the assets will be required to be repaired and reinstated by the permit holder to the satisfaction of the Responsible Authority.
(d) Sediment Control
- The developer must restrict sediment discharges from any construction sites within the land in accordance with Construction Techniques for Sediment Pollution Control (EPA 1991) and Environmental Guidelines for Major Construction Sites (EPA 1995).
(a) The development is not started within 2 years of the issued date of this permit.
(b) The development is not completed within 4 years of the issued date of this permit.
(c) The use does not start within 2 years of the completion of the development.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Conditions of the referral authorities are discussed where relevant in these reasons.
[7] AGR Geosciences Pty Ltd (8 October 2024).
[8] AGR Geosciences Pty Ltd (17 October 2024).
[9] Permit D075/18 issued 21 January 2019.
Morris
Central Goldfields SC