[2025] TASSC 41
General information, not legal advice.
Supreme Court of Tasmania
2025-09-03
Porter AJ
Original judgment source is linked above.
CITATION: McDougall v JSA Consulting Engineers Pty Ltd [2025] TASSC 41
HEARING DATES: 15, 19, 22 - 26, 29 - 31 July; 1, 15 August 2024
Written submissions: 9, 30 October; 6 November 2024
Torts - Negligence - Pure economic loss - Particular cases of economic loss - Defective buildings - Damages - Assessment of damages in tort - Property loss - Heads of loss - Economic loss generally - Renovations of residence including addition of second floor level - Original footings inadequate to carry additional load - Resultant subsidence and cracking - Defendant negligent in failing to adequately assess existing footings in prevailing soil conditions and to advise of the need for underpinning - Finding that cause of damage was insufficiency of existing footings.
Damages - Assessment of damages in tort - Property loss - Heads of loss - Economic loss generally - Renovations of residence including addition of second floor level - Original footings inadequate to carry additional load - Resultant subsidence and cracking - Internal defects to the structure - Loss suffered is accordingly pure economic loss - Damages to be reduced by amount plaintiff would have spent on underpinning had the problem been identified at the time of the renovations.
Woolcock Street Investments Pty Ltd v CDG Pty Ltd [2004] HCA 16, 216 CLR 515 followed.
Auburn Municipal Council v ARC Engineering Pty Ltd [1973] 1 NSWLR 513, Bevan Investments Limited v Blackhall and Struthers (No 2) [1978] 2 NZLR 97, De Pasquale Bros Pty Ltd v Cavanagh Biggs & Partners Pty Ltd [1999] QSC 171, [2000] 2 Qd R 461; applied.
Damages - Assessment of damages in tort - Property loss - Particular interests - Interests in land or buildings - Generally - Renovations of residence including addition of significant second floor level - Measure of damages agreed to be costs of restoration - Where significant differences in scope and costs of methods of restoration proposed by each party - Method adopted has to be reasonable - Defendant's proposal would leave plaintiff with a doubtful remedy and a real risk of further and increasing damage.
Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613 followed.
Kirkby v Coote [2006] QCA 61, Metricon Homes Pty Ltd v Softle [2016] VSCA 60, 49 VR 746; applied.
Judgment Number: [2025] TASSC 41
CAMPBELL SYDNEY McDOUGALL v JSA CONSULTING ENGINEERS PTY LTD
(a) A "built-in horizontal misalignment" between the top of the gallery west wall cupboards[1] and the ceiling, the distances being 78 mm at the northern end and 110 mm at the southern end.
(b) Horizontal misalignment of the downstairs bathroom/bedroom doorway (bathroom side) where the top of the architrave to the cornice on the western side is lower by 8 mm than the other side, said to be "consistent with the floor having relative settlement towards the west and a new horizontal ceiling having been installed.";
(c) Compared to the upper floor levels, the lower floor levels generally have a greater fall to the south, starting approximately in the midline of the building, with the lower floor levels falling by 60 mm compared to 40 mm for the upper floor levels.
(a) The reopening of a previous repair above the window in the eastern wall of the lower-level bathroom. Photographs show a crack running at an angle from the point near the right corner of the window to the cornice.
(b) "Mesh within re-opening of previous crack repairs." This is identified in two separate areas of the laundry/store area at the southern end of the building, and in the lightwell, also at the southern end. Photographs show a form of white or light-coloured mesh behind and in cracks in plasterboard.
(c) Areas of lighter and darker mortar in the brickwork at the southern end of the house, the properties of which indicate the lighter coloured mortar is newer "and may be associated with previous repairs." In light of what Mr Kingston says in an earlier part of the report, the reference to the southern end includes a reference to the "Store eastern wall." In that part of the report, he says the lighter mortar is "most likely a previous repair." [My emphasis]
(d) A "previous mortar repair" in the north-eastern corner brickwork of the downstairs bedroom on south-eastern side of the building; "[T]he owner was not aware of this crack having been repaired since his purchase, therefore it has been pre-existing to 2010."
(e) The extent of internal distress within the south end of the house is not consistent with the extent of brickwork distress, "suggesting that previous internal repairs may have been carried out."
"That's a joint in the plaster sheets, isn't it?......You'd have to measure it from the floor. Generally they're about 1.2, but it could well be, it could well be. I'm not just saying it's not, yes."
AS 2870-2011 - Residential slabs and footings
"The soil profile shall be confirmed by inspection of soil from a bore hole(s) or other excavational sampling method in accordance with Clauses 2.4.3 and 2.4.4. Interpretation of the performance of existing residential footing systems within the region that are not less than 10 years and are founded on a similar soil profile shall be in accordance with Table 2.2. ...".
"Did you have any discussion with Mr McDougall at this time about the assessment of ground conditions and footings?......I did. I did. There was discussion - I might stray for a moment. Architects are terrible about discussing the cost of a project with a client, and typically I raise the question about what the intended budget was. The reason I do that is to assist me in scoping what my fee structure's going to be, because as a guidance, I - I charge typically a percentage. And because it's an existing house and the extension was predominantly in the centre of the house, the areas were covered with decks. And I made a comment that I thought the foundations were in good condition given that the house was 25 years old, and that I could see no visible stress, aka movement in the masonry. But I did say that you've always got to consider a contingency, because until I actually see the foundations myself, we've just got to assume that they may need some work. And then there was a discussion about what that work may entail, and I said, 'Well, it's - it's typically - there's a few methods available, but typically it's a process called underpinning, where you may be strengthening the footing.' But I said that it's difficult to predict the cost of underpinning because you have to be careful that you don't underpin one section of the house because you can actually cause more damage, and typically when underpinning is done it's the entire house, because you're trying to stabilise the entire strip footing. And then a - I can't remember if I offered it or if it was asked. I said, 'Look, if worse' - I said, 'Worst-case scenario, it might cost, like, an extra hundred thousand dollars'".
" So, at that stage, we're - I'm still sort of - I'm still mid-January. The actual foundation design happened a week or two later. Did you want me to lead to that or -
Yes?......Yep, okay. So, again you have to keep in mind that AS 2870 was developed I believe in the mid-'80s, refined a few times, but in effect, it's - it's taking actually an economic view of foundation design. And there's some interesting commentary inside it, but in effect, it - engineers are like this. They put a - an economic cost to the country of - you know, why don't we just design every house with two metre deep footings? So, we don't do that, and in effect, what AS 2870 allows you to do is to design alterations based on some sections in the Code. So, I think it's - there's a clause - so - so my point is, the Code is written for new houses primarily, and there's a tiny little paragraph which is quite common with the Code, all the good stuff's hidden. But there is a tiny paragraph, I think it's clause 3.1.5 in the 2011 version that says:
For alterations and additions, that for a clad-framed house or extension to a dwelling -
You know, what does clad-framed mean? Clad-framed means lightweight construction. Weatherboards over timber. Highly flexible. For a clad-framed extension, you can actually take the soil classification back a step. So, if you've said it's an M, if you're doing a clad framed structure, you can actually say it's an S. Now, that's in clause 3.1.5. Now, it also says for masonry veneer extensions. And I'm sure there's been great debate over whether this is a single or a two-storey or whatever, but principally, AS 2870 says this is for the design of class 1 dwellings. Class 1 dwellings being residential. You can also use it for sheds and extensions. But principally, it helps the design. It helps the designer because again, keep in mind, I'm a specialist. I'm a structural engineer, a lot of people don't realise this, but AS 2870 can be used by a lot of different building practitioners. So a lot of people don't realise this, but you don't actually need an engineer to design your foundation if it's M class or less. So why is that relevant? Because there's some juicy stuff in the Code that possibly only engineers understand, and there's some stuff for the lay person. So typically, that Code is deemed to satisfy. So deemed to satisfy footing and slab design for residences. Now, drawing to your question on bearing capacity. So a Code is meant to make the process of design two things, in my opinion. Efficient and standardised. Efficient and standardised. So the Code actually tells you in its commentary. So the cool thing with the Code is you've got the standard and then you've got commentary. And in the 2011 version they've put the two together. So the commentary gives you some assistance to understand it, but the actual Code tells you that these designs are based on certain bearing capacities. So there's a little table in the - in the commentary that says if you've got clad framed, if you've got brick veneer, or if you've got full masonry, double masonry, you - they give you numbers in kilopascals, so pressure, as to what you would anticipate those footings being able to withstand. So in effectively [sic], it says, you know, for a single storey brick veneer it might be, say, 50 kPa. If it's double storey, it will bear about 65.[8] Now, let's just be clear on this. The Standard actually tells you that these are the weights that you're going to get with a full storey, two-storey house. So this is two levels of - of brick veneer. It states that you'd expect to get about 65 kPa. Now, why is that relevant? Because you know that, for a - the Code also tells you that for a slab on ground - and slabs typically are used where you've got softer material. So we use slabs to distribute force, distribute pressure, and -
Perhaps if I can just interrupt you there?......Yep.
What - what bearing capacity did you - ?......Yes.
- this project?......I almost got there. So a slab allows you to design for 50 kPa, and it say, however, if you're doing footings, so isolated footings, and they assume that - or the Code, again, to make it simple, states everything's 300 millimetres wide. So based - these - these likely bearing capacities based on a 300 mil wide footing. And they -and it states that you - you need to - that you - you can't put them in anything less than 100 kPa[9].
Right**. And is that the - the number that you used?**......Yes, it is. And you know that because of the condition of the property." [Emphasis added]
"The March inspection was. In fact, it was an inspection you specifically requested permission to make?......That's not correct.
Oh, I'm sorry. I thought you told me you were driving past the property, saw a tarp up there, rang Mr McDougall and asked if you could come and inspect it, and he said, 'Fine', and you did so the next day. Wasn't that your evidence?......I don't agree with you - your terminology. You're implying it was an inspection. It effectively was a visit to site to meet the builder and the client and to assess how far they had got. That wasn't an inspection."
"Class M requires for masonry veneer a depth of 500 and a width of 300, doesn't it?......Yes.
Yep?......You're - you're referencing the table here? Yes.
If you'd been building this house in 2013, to the design - to the 1983 design, you'd - those are the footings you'd require, aren't they? Once you were satisfied of the class M site?......No, that's not correct.
Why is it incorrect, Mr Horsham?......Well, in this - if you look at the elevation of the - did you call it a living room, dining room? Are we agreed - a living room that it's - there's no - there's no masonry at the top of it.
I'm sorry, there's no - ?......There's no masonry.
I'm talking about the entire house, the footings around the perimeter of this entire house. The strip footings would have been required if you were building it in 2013, to be those dimensions, minimum?......I disagree.
Do you just ignore the standard?......No, that's incorrect, I actually comply with the standard clause 3.15.
So what do you say that clause 3.1.5 tells us that's relevant to the proposition that I'm putting to you?......May I have a copy?
[The witness was referred to a page in the court book]
[M]y first question is, Mr Horsham, if you were building the original building to the original design in 2013, the standard would require you to have those minimum sized footings that I've just put to you, from the table. And you said, "No", and then you referred to 3.1.5, I think?......Which I haven't got it. I need the second page please
[An additional page number was given and cl 3.1.5 read out]
[M]y point is this. You don't have an existing building - you've got a vacant block of land at 3315 Channel Highway, Woodbridge. If you came along to build a house on it to the design - the 1983 design, your footings would have been required to be a minimum of - according to the table?......I'm not going to speculate on that. I think that's an unreasonable proposition.
That's what the standard says, isn't it, Mr Horsham?......I've just read the part of the standard, yes.
Sorry?......I've read the part of the standard that I was referencing as part of my design.
HIS HONOUR: But that's not the question. The question is a hypothetical one. If you were building the original structure in 2013, you would have had to go to the standards and the table we were looking at for the depth of the footings.
WITNESS: Yes. I agree, that's the approach but I don't - I'm not - I don't wish to put forward a design for a hypothetical house."
"What sort of weights did you come up with for the total new structure**?......I didn't do a total new structure calculation.** So I concentrated on the area on the eastern side.
So do you have any recollection at all of reaching some calculated assessment of the likely weight of the new upper storey?......Yes, and it was far less than what the Code stipulates as being allowable.
Yeah, but can you give us a figure?......No, I can't. It's -
You would still have those calculations?......No, I don't.
Mr Holmes, I can tell you, calculated that the additional flooring timber joists, the new joists that were to go in alone, were a total sum of two and three quarter tonnes. Would you dispute that?......I - I can't recall.
Did you ever do any calculation of that kind?......Typically weight of the structure is far less than the dead and live load applied.
Sorry?......So, calculating the weight of a house you'll find that the actual live loads are far in excess. So, generally there's a - an allowed loading for a - for a floor.
Let's be clear, dead weight is the structure - structural elements - ?......Yes.
Live load is things like, people, furniture - ?......Yes.
- and things you put into storage areas that might be moved around. They're transient loads?......No. ... No, that's dead loads". [My emphasis]
"Residential footings designed and constructed prior to the introduction of AS 2870 are known (at least by structural engineers) to be often of a lesser standard than those designed to AS2870."
"Since the design intent was to change the existing loading pattern, and increase loads applied to existing and strip pad footings, as well as applying concentrated loads to new strip and pad footings, investigation and evidence of the adequacy of the existing strip & pad footings, and of the soil profile, to carry such loads, was essential."
(a) Mr. Horsham knew from the outset of the works that the architect designed the upper storey extension apparently knowing nothing about the dimensions of the building's existing footings.
(b) He knew or ought to have known that the upper storey addition would substantially increase the weight of the structure and resulting loadings on the existing footings. Whilst he challenges the proposition that the renovations added substantial additional weight, he could produce no evidence to establish he ever really addressed that question. He says he did some calculations but it is plain that if he did, those were superficially limited to only an unspecified part of the additional structure.
(c) He knew (to at least within a year or two) the age of the building and hence the age of those existing footings, and hence the obvious fact the footings would not have been designed with regard to the relevant standard that applied to design and construction of the alterations in 2013 (that is, AS 2870).
(d) He must be taken to have known that there was at least a good chance that the design and construction of those existing footings would not have been to dimensions that would meet the standards imposed by AS 2870, for a building constructed in 2013 to the original 1983 design, assuming his assessment of the classification under that standard as 'Class M' to be correct.
(e) He must be taken to have known that there was at least a good chance that the design and construction of those existing footings would not have been to dimensions that would meet the standards imposed by AS 2870, for a building constructed from scratch in 2013 to Mr. Tilley's design, with the new upper storey, assuming Mr. Horsham's assessment of the site classification under that standard as 'Class M' to be correct."
"A load from an upper floor can either be transferred to the wall below as a distributed load, i.e. all the joists land on that wall and they each in turn spread the load across the top of a wall. In a situation where you have a supporting beam that supports the joists that either frame into the side of it in the form of a trimmer, or their - or the member is underneath in the form of a bearer with the joists either sitting on it or going over the top of it, the load of all those joists just go into that beam. The beam then is supported at two or more discrete points. If it is a continuous member, it might have one or two intermediate columns. Each of those columns provide what you class as a point load that loads discretely through a column or a double stud onto the floor structure below and into the foundation wall and into the footings, and ultimately - yeah, down to the footing level."
"I believe so. If the original footings had supported the building through 30 years of seasonal fluctuations in moisture, and we have had periods of five or six or seven years of really dry summers, we've had some periods in that time of really wet winters, that house had performed in its original configuration for 30 years to a standard that people were comfortable to live in it and weren't concerned about undue cracking or creaking or movement whatever. So, the footings were performing in a satisfactory manner. So the shrink swell movement of the clay was not adversely affecting the original house structure."
"A down pipe on the SW side displayed indications of an issue so we performed exploratory which [sic] discovered some minor cracks within the pipe. Water had been escaping that at this point with no signs of nuisance. Repairs have been made as well as replacement of the entire down pipe and connection". [My emphasis]
"119 'Where circumstantial evidence is relied upon, it is not in general necessary that all reasonable hypotheses consistent with the non-existence of a fact, or inconsistent with its existence, be excluded before the fact can be found'. 'A rational choice between competing hypotheses, informed by a sense of actual persuasion in favour of the choice made, will support a finding, on the balance of probabilities, as to the existence of the fact in issue.' Nguyen v Cosmopolitan Homes (NSW) Pty Ltd [2008] NSWCA 246 per McDougall J (with whom McColl and Bell JJA agreed) at [55].
120 'All that is necessary is that according to the course of common experience the more probable inference from the circumstances ... should be that the injury arose from the defendant's negligence. By more probable is meant no more than upon a balance of probabilities such an inference might reasonably be considered to have some greater degree of likelihood.' Bradshaw v McEwans Pty Ltd (1951) 217 ALR 1 at 5-6.'
121 In Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298 Dixon CJ at 304 said that an inference must not be drawn where it is but 'a choice among rival conjectures'. There must be '... evidence supporting some positive inference ... and it must be an inference which arises as an affirmative conclusion from the circumstances proved in evidence and one which they establish to the reasonable satisfaction of a judicial mind ... It follows, of course, that 'a court is not authorised to choose between guesses, even on the ground that one guess seems more likely than another or others': ACCC v Metcash Trading Ltd (2011) 198 FCR 297 per Buchanan J at 306 [31]. However, a court is entitled to draw an inference from 'even slim circumstantial facts that exist so long as that goes beyond speculation': Progressive Recycling Pty Ltd v Eversham [2003] NSWCA 268 at [7] per Young CJ in Eq (Ipp JA and Davies AJA agreeing); Condos v Clycut Pty Ltd [2009] NSWCA 200 per McColl JA at [68] (Campbell and Macfarlan JJA agreeing).
123 Evidence of possibility is capable of supporting a probative inference, and expert evidence of possibility may, as circumstantial evidence, alone or in combination with other evidence, establish causation": Seltsam Pty Ltd v McGuiness [2000] NSWCA 29, 49 NSWLR 262 per Spigelman CJ at [89]; McDonald v Girkaid Pty Ltd [2004] NSWCA 297, Aust Torts Reports 81-768, per McColl JA (with whom Beazley JA and Young CJ in Eq agreed) at [104]"
"Oh, it's - it's a complicated one, because we don't know exactly what the footings are like under the house - the internal footings or any - under any load-bearing walls. And we don't know what they originally were, and we don't know exactly how much load's coming down from the extension and how much is to do with - with when the house was a single storey. The footings under the floor were only just capable of coping with the loads, and then the extension was just the last straw."
"It is an expenditure that would have occurred had the geotechnical investigation been conducted earlier. There is no evidence of the 1986 cost of the work, which was presumably less than present cost. However, as [the plaintiff] has had the benefit of the money not spent in 1986 there is probably no reason to reduce the amount of the present cost which should be deleted from the cost of rectification for the purpose of assessing damages."
"[T]he problem with underpinning one section of a building and not the other, what you're actually doing is providing support to that section of the building which is being underpinned, it's now getting support on a different foundation with likely different bearing capacities to the rest of the building. So you will now get differential movement again, because the section that you underpin may well be stiffer than the section that you haven't and then you will get new cracking and movement in locations that you probably didn't have up until this point in time."
"[52] ... In this case, the damage as recovered by the respondents are not disproportionate to the benefit to the respondents in terms of the respondents' entitlement to have a house structure which will be, as it should have been, free from risk to its stability as far as its foundations are concerned. It is only by this level of expenditure that the respondents can now achieve a structure which is as stable as it would have been had it not been for the negligence of the first appellant.
[53] It should be noted here that the researches of counsel for both sides have been unable to identify any case in which it has been held to be unreasonable for a plaintiff to recover the costs of demolition and reconstruction where the defendant's defective work has affected the stability of a house structure. This suggests that the courts will be slow to characterise as unreasonable the position of a plaintiff who is unwilling to 'live with' the risk of the serious consequences which may result from sub-standard work which affects the stability of a structure. ...
[58] In the present case, one is not concerned with the breach of duty which results only in aesthetic disappointment. The service negligently rendered by the appellants to the respondents has not left the respondents with a 'perfectly serviceable' house. [Such a] house is one which is effectively free of risk of slipping. The respondents' house is a house which is affected by a degree of instability which would not have been present had the first appellant properly discharged his duty.
[59] As the High Court emphasised in ... Bellgrove ... because the respondents' damages are assessed 'once and for all', the law must be astute to ensure that the measure of damages accurately reflects the restoration of the respondents to the position they would have been in had the appellants not failed in their duties. The respondents should recover the amount of damages necessary to enable them to own a house free of risk so far as its stability was concerned." [Emphasis added]
[1] The gallery is an upstairs hallway which runs on the western side from about the centre of the residence due south.
(1) If a person has specialised knowledge based on the person's training, study or experience, the opinion rule does not apply to evidence of an opinion of that person that is wholly or substantially based on that knowledge.
(1)
[3] "Consultation on engineering design during the development of the building application documentation". "Design footings, timber and steel framing, bracing, lintels and roof modifications."
[4] See the comprehensive discussion by Shanahan CJ in Valleve Holdings Pty Ltd v Shepperd [2025] TASSC 28 at [95]- [131].
[5] A phrase used by Stephen J in Caltex Oil (Australia) Pty Ltd v The Dredge "Willemstad" [1976] HCA 65; (1976) 136 CLR 529 at 576.
[6] Transcript pp 680 line 12 to 682 line14.
[7] Classification based on soil reactivity appears in cl 2.1.2 and includes class 'A' which relates to such things as rock sites with little or no ground movement from moisture changes.
[8] This would be a reference to the commentary on cl 3.1 of the Standard as referred to in [65] above.
[9] This would be a reference to the Standard, clause 2.4.5 set out in par [64] above.
[10] All depictions of and reference to existing footings on Mr Tilley's drawings are noted to be "assumed". There are also notes on his drawings that he had not been able to get on site to take measurements. Those drawings are dated 4 February 2013.
[11] That strip footing was shown to be 350 mm below ground level. Another digging at the equivalent point on the building but on the south-eastern side, showed that the stripe footing was 230 mm deep and 660 wide, with a depth below the ground level of 500 mm.
[12] The house has no major water supply but is dependent on tank water. That comes from storm water roof catchments with two pipes feeding the tank from the house. There was one tank in place in 2010, but in 2012 the plaintiffs put in a second tank for the purpose of taking overflow from the first, and to increase storage capacity. The charged system means that the water level in the pipes, including the downpipes, is at the same level as the water in the tanks to the southern end of the house.
[13] There are also some comments made in evidence made by Michael O'Halloran, a structural engineer called by the plaintiff to give evidence about his method of rectification and its cost, who strayed into this area of debate while dealing with his methodology.
[14] Transcript pp 572 line 8 to 573 line 34.
[15] An assessment of photographs against oral evidence suggests the real possibility of it being there for up to 22 years before it being cut down. He relied on his opinion about previous cracking and repairs to explain why the building showed no significant signs of damage up to 2013. When pressed, he qualified this to the extent that this was a "possibility" and added that he thought the southern end has subsided before then.
[16] One particular example is provided by his answers in cross-examination about differences in levels taken at different times, first by a surveyor in May 2017 and then by him in 2024. The particular focus was the floor levels across the doorway on the eastern side which had sliding doors fitted. The surveyor's level showed a fall away from the northern end of 8 mm while Mr Kingston's showed a fall in the opposite direction of +16 mm. Despite extensive questioning an answer to the simple question of whether the combined figure of the two measurements represented the net movement of the floor at that point was not forthcoming. See transcript pp 550-551, 594-600.
[17] That is reached by doubling the cost of $25,000 for the designated area at the south to extend it to the western side and multiplying by four to reflect the greater house area as derived from the plans.
[18] Mr O'Halloran said, "... if it's over a very short distance it is a severe outer level. And most places I look at have got that, that's why we are here. So at the end of the day, to be satisfied with something that's that far out as a solution is not really acceptable, especially if it could move more in the future, which it has shown [it] has done now."
[19] Mr O'Halloran's report says, "It was determined that there was approved bearing strata at 14 metres. This was a judgment call made based upon what was found at 12 metres but in my experience, the installation set witnessed at 12 metres would have been adequate to support the underpins in any event."
[20] Mr Reid disagreed with the need for a permit but said he would defer to the opinion of a building surveyor.
McDougall
JSA Consulting Engineers Pty Ltd [2025] TASSC 41
(1954) 90 CLR 613
(1995) 182 CLR 609
(1963) 110 CLR 74
(1992) 175 CLR 479
(1951) 217 ALR 1
(1959) 101 CLR 298
(2011) 198 FCR 297
(1946) 74 CLR 127
(1976) 136 CLR 529