[2024] VSCA 201
General information, not legal advice.
Court of Appeal (Vic)
2024-09-13
Mr J, Emerton P
Original judgment source is linked above.
(a) the Minister's reasons accompanying the Orders were inadequate (grounds 1 and 8);
(b) the Minister's reasons demonstrated unreasonableness (grounds 2 and 9);
(c) the Minister failed to exercise the power conferred by s 16Y of the NEVA because the Orders inadequately 'specify' the augmentation to which the Orders applied (ground 3);
(d) the February order was invalid by reason of uncertainty (ground 4);
(e) the May Order was invalid because the Minister had no power to require AEMO to publish 'with Transgrid' the PACR identifying Option 5A as the 'preferred option' for VNI West (ground 6);
(f) the May Order was invalid because the Minister acted with two improper purposes (ground 7); and
(g) the Orders were invalid because:
(i) the decisions to publish the Orders were affected by jurisdictional error because the Minister had no power to disapply or modify s 49 of the Law or therefore r 5.22 of the Rules (relating to AEMO's functions as National Transmission Planner);
(ii) in any event, the Minister did not disapply or modify s 49 of the Law or r 5.22 of the Rules;
(iii) the scheme of r 5.22 of the Rules providing for the making of ISPs is predicated on there being an RIT-T for the relevant process; and
(iv) both of the Orders, by purporting to disapply the RIT-T requirements for VNI West, are not supported by s 16Y(1) and are repugnant to and inconsistent with s 6 of the NEVA (applying s 49 of the Law and r 5.22 of the Rules) (ground 10).
(a) In its final form, the WRL project provides for an augmentation of the Victorian energy grid by way of 500kv transmission lines running westward from Sydenham to Bulgana, west of Ballarat, together with terminal station works.
(b) In its final form, the VNI West project proposes a connection between the WRL project at Bulgana running north-east to a new terminal located near Kerang and then north to the NSW border.
(c) Each project has emerged from a series of procedural steps taken as part of a RIT-T planning process. Ultimately, however, this process led to a political decision to materially modify the VNI West route, which was then taken outside the framework of the RIT-T planning process.
To increase transfer capacity between New South Wales and Victoria to realise net market benefits by:
(a) specified the augmentations to which it applied;
(b) conferred functions on AEMO in respect of the specified augmentations; and
(c) disapplied a number of provisions of the Law and the Rules insofar as they applied to the specified augmentations.
(a) Sections 50F(2), 50F(3) and 50H of the Law, which respectively require AEMO to take into account certain matters in deciding whether to proceed with an augmentation to the declared shared network (ie cost benefit analysis, application of probabilistic approach, competitive tender) and the resolution of dispute arising from attempts to negotiate a network agreement or augmentation connection agreement:
(b) Rules 5.15A, 5.16, 5.16A and 5.16B of the Rules, which provide for general and specific RIT-T principles and the application of the RIT-T to both actionable and not actionable ISP projects, and disputes in relation to the application of the RIT‑T.
(c) Rules 8.11.4, 8.11.6, 8.11.7, 8.11.8, 8.11.9 and sch 8.11 of the Rules, which govern the procurement, contractual and planning processes for augmentation of declared transmission systems in an adoptive jurisdiction. Rule 8.11 has the following objective:
- 8.11.2 Object
- The objects of this rule are:
(1) to establish the distinction between contestable augmentations and augmentations that are not contestable; and
(2) to regulate the process for calling, receiving and evaluating tenders for the construction and operation of a contestable augmentation; and
(3) to facilitate the construction and operation of augmentations; and
(4) to provide guidance on risk allocation and other commercial principles to be reflected in network agreements and augmentation connection agreements; and
(5) to make provision for certain matters with respect to AEMO's planning of the declared shared network.
(d) Lastly, AEMO's planning criteria published in accordance with r 8.11.4 are specifically disapplied.
(a) the publication of the RIT-T and the principles governing the application of the RIT-T to both not actionable and actionable ISP projects - r 5.15A;
(b) the application of RIT-T to projects which are not actionable ISP projects - r 5.16;
(c) the application of RIT-T to projects which are actionable ISP projects - r 5.16A; and
(d) disputes in relation to the application of RIT-T - r 16B.
Application
For a RIT-T project that is not an actionable Integrated System Plan (ISP) project, the RIT-T proponent must apply the RIT-T in accordance with clause 5.15A.2:
(a) to the proposed transmission investment as required by clause 5.16.3;
(b) in accordance with the requirements relating to the credible option set out at clause 5.15.2;
(c) as required by the procedures set out at clause 5.16.4; and
(d) to a level of analysis which is proportionate to the scale and likely impact of each credible option being implemented, as set out in clause 5.15A.2(b)(2).
Note: The RIT-T application guidelines provide guidance on the operation and application of, and the process to be followed in applying the RIT-T to projects that are not actionable ISP projects.
For an actionable ISP project, the RIT-T proponent must apply the RIT-T in accordance with clause 5.15A.3:
(a) to the identified need associated with the actionable ISP project except if, in accordance with clause 5.16A.3(a), the circumstances set out in clause 5.16.3(a) apply to that actionable ISP project;
(b) in accordance with the requirements relating to the credible option set out at clause 5.15A.3(b)(7)(iii) - and clause 5.15.2 where the RIT-T proponent is considering new credible options under clause 5.15A.3(b)(7)(iii)(C);
(c) as required by the procedures set out at clause 5.16A.4; and
(d) to a level of analysis which is proportionate to the scale and likely impact of each credible option being implemented, as set out in clause 5.15A.3(b)(2).
Note: The cost benefit analysis guidelines provide guidance on the operation and application of, and the process to be followed in applying the RIT-T to actionable ISP projects. The RIT-T proponent must comply with the binding requirements and considerations set out in the cost benefit analysis guidelines when applying the RIT-T to an actionable ISP project.
(a) provide for planning criteria relating to augmentations - r 8.11.4;
(b) define contestable augmentations - rr 8.11.3 and 8.11.4;
(c) govern the tender process with respect to contestable augmentations and the alternative documentary requirements in the case of funded augmentations - rr 8.11.7 and 8.11.8; and
(d) govern network agreements and augmentation agreements relating to contestable augmentations - r 8.11.9 and sch 11.
Ground 10 (February and May Orders) - incompatibility with 2022 ISP
- Section 49(2)(a) of the Law, which is applied inter alia by the NEVA and the [National Electricity (New South Wales) Act 1997], provides that in its role as the 'National Transmission Planner', AEMO's functions include 'to prepare, maintain and publish a plan for the development of the national transmission grid (the National Transmission Network Development Plan) in accordance with the Rules.
- Clause 5.22 of the Rules makes provision for the preparation, maintenance and publication of an 'integrated system plan' (ISP), which fulfils the requirements of a 'National Transmission Network Development Plan' as required by section 49(2) of the Law.
- In June 2022, in discharge of its function under section 49(2)(a) of the Law described above, and of the requirements of clause 5.22 of the Rules, AEMO published the 2022 ISP, which identifies the VNI West project as an 'actionable ISP project'.
- The Minister has no power, under section 16Y of the NEVA, to disapply or modify section 49 of the Law.
- The Minister has no power, under section 16Y of the NEVA, to disapply or modify clause 5.22 of the Rules. In any event, the Minister has not, in either the February Order or the May Order, purported to disapply clause 5.22 of the Rules.
- The:
(a) scheme in clause 5.22 of the Rules; and
(b) the 2022 ISP published by AEMO under section 49(2)(a) of the Law and clause 5.22 of the Rules,
are predicated on an RIT-T being conducted for actionable ISP projects, including the VNI West project.
- In the premises:
(a) the Minister has no power under section 16Y of the NEVA to disapply clauses 5.15A and 5.16A of the Rules to the VNI West project, being an 'actionable ISP project';
(b) alternatively, the outcome of the purported exercise of the Minister's power under section 16Y to make the February Decision and the May Decision is legally unreasonable, as the Decisions result in incoherence in the law of Victoria.
- Accordingly:
(a) both the February Decision and the May Decision are affected by jurisdictional error such that it they are amenable to being quashed by an order in the nature of certiorari; and
(b) if the decisions are quashed, or is affected by jurisdictional error, then the February Order and the May Order have no legal effect.
(a) The scope of the Minister's power to disapply the Law under s 16Y(1)(a) is confined to matters relating to 'declared transmission systems' and is confined to a particular subdivision of the Law. The Minister's power should be strictly construed.
(b) Sections 49(2)(a) and (e) of the Law fall outside the relevant subdivision and confer functions on AEMO as National Transmission Planner with respect to the preparation, maintenance and publication of an ISP in accordance with the Rules.
(c) The Orders disapply or modify s 49(2) read together with the Rules and in particular r 5.22, which provides for the making of ISPs, and r 5.16A, which requires the application of the RIT-T process to actionable ISP projects. In consequence, the Orders are not supported by s 16Y(1).
(a) the Rules are not paramount over orders made under s 16Y of the NEVA;
(b) the reference to the Rules in s 49(2) is relevantly to be understood as a reference to the Rules as they are applicable as part of the law of Victoria;
(c) the Minister's powers under s 16Y are not subject to any implied limitation that operates so as 'not to allow the Minister to interfere with AEMO's functions as [National Transmission Planner]';
(d) section 16Y expressly contemplates the displacement of the general application of the RIT-T process to a specified augmentation;
(e) the relevant extrinsic materials make clear that a basic purpose of the introduction of s 16Y was to enable the Minister to avoid the RIT-T process; and
(f) there is, in any event, no conflict between the Orders and the operation of r 5.22.
(a) the June 2022 ISP is not a National Transmission Network Development Plan ('NTNDP') within the meaning of s 49(2)(a) of the Law;[27]
(b) there is no conflict between the Orders and r 5.22 because none of the rules referred to by the applicant impose an obligation to apply the RIT-T process to specified augmentations;[28]
(c) insofar as the provisions of r 5.22 operate in respect of actionable ISP projects, that assumption only applies to the extent that the RIT-T rules apply to a specific actionable ISP project;[29] and
(d) to the extent that there is any inconsistency between the Orders and r 5.22, the Orders prevail by reason of ss 16ZC(1), 16ZC(3) and 16Y(4) of the NEVA.[30]
16Y Order modifying regulatory arrangements relating to declared transmission system augmentations and related services
(1) Subject to this Division, the Minister, by Order published in the Government Gazette, may do any one or more of the following -
(a) specify, for the purposes of the Order -
(i) the carrying out of, or operation of, an augmentation of the declared transmission system as a specified augmentation;
(ii) services provided or to be provided in relation to or by means of a specified augmentation as specified augmentation services;
(iii) non-network services as specified non-network services;
(a) Section 16Y(1)(b)(i) empowers the Minister, by order, to 'provide that Subdivision 3 of Division 2 of Part 5 of the Law, or a specified provision of that Subdivision, does not apply as a law in Victoria in respect of ... a specified augmentation'. (That subdivision is headed 'AEMO's declared network functions' and we will refer to it as the 'declared network functions subdivision'.)
Put another way, s 16Y(1)(b)(i) permits the Minister to disapply the declared network functions subdivision, or a provision thereof, in relation to a particular, identified augmentation. But it does not permit the Minister to disapply a provision of the Law that falls outside the declared network functions subdivision.
(b) Section 16Y(1)(c)(i) empowers the Minister, by order, to 'modify the application of a specified provision of [the declared network functions subdivision] as it applies as a law in Victoria in respect of ... a specified augmentation'.
Put another way, 16Y(1)(c) permits the Minister to modify the application of a provision within the declared network functions subdivision to a particular, identified augmentation. But it does not permit the Minister to modify a provision of the Law that falls outside the declared network functions subdivision.
(a) Section 16Y(1)(d)(i) empowers the Minister, by order, to 'provide that a specified provision of the Rules does not apply in respect of ... a specified augmentation'.
(b) Section 16Y(1)(e)(i) empowers the Minister, by order, to 'modify the application of a specified provision of the Rules to ... a specified augmentation'.
It is notable that these two powers in respect of the Rules are not textually constrained in the way that ss 16Y(1)(b) and (c) are constrained in respect of the Law. That is, ss 16Y(1)(d) and (e) permit the Minister to disapply or modify any provision of the Rules, whereas ss 16Y(1)(b) and (c) only permit the Minister to disapply or modify provisions of the declared network functions subdivision.
(a) modify the application of standards, procedures or guidelines published under the Rules to -
(i) a specified augmentation;
...
(b) modify the application of a specified provision of the Rules to the provision of reserve in respect of -
(i) a specified augmentation;
...
(c) specify matters or things that are to apply in relation to -
(i) a specified augmentation;
...
(d) specify a test, examination or assessment to apply in relation to a specified augmentation or specified augmentation services in place of the regulatory investment test for transmission (an alternative regulatory investment test);
(e) specify guidelines for the purposes of an alternative regulatory investment test;
...
(i) require AEMO to carry out a declared network function or a function referred to in section 16X(2)(b) in relation to -
(i) a specified augmentation;
...
(k) require a declared transmission system operator or prospective declared transmission system operator to -
(i) plan the carrying out of a specified augmentation;
(ii) carry out a specified augmentation;
(iii) operate a specified augmentation;
(iv) facilitate the planning, carrying out or operation of a specified augmentation;
16X Additional AEMO functions
(1) For the purposes of section 50C(1)(f) of the Law, AEMO is conferred the following functions -
(a) to contract for augmentation related services or specified non-network services;
(b) to conduct competitive tenders in respect of augmentation related services and specified non-network services.
(2) In addition -
(a) a function conferred on AEMO under an Order under section 16Y that is related to the declared transmission system, or electricity network services provided by means of or in connection with the declared transmission system, is taken to be conferred by this Act for the purposes of section 50C(1)(f) of the Law; and
(b) a function conferred on AEMO under an Order under section 16Y (other than a function referred to in paragraph (a)), or a power conferred on AEMO under an Order under that section, is taken to be conferred on AEMO by this Act.
(5) An Order under subsection (1) may -
(a) be of limited or general application;
(b) differ according to time, place or circumstances;
(c) confer functions and powers on, or leave any matter or thing to be decided by, AEMO;
(d) apply, adopt or incorporate any matter contained in any document, whether -
(i) wholly or partially or as amended by the Order; or
(ii) as existing at the time the Order is made or at any time before then; or
(iii) as existing from time to time;
(e) contain provisions of a savings or transitional nature on the making of the Order;
(f) provide for any matter that is incidental to a matter set out in the Order or necessary to give effect to a matter set out in the Order.[37]
(4) Without limiting subsection (1), an Order under that subsection may -
(a) disapply, or modify the application of a provision of, the Law as a consequence of a provision of the Order that disapplies or modifies the application of another provision of the Law in respect of -
(i) a specified augmentation; or
...
(b) disapply, or modify the application of a provision of, the Rules as a consequence of a provision of the Order that disapplies or modifies the application of another provision of the Rules in respect of -
(i) a specified augmentation; or
...
16ZC Effect of Order
(1) An Order under section 16Y has effect according to its tenor in relation to the following despite anything to the contrary in this Act or in any agreement or contract -
(a) a specified augmentation;
...
(2) To avoid doubt, section 32 applies subject to an Order under section 16Y.
(3) In addition -
(a) the Law applies as a law of Victoria in relation to -
(i) a specified augmentation subject to the Order under section 16Y specifying that augmentation; and
...
(b) the Rules have the force of law in Victoria in relation to -
(i) a specified augmentation subject to the Order under section 16Y specifying that augmentation; and
...
(a) First, s 16ZC(1) provides for the effect of an order made under s 16Y(1), namely that it 'has effect according to its tenor', despite anything in the Law or the Rules.
(b) Secondly, s 16ZC(2) provides that, 'for the avoidance of doubt, s 32 applies subject to an Order under s 16Y(1)'. Section 32 provides for the operation of AEMO's declared network functions under the Law within Victoria.[39] These include augmentation functions under s 50F.
(c) Thirdly, s 16ZC(3) provides that the Law applies as a law of Victoria 'subject to' an order under s 16Y(1), and likewise the Rules have the force of law in Victoria subject to such an order.
The applicant's step 1: Is there an implied limitation on the Minister's power to disapply or modify a provision of the Law?
When the Legislature explicitly gives a power by a particular provision which prescribes the mode in which it shall be exercised and the conditions and restrictions which must be observed, it excludes the operation of general expressions in the same instrument which might otherwise have been relied upon for the same power.[41]
The underlying legislative purpose [of the provision there in issue] is evidently to provide a flexible means of making adjustments to the savings and transitional provisions otherwise contained in Pt 19H which does not require those adjustments to be embodied in further amendments to the Act. The flexible means provided is the conferral on the executive of permission to make regulations containing such other provisions of a savings or transitional nature as may be considered by the executive to be appropriate, subject to disallowance of any provision of a regulation so made by resolution of either House of Parliament under s 41 of the Interpretation Act. That parliamentary oversight is facilitated by the requirement of s 40 of the Interpretation Act for written notice of the regulations to be tabled in both Houses of Parliament, and is enhanced by the requirement under s 4 of the Legislation Review Act 1987 (NSW) for the existence of a joint committee of members of Parliament ... the functions of which include, under s 9 of that Act, considering all regulations while they are subject to disallowance and considering whether the special attention of Parliament should be drawn to any such regulation on any ground. That parliamentary oversight, together with the scope for judicial review of the exercise of the regulation-making power, diminishes the utility of the pejorative labelling of the empowering provisions as 'Henry VIII clauses'. The empowering provisions reflect not a return to the executive autocracy of a Tudor monarch, but the striking of a legislated balance between flexibility and accountability in the working out of the detail of replacing one modern complex statutory scheme with another.[44]
The applicant's step 2: How do ss 49(2)(a) and (e) interact with the Rules concerning preparation of an ISP?
(a) to prepare, maintain and publish a plan for the development of the national transmission grid (the National Transmission Network Development Plan) in accordance with the Rules;
...
(e) any other functions conferred on AEMO under this Law or the Rules in its capacity as National Transmission Planner.
5.22.18 [National Transmission Planner] Functions
(a) Paragraph (b) has effect for the purposes of section 49(2)(e) of the [National Electricity Law].
(b) The [National Transmission Planner] functions also include the following:
(1) developing any forecasts of electricity demand at a regional or connection point level; and
(2) AEMO's functions relating to an Integrated System Plan under clause 5.14.4 and rules 5.16A, 5.22 and 5.23.
(c) AEMO's preparation and publication of Integrated System Plans is undertaken pursuant to, and in satisfaction of, AEMO's [National Transmission Planner] functions under sections 49(2)(a) to (d) of the [National Electricity Law].[45]
jurisdictional derogation means a Rule made at the request of a Minister of a participating jurisdiction that -
(a) exempts, in a specified case or class of cases, a person or a body performing or exercising a function or power, or conferred a right, or on whom an obligation is imposed, under the Rules (including a Registered participant), or a class of such a person or body, or AEMO, from complying with a provision, or a part of a provision, of the Rules in the participating jurisdiction to which the derogation relates; or
(b) modifies or varies the application of a provision of the Rules (with or without substitution of a provision of the Rules or a part of a provision of the Rules) to a person or a body performing or exercising a function or power, or conferred a right, or on whom an obligation is imposed, under the Rules (including a Registered participant), or a class of such a person or body, or AEMO, in the participating jurisdiction to which the derogation relates;
The applicant's step 3: Do the Orders 'modify' s 49(2)(a) or s 49(2)(e)?
(a) did not result in any words being added to s 49;
(b) did not involve any words being omitted from s 49; and
(c) did not involve any words being substituted in s 49.
To meet its prescribed purpose, the 2022 Integrated System Plan (ISP) sets out an optimal development path (ODP) which identifies investments that meet the future needs of the NEM,[54] including actionable and future ISP projects (transmission projects or non-network options), and development opportunities in 'distribution assets, generation, storage projects or demand-side developments that are consistent with the efficient development of the power system's. It guides investors and other decision-makers on the optimal timing and placement of those resources.
The ISP is published every two years as the NEM's operating environment changes. Over the last four years, the pace of the NEM's transformation has pushed the upper bounds of modelled expectations. The costs of utility-scale renewable energy and rooftop photovoltaic systems (PV) have continued to fall, new business models are driving rapid consumer adoption of [Distributed Energy Resources], and coal closures have been brought forward. This rate of transformation will continue to accelerate, supported by NEM state government and Commonwealth Government policies which are largely aligned.
The accelerating shifts in technologies, government policies, participant behaviours and business models, not to mention the complexity of the system itself, mean a single pre-determined path is highly unlikely to fulfil its purpose. This ISP therefore takes a balanced risk-based approach to the NEM's future development, considering a range of scenarios and risks, and carefully examining the upsides and downsides of key decision points.
The Commonwealth Government intends to enable and support delivery of transmission investment needed for this transition with its Rewiring the Nation policy. Governments could further support the transition through a range of potential mechanisms such as changes to the regulatory framework, financial mechanisms to better align benefits with costs and the timing of their imposition, and improved recognition of the impact on landholders and communities hosting the required infrastructure.
Broadly, action is needed on the following fronts:
All actionable projects should progress as urgently as possible. The delivery dates for actionable projects are largely dictated by their earliest practical delivery time as advised by the project proponents. In some cases, the optimal timing would be earlier than what is achievable; in others any earlier delivery provides valuable insurance against faster-than-expected coal closures or slower-than-expected VRE and storage development. As suggested below, supporting policies and mechanisms from the Commonwealth and jurisdictional government may be able to assist in earlier delivery.
For actionable ISP projects identified in this 2022 ISP, the relevant TNSP must assess the project under the RIT-T, using the identified need and investment identified in this section as one of the RIT-T credible options.
(1) Section 16Y(1)(b)(i) permitted the Minister by order, acting under the NEVA, to disapply:
(a) the provisions of s 50F of the Law governing the process required to be undertaken for the augmentation of the network specified in the Orders; and
(b) the Rules which would otherwise provide for the application of the RIT‑T to the augmentation process.
(2) Section 16ZC makes it clear that orders of this kind may disapply the Law or the Rules governing a specified augmentation and that the operation of the Law and the Rules as part of the law of Victoria is subject to such orders.
(3) Section 16Y(4) relevantly provides that a provision of the Rules may be modified in consequence of the disapplication or modification of another provision of the Rules by an order.
(4) The Minister's power to disapply or modify provision of the Law under s 16Y is limited to the provisions within the declared network functions subdivision of the Law.
(5) The Minister's power to disallow or modify the Rules for the purposes of an order under s 16Y(1) is unrestricted.
(6) The reference to the Rules within s 49(2) is to be construed as a reference to the Rules as they apply in Victoria in consequence of the Orders made by the Minister under s 16Y.
(7) The Orders do not modify s 49(2).
(8) The Orders do not have the practical effect of undermining s 49(2).
(9) If, contrary to the above, the Orders are inconsistent with r 5.22 then insofar as is necessary r 5.22 is consequentially modified by the operation of s 16Y(4).
Ground 6 (May Order) - no power to require AEMO (with Transgrid) to publish a 'PACR' that deviates from the ordinary requirements of clause 5.16A.4 of the Rules; no power to dictate or direct what AEMO (or Transgrid) must assess or identify to be the 'preferred option'
- Clause 4.4 of the May Order provides that 'AEMO is conferred the function of preparing and publishing a PACR with Transgrid for VNI West', where 'PACR' is defined in clause 2 as meaning 'a project assessment conclusions report setting out an assessment of the options for VNI West required to be published under clause 4.4 of this Order'.
- Clause 4.5 of the May Order provides that '[f]or the purposes of the PACR for VNI West to be published under clause 4.4, AEMO is required to identify the augmentation specified in clause 3.2 as the preferred option'.
- However, the Minister has no power, whether under section 16Y of the NEVA or otherwise:
(a) to require AEMO 'with Transgrid' to publish a 'PACR', insofar as 'PACR' is defined in clause 2 of the May Order in terms that deviate from what would be the ordinary requirements of clause 5.16A.4 of the Rules for the publication of a 'project assessment conclusions report' as applied by both the NEVA and the NENA; or
(b) to dictate that AEMO (whether alone or with Transgrid) must assess that the works specified in Schedule 1 (where Schedule 1 describes works that were described as 'Option 5A' and the 'preferred option' in the VNI West PACR later published by AEMO with Transgrid) are 'the preferred option', or to direct that AEMO (whether alone or with Transgrid) must identify such work as 'the preferred option',
including in circumstances where the VNI West is identified in the 2022 ISP as a single project with AEMO and Transgrid as co-proponents, and where AEMO and Transgrid have together published the VNI West PSCR and VNI West PADR in accordance with the Rules as applied by both the NEVA and the NENA.
- Accordingly:
(a) the May Decision is affected by a jurisdictional error such that it is amenable to being quashed by an order in the nature of certiorari; and
(b) if the May Decision is quashed, or is affected by jurisdictional error, then the May Order has no legal effect.
(a) in rejecting the applicant's contention that, in relation to the May Order, the Minister had no power to dictate that AEMO 'with Transgrid' must publish a certain document defined as a 'PACR' by the May Order;
(b) in rejecting the applicant's further contention that, in relation to the May Order, the Minister had no power to dictate that AEMO, in publishing the so-called 'PACR', must identify what was set out in Schedule 1 of the May Order as the 'preferred option; and
(c) in rejecting the applicant's contention that the May Order was inconsistent with/repugnant to s 49(3) of the Law.
3.1 The carrying out of all works to construct a new high-capacity transmission line between Victoria and New South Wales connecting the Western Renewables Link with Project Energy Connect to meet the identified need described in the VNI West PADR and all associated works, insofar as such works are an augmentation of the declared transmission system, is a specified augmentation for the purposes of Division 7 of Part 3 of the Act (VNI West).
3.2 Without limiting clause 3.1, the carrying out of all works specified in Schedule 1 is a specified augmentation for the purposes of Division 7 of Part 3 of the Act, insofar as such works are an augmentation of the declared transmission system.
SCHEDULE 1
PREFERRED OPTION - VNI WEST
Construction of a new 500 kV double-circuit overhead line from a new terminal station near Kerang to Dinawan crossing the Murray river north of Kerang to Bulgana Terminal Station (BGTS), including series compensation on the line near Kerang and 500 kV line shunt reactors at both ends of each 500 kV line segment.
Construction of a new terminal station near Kerang, with two 500/220 kV 1,000 MVA transformers and up to +/- 400 MVAr dynamic reactive compensation on the 220 kV network.
Construction of 220 kV connections from the new terminal station near Kerang to the existing 220 kV lines near Kerang.
Construction of two new 500 kV bays and line exits with a total of two 500 kV line shunt reactors at the BGTS.
Modular power flow controllers or other equipment to prevent overloading on 330 kV lines between Upper/Lower Tumut and South Morang and 220 kV lines between Dederang and Thomastown.
Minor augmentations at existing terminal stations impacted by the above works.
Refinement to the works specified above required as a result of further investigation, design and planning.
Any works consequential, or related, to those specified above.
4.1 AEMO must carry out the functions in respect of VNI West conferred on it by this Order under clause 4.4.
...
4.4 AEMO is conferred the function of preparing and publishing a PACR with TransGrid for VNI West.
4.5 For the purposes of the PACR for VNI West to be published under clause 4.4, AEMO is required to identify the augmentation specified in clause 3.2 as the preferred option.
(a) the Minister did not have the power to make an order in the terms of cls 4.1 and 4.5, as the NEVA does not permit the Minister to require AEMO and Transgrid to adopt a PACR that does not conform with the requirements of the National Electricity Rules;
(b) s 16Y(1) does not confer power on the Minister to make an order directing AEMO to select Option 5A as the preferred option in the VNI West PACR; and
(c) by specifying Option 5A as the preferred option, the Minister required AEMO to act in a manner repugnant to its duty to consider the National Electricity Objective.
(a) The Minister has purported to require AEMO to procure Transgrid's assent to the so‑called 'PACR'. However, just as the Minister could not compel Transgrid, she could not achieve the same result indirectly by dictating AEMO procure Transgrid's assent.
(b) It begged the question to find, as the judge did, that Transgrid could lawfully have declined to publish the so‑called 'PACR'. The Minister could not lawfully oblige AEMO to procure Transgrid's assent to the PACR.
Consideration - The direction to act 'with Transgrid'
Victoria Government Gazette, 20 February 2023, Order





























[1] National Electricity (Victoria) Act 2005 ('NEVA'), ss 6 and 7:
6 Application in Victoria of the National Electricity Law
The National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 of South Australia, as in force for the time being -
(b) as so applying may be referred to as the National Electricity (Victoria) Law.
7 Application of Regulations under National Electricity Law
The Regulations in force for the time being under Part 4 of the National Electricity (South Australia) Act 1996 of South Australia -
(a) apply as Regulations in force for the purposes of the National Electricity (Victoria) Law; and
(b) as so applying may be referred to as the National Electricity (Victoria) Regulations.
[2] Section 3(3) of the Schedule to the National Electricity (South Australia) Act 1996 ('Law') provides that '[s]ub-section (2) does not apply to the extent that the context or subject matter otherwise indicates or requires'.
[4] National Electricity Rules, r 5.22.2 ('Rules').
[6] The Victorian electricity transmission network is a declared shared network for the purposes of s 50C.
[8] Rules, ch 10 (definition of 'transmission network services provider').
[13] The Rules seek to expedite actionable projects.
[14] Relevantly, defined in r 5.15.1 as 'as an end user or its representative who, in the AER's opinion, has the potential to suffer a material and adverse [National Energy Market] impact from the investment identified as the preferred option in the [PACR] or the final project assessment report (as the case may be)'.
[16] See National Electricity (Victoria) Amendment Act 2020.
[17] National Electricity (Victoria) Amendment Act 2020, s 1; Explanatory Memorandum, National Electricity (Victoria) Amendment Act 2020; Victoria, Parliamentary Debates, Legislative Assembly, 19 February 2020, 376-8 (Lily D'Ambrosio, Minister for Energy, Environment and Climate Change).
[18] Electricity Infrastructure Investment Act 2020 (NSW), ss 31(1), (2).
[19] The relevant New South Wales TNSP for the interstate connection.
[20] Moorabool and Central Highlands Power Alliance v Minister for Energy and Resources [2023] VSC 774 (McDonald J) ('Reasons').
[23] Reflecting the proposal described in the ISP.
[31] SAS Trustee Corporation v Miles [2018] HCA 55; (2018) 265 CLR 137, 149 [20] (Kiefel CJ, Bell and Nettle JJ); see also 157 [41] (Gageler J), 162-3 [64] (Edelman J); [2018] HCA 55. And see Alcan (NT) Alumina Pty Ltd v Commissioner of Territory Revenue [2009] HCA 41; (2009) 239 CLR 27, 46-7 [47] (Hayne, Heydon, Crennan and Kiefel JJ) and the cases there cited at n 105, n 108 and n 109; [2009] HCA 41; AB (a pseudonym) v Independent Broad-Based Anti-Corruption Commission [2024] HCA 10; (2024) 98 ALJR 532, 537-8 [21] (Gageler CJ, Gordon, Edelman, Steward, Gleeson, Jagot and Beech-Jones JJ); [2024] HCA 10.
[32] Project Blue Sky Inc v Australian Broadcasting Authority [1998] HCA 35; (1998) 194 CLR 355, 381 [69] (McHugh, Gummow, Kirby and Hayne JJ); [1998] HCA 28 ('Project Blue Sky'). See also Minister for Immigration, Citizenship, Migrant Services and Multicultural Affairs v Moorcroft [2021] HCA 19; (2021) 273 CLR 21, 35-6 [15] (Kiefel CJ, Keane, Gordon, Steward and Gleeson JJ); [2021] HCA 19.
[33] Lacey v Attorney-General (Qld) [2011] HCA 10; (2011) 242 CLR 573, 592 [44] (French CJ, Gummow, Hayne, Crennan, Kiefel and Bell JJ); [2011] HCA 10. See also Port of Newcastle v Glencore Coal [2021] HCA 39; (2021) 274 CLR 565, 594 [87] (Kiefel CJ, Gageler, Gordon, Steward and Gordon JJ); [2021] HCA 39.
[35] Commissioner of Taxation (Cth) v Consolidated Media Holdings Ltd [2012] HCA 55; (2012) 250 CLR 503, 519 [39] (French CJ, Hayne, Crennan, Bell and Gageler JJ); [2012] HCA 55.
[36] R v Young (1999) 46 NSWLR 681, 687-8 [15] (Spigelman CJ); [1999] NSWCCA 166. See also Project Blue Sky [1998] HCA 35; (1998) 194 CLR 355, 384 [78] (McHugh, Gummow, Kirby and Hayne JJ); [1998] HCA 28; CTM v The Queen (2008) 236 CLR 440, 509 [237] (Heydon J); [2008] HCA 25. See generally the discussion in Dennis Pearce, Statutory Interpretation in Australia (LexisNexis, 10th ed, 2024) 79-85 [2.61]-[2.65].
[38] We note for completeness that the applicant also contended that s 16Y(4)(a) was subject to the limitation found in ss 16Y(1)(b) and (c), by the operation of the Anthony Hordern principle discussed below (see [112]-[113]). Thus although s 16Y(4)(a) refers in terms to 'a provision of the Law', it is to be understood as confined, by implication, to a provision of the Law within the declared network functions subdivision. The Minister disputed this construction. It is unnecessary for this Court to resolve this issue of construction because, for the reasons which follow, no question of consequential disapplication or modification of the Law as distinct from the Rules arises in the present case. Thus, s 16Y(4)(a) has no work to do in relation to the Orders in issue. Nonetheless, having regard to the terms of s 16ZC to which we next come, we doubt that the applicant is correct.
[39] Section 32 of the NEVA provides:
32 Application of AEMO's declared network functions
Subdivision 3 of Division 2 of Part 5 of the National Electricity (Victoria) Law applies in this jurisdiction.
See section 50(2) of the National Electricity (Victoria) Law.
[40] Cumerlong Holdings v Dalcross Properties [2011] HCA 27; (2011) 243 CLR 492, 501 [21] (Gummow A-CJ, Hayne, Crennan and Bell JJ); [2011] HCA 27.
[41] Anthony Hordern & Sons Ltd v Amalgamated Clothing and Allied Trades Union of Australia [1932] HCA 9; (1932) 47 CLR 1, 7 (Gavan Duffy CJ and Dixon J); [1932] HCA 9.
[42] Leon Fink Holdings Pty Ltd v Australian Film Commission (1979) 141 CLR 672, 678 (Mason J); [1979] HCA 26.
[43] See, eg, Public Service Association and Professional Officers' Association Amalgamated (NSW) v Director of Public Employment [2012] HCA 58; (2012) 250 CLR 343, 355 [18] (French CJ); [2012] HCA 58; Cvetanovski v The Queen (2015) 250 A Crim R 191, 200-1 [53] (Priest JA, Weinberg and Beach JJA agreeing); [2015] VSCA 65; Public Service Association and Professional Officers' Association Amalgamated Union (NSW) v New South Wales [2014] NSWCA 116; (2014) 242 IR 338, [103]-[108] (Basten JA); [2014] NSWCA 116. See also the discussion in Perry Herzfeld and Thomas Prince, Interpretation (Thomson Reuters, 2nd ed, 2020) 294-5 [11.40]; Dennis Pearce and Stephen Argument, Delegated Legislation in Australia (LexisNexis, 6th ed, 2023) 411-12 [19.8].
[44] ADCO Constructions Pty Ltd v Goudappel (2014) 254 CLR 1, 25 [61] (Gageler J) (emphasis added); [2014] HCA 18.
National Electricity Rules or Rules means -
(b) Rules made by the AEMC under this Law, including Rules that amend or revoke -
(i) the initial National Electricity Rules or additional Minister initiated Rules; or
A Minister of a participating jurisdiction, after consulting with the Ministers of the other participating jurisdictions, may request the AEMC to make a jurisdictional derogation in respect of the jurisdiction of which he or she is a Minister.
[48] Noting that rr 5.16A and 5.22 were introduced as from 1 July 2020 subsequent to div 7 of pt 3 of the NEVA on 24 March 2020.
(1) a RIT-T proponent's preferred option for an actionable ISP project fails to satisfy the trigger event set out in clause 5.16A.5(b);
(2) there is no credible option for an actionable ISP project that satisfies the regulatory investment test for transmission under rule 5.16A; or
(3) in the course of assessing a preferred option in respect of an actionable ISP project for the purposes of clauses 5.16A.5(b), AEMO considers that there is a material change to the need for, or characteristics of another actionable ISP project.
[62] Collector of Customs v Agfa-Gevaert Limited [1996] HCA 36; (1996) 186 CLR 389, 398 (Brennan CJ, Dawson, Toohey, Gaudron and McHugh JJ); [1996] HCA 36; Disorganized Developments Pty Ltd v South Australia [2023] HCA 22; (2023) 97 ALJR 575, 580-1 [14] (Kiefel CJ, Gageler, Gleeson and Jagot JJ); [2023] HCA 22.
[63] Uelese v Minister for Immigration and Border Protection (2015) 256 CLR 203, 217 [45] (French CJ, Keifel, Bell and Keane JJ), 232 [100] (Nettle J); [2015] HCA 15.
[66] See Law, s 2 definition of 'application act':
application Act means an Act of a participating jurisdiction that applies, as a law of that jurisdiction, this Law or any part of this Law;
Moorabool and Central Highlands Power Alliance Incorporated
Minister for Energy and Resources [2024] VSCA 201
Cumerlong Holdings v Dalcross Properties [2011] HCA 27; (2011) 243 CLR 492; Anthony Hordern & Sons Ltd v Amalgamated Clothing and Allied Trades Union of Australia [1932] HCA 9; (1932) 47 CLR 1; Leon Fink Holdings Pty Ltd v Australian Film Commission (1979) 141 CLR 672, applied.
(1979) 141 CLR 672
(2024) 98 ALJR 532
(2008) 236 CLR 440
(2014) 242 IR 338
(2016) 260 CLR 500
(1996) 186 CLR 389
(2011) 243 CLR 492
(2014) 254 CLR 1
(2009) 239 CLR 27
(2011) 242 CLR 573
(2021) 274 CLR 565
(2023) 97 ALJR 575
(2015) 256 CLR 203
(1932) 47 CLR 1
(2018) 265 CLR 137
(1998) 194 CLR 355
(2021) 273 CLR 21
(2012) 250 CLR 503
(1999) 46 NSWLR 681
(2012) 250 CLR 343
(2019) 266 CLR 428