[2023] VSC 203
General information, not legal advice.
Supreme Court of Victoria
2023-04-20
Stynes J
Original judgment source is linked above.
C The Building Act 1993 (Vic)
(a) to regulate building work and building standards; > > ...
(c) to provide an efficient and effective system for issuing building and occupancy permits and administering and enforcing related building and safety matters and resolving building disputes; ...
(a) to protect the safety and health of people who use buildings and places of public entertainment; > > (b) to enhance the amenity of buildings; > > ... > > (d) to facilitate the adoption and efficient application of - > > (i) national building standards; > > ...;
(e) to facilitate the cost effective construction and maintenance of buildings and plumbing systems;
(f) to facilitate the construction of environmentally and energy efficient buildings;
(g) to aid the achievement of an efficient and competitive building and plumbing industry.
(a) sufficient information to show that the proposed building work will comply with the Act and the Regulations;[7] > > (b) in relation to an application for a permit to construct or alter a building:[8] > > > (i) a copy of any planning permit relating to the proposed building work; > > > > (ii) drawings showing the plan at each floor level, elevations, sections, dimensions and the sizes and locations of structural members to a specified scale; > > > > (iii) specifications describing materials and methods to be used in the construction or alteration; > > > > (iv) allotment plans; > > > > (v) a statement of the use or proposed use of all buildings shown on allotment plans; > > > > (vi) a copy of any computations or reports necessary to demonstrate that the building and building work will, if constructed in accordance with the computations and reports, comply with the Act and Regulations; and > > > > (vii) if the application is to alter an existing building, copies of drawings and allotment plans that differentiate between the existing building and the proposed work for which the building permit is sought. > > (c) if there is a contract for the building work, the contract price;[9] > > (d) if there is no contract for the building work, the estimated cost of the building work and details of the method of estimation;[10] and > > (e) if the application is for a particular stage of building work, the extent of the stage, the cost of work for that stage, and the cost of work for the whole of the building work.[11]
(a) issuing the permit; > > (b) issuing the permit with conditions; or > > (c) refusing the permit.
(a) a levy of 0.064 cents in every dollar of the cost of building work for which a building permit is required;[21] > > (b) an additional levy of 0.064 cents in every dollar of the cost of building work for which a building permit is required;[22] and > > (c) a further levy in relation to a staged permit where the whole of the building work costs $1,500,000 or more, being a levy of 0.82 cents in every dollar of the cost of the building work for which the permit is required.[23]
205I Calculation and notification of levy > > ... > > (2) If an application is for a staged permit - > > (a) the relevant building surveyor must -
(i) estimate the cost of the whole of the building work (including the cost of labour and materials), having regard to the information given under section 205H(1A)(a) or (b); and
(ii) estimate the cost of the stage of the building work (including the cost of labour and materials) for which the permit is sought, having regard to the information given under section 205H(1)(a) or (b); and
(iii) without delay, give the Authority and the applicant written notice of the matters specified in subsection (3);
...
(3) For the purposes of subsection (2)(a)(iii), the matters are -
(a) the estimates referred to in subsection (2)(a)(i) and (ii); and
(b) whether the application is for the final stage of the building work.
205H Building permit application must contain information about cost of building work > > (1) An application for a building permit must -
(a) specify the contract price for the building work (including the cost of labour and materials), if there is a contract for the building work; or
(b) in any other case, include sufficient information to enable the relevant building surveyor to estimate the cost of the building work (including the cost of labour and materials).
...
(1A) If an application is for a staged permit, the application must also -
(a) specify the contract price for the whole of the building work (including the cost of labour and materials), if there is a contract for the whole of the building work; or
(b) in any other case, include sufficient information to enable the relevant building surveyor to estimate the cost of the whole of the building work (including the cost of labour and materials).
(2) The requirements of this section are in addition to any other requirements under this Act or the regulations in relation to applications for building permits.
205HA Relevant building surveyor must refuse permit in certain circumstances > > Without limiting the circumstances in which a relevant building surveyor may refuse to issue a building permit under Part 3, the relevant building surveyor must refuse an application for a building permit if the relevant building surveyor is satisfied -
(a) that the contract price for the building work specified in the application is substantially lower than the price normally payable under contracts for building work of that kind; or
(b) that the application -
(i) does not comply with section 205H(1)(b), (1AA)(c) or (1A)(b); or
(ii) contains a statement about the cost of the building work that is false or misleading in a material particular.
(a) a variation made to the building work has resulted in an increase in the estimated cost of the building work; or > > (b) the estimate under s 205I(2) or (3) by the relevant building surveyor of the cost of the whole of the building work was incorrect; or > > (c) the Authority considers that the information provided in the application for the building permit required under s 205H(1A) was incorrect or misleading.
a. I recall I had a discussion with Far East Consortium (I think it may have originally been Aaron Parfit) on or about July 2019 in respect to what was required to be included in the contract sum to be nominated on the building permit. > > b. At the time I recall Far East Consortium contesting the need to include GST, builder's preliminaries, profit, and other matters that they considered non-building works costs, as part of the cost of work. > > c. I asked for the contract sum and advised it was my understanding these components are to be included in the contract sum (in accordance with the VBA guidance). > > d. I generally check the floor area to cost of work ratio when I receive a building permit application form, and I recall for this project it comes in at around $3,000 - $4,000 per m2, which I believed is within an acceptable range. On this basis, I proceeded to issue building permits based upon the contract sum. > > e. I further recall Far East Consortium asking how they could challenge my decision to accept the contract cost of works including all components such as GST, preliminaries, etc. and I advised they could refer the matter to the BAB under s 156 or s 144 of the Building Act (Vic) 1993. > > f. I understand for expediency and to facilitate the issue of Building Permits (the first being, site excavation and retention), Far East Consortium chose to pay the Levy based upon my determination, however advised they would be likely to appeal to the BAB and request a refund of any overpaid levy should they be successful.
(a) By adopting the contract price, the Building Surveyor's estimate of the cost of building work incorrectly included costs that were not 'building work' (as defined in the Act) including: > > > (i) Goods and Services Tax; > > > > (ii) loose furniture, fixtures and equipment; > > > > (iii) the Builder's margin; > > > > (iv) preliminaries (excluding site specific overheads); and > > > > (v) 'non-building permit works', being building works that do not require a building permit; > > (b) When estimating the cost of building work for the purpose of s 205I of the Act, the relevant building surveyor must take into consideration only those costs that are 'building work' as defined in the Act; > > (c) The relevant building surveyor should not adopt the whole of the contract price, verbatim, as the cost estimate of the building work; > > (d) Rather, the relevant building surveyor has to estimate the cost having regard to the contract price of the whole of the building work. The contract price is relevant to, but not determinative of, the relevant building surveyor's function.
Question 1 - Where a party applies for a staged permit under the Act and there is a contract for the whole of the building work, must the relevant building surveyor estimate "the cost of the whole of the building work (including the cost of labour and materials)", for the purpose of s 205I(2)(a)(i) of the Act, by reference only to the contract price of the contract?
(a) we accept the submissions of: > > > (i) the Respondent, that the RBS will have 'no visibility' of what is or is not included in the contract; and > > > > (ii) the Interested Party, that the process is intended to be quick and simple, and that building surveyors cannot be expected to carry out a detailed analysis of the cost of the contract; and > > (b) we note in particular the provisions of s 205HA of the Act. > > RBS must refuse if contract price too low
(a) First, because it provides significant context as to how the relevant provisions of the Act should be interpreted; and > > (b) Second, because it would be redundant if the other provisions were interpreted in a particular way.
(a) the obligation referred to by (then) Senior Member Reigler in Cole-Sinclair was an obligation to ensure that the contract price specified was reasonable (not to undertake a detailed analysis of every possible aspect of the project); and > > (b) in any event, s 205HA (which was enacted after Cole-Sinclair was decided) now makes clear the nature of the obligation and the consequences if the specified price is too low.[31] > > Context
(a) On a proper construction of the Act, the relevant building surveyor must have regard to the contract price for the whole of the building work specified in the application form, but the relevant building surveyor is not confined to that information alone when performing the task required under the Act; > > (b) The word 'estimate' as used in s 205I(2) requires the relevant building surveyor to perform an intellectual exercise. How the relevant building surveyor undertakes that task is a matter for them; > > (c) 'Estimate' is used as both a verb and a noun in s 205I. The relevant building surveyor is to estimate the cost, and then the product of that task, the estimate, is to be given to the Authority. That combination makes clear it is the relevant building surveyor's estimate that is provided, not the contract price; > > (d) The task to be undertaken by the relevant building surveyor (ie, to estimate cost) is the same, whether they are required to have regard to (a) the contract price where there is a contract for the whole of the building work, or (b) in any other case, other information provided by the applicant that sufficiently enables the estimation of cost;[32] > > (e) 'Having regard to' takes its meaning from the context in which it is used.[33] In the context of the Act, 'having regard to' requires the relevant building surveyor to consider the contract price of the building work and give it such weight (if any) as the relevant building surveyor thinks it ought to be given; > > (f) It is implicit from the confirmatory statement in s 205H(2) that the relevant building surveyor will consider other information (other than merely the information provided under s 205H) when performing a cost estimate; > > (g) Having regard to all the matters the relevant building surveyor may consider in deciding whether to issue a building permit, it would be inexplicable to limit them to consider only the contract price when estimating the cost of the building work. In some situations, the specified contract price cannot provide the sole guidance as to the estimate of the cost of the building work for which a building permit is required. These include, for example, cost-plus contracts, profit-sharing guaranteed maximum price contracts, management contracts with a small amount allowed for building work, and (as is the case in this proceeding) contracts that include work which does not require a permit or is not building work; > > (h) The effect of the Board's construction is to erroneously insert the word 'only' after the word 'regard' in s 205I(2)(a)(i).
(a) Properly construed, the contract price is 'the cost of the whole of the building work (including the cost of labour and materials)' within the meaning of s 205I(2)(a)(i). Accordingly, there is no need for the relevant building surveyor to have regard to anything other than the contract price. The relevant building surveyor is required to adopt the price nominated by the applicant in their permit application as the estimate; > > (b) The plaintiffs' construction depends on reading words and phrases, such as 'estimate', 'having regard to' and 'for which a building permit is required', in isolation without regard to the legislative scheme as a whole or its evident purpose. If adopted, the plaintiffs' construction would require relevant building surveyors to undertake lengthy and burdensome exercises of estimation before issuing building permits. One of the purposes of the provisions is to provide for a simple process of cost estimation by the relevant building surveyor. This purpose is supported by the fact that the task of estimation is given to the relevant building surveyor, not a quantity surveyor. Requiring a relevant building surveyor to second-guess the specified contract price by reference to an unstated list of alternative information would press the provisions of the Act beyond its language.[34]
(a) The Authority accepted that the process of 'estimation' involves an intellectual exercise and 'does not involve arbitrarily seizing upon any figure', but submitted that the nature of the exercise must be understood by reference to the statutory context. Here, the intellectual exercise differs depending on whether or not there is a contract price: > > > (i) If there is no contract for the building work, the relevant building surveyor must estimate the cost of the building work having regard to the information provided under s 205H(1)(b) and (if the application is for a staged permit) s 205H(1A)(b), which will require the relevant building surveyor to form a judgment, based on that information, about the cost of the building work. > > > > (ii) If there is a contract, the relevant building surveyor must first assess whether the specified contract price is 'substantially lower than the price normally payable under contracts for building work of that kind' pursuant to s 205HA(a). If a negative answer is given to that question, then the relevant building surveyor must estimate the cost of the building work having regard to the contract price pursuant to s 205I(1)(a)(i) or (if the application is for a staged permit) ss 205I(2)(a)(i)-(ii). > > > > (iii) Thus, it submitted the two processes of 'estimation' required by s 205I are different. The Act stipulates different processes and requirements in relation to the information the relevant building surveyor must have regard to when undertaking each type of 'estimate'. Parliament has used a single word, 'estimate', to describe both processes. But this does not mean that the same process, or a process of similar complexity, is involved in each case. > > (b) The phrase 'having regard to' may bear different shades of meaning. Section 205I(2)(a)(i) provides that the relevant building surveyor 'must ... estimate the cost of the whole of the building work ... having regard to the information given under section 205H(1A)(a) or (b)'. Thus the language of the statute is mandatory, and the only matter to which the relevant building surveyor is required to have regard is the information provided under ss 205H(1A)(a) or (b). The proper construction is that the relevant building surveyor must estimate the cost having regard to that specified information and not to other information.[36] > > (c) Section 205H(1A) provides an important piece of context. It uses the word 'specify', which indicates that the contract price will play a central part in the calculation and collection of the levy.[37]
(a) the process of statutory construction starts with the actual text of the statute. The text, however, is to be considered in light of the context and purpose of the statute or particular provision including the mischief it is seeking to remedy; > > (b) determination of the purpose of a statute or of particular provisions in a statute may be based upon an express statement of purpose in the statute itself, inference from its text and structure and, where appropriate, reference to extrinsic materials; > > (c) extrinsic materials cannot be relied on to displace the clear meaning of the text; > > (d) the court may depart from the literal meaning where, for example: > > > (i) the literal meaning would conflict with other provisions of the statute; > > > > (ii) the literal meaning is inconsistent with the purposes of the statute; > > > > (iii) the literal meaning is incapable of practical application; or > > > > (iv) adoption of the literal meaning would lead to a result that is absurd, unreasonable or anomalous; > > (e) however, departure from the literal meaning will only be justified if the alternative construction is 'reasonably open' and 'consistent with the language in fact used by the legislature'.
-verb (t) 1. to form an approximate judgement or opinion regarding the value, amount, size, weight, etc., of; calculate approximately. > > 2. to form an opinion of; judge.
5. a judgement or opinion, as of the qualities of a person or thing; estimation or judgement. > > 6. an approximate statement of what would be charged for certain work to be done, submitted by one ready to undertake the work.
(a) The first would be prescriptive, by requiring the adoption of the contract price where there is a contract for the whole of the building work;[48] and > > (b) The second would call for an exercise of judgment where there is no contract, based on information relevant to the cost of building work provided by the applicant for the building permit.[49]
(a) Assessing the application and deciding whether a building permit should be issued with or without conditions, or otherwise refused.[51] Every application is required to be accompanied by prescribed information sufficient to show that the proposed building work will comply with the Act and the Regulations.[52] The relevant building surveyor may also require an applicant to provide additional information or documents, or to amend the application, if the relevant building surveyor considers this necessary to deal further with the application;[53] > > (b) Applying to the Authority for a building permit number for the proposed building permit. In doing so, they are required to include the cost estimate they have prepared under s 205I;[54] > > (c) An obligation to refuse an application unless they are satisfied that the building work and the building permit will comply with the Act and the Regulations;[55] > > (d) An obligation to refuse an application if they are satisfied that:[56] > > > (i) the contract price for the building work specified in the application is substantially lower than the price normally payable under contracts for building work of that kind; or > > > > (ii) the application: > > > > * (1) does not comply with ss 205H(1)(b), (1AA)(c) or (1A)(b); or > > * (2) contains a statement about the cost of the building work that is false or misleading in a material particular.
(a) is directed to the applicant, as they are the party who must specify the contract price in their permit application; and > > (b) it does not operate to define the task to be undertaken by the relevant building surveyor under s 205I.
(a) The plaintiffs have sought to quash all of the orders made by the Board answering Questions 1 to 4; > > (b) Questions 1 and 2 are questions of law; > > (c) Although answering Question 1 is all that is needed to justify an order of the court quashing the whole of the Board's determination, the Court, in analysing the answer to Question 1, may need or desire to form and express an opinion about Question 2; > > (d) Nothing precludes the Court from answering issues of law which arise in its consideration of the correctness of the answer to Question 1. Strictly speaking, the reasons for that opinion might technically be obiter dicta, but it is a matter for the Court to decide whether to formulate reasons giving guidance to the Board concerning Question 2; > > (e) If the Court determines that there is an error of law in the Board's answer to Question 1, then Question 2 is to be answered by the Board when remitted back to the Board for its determination in accordance with law.
(a) Due to the answer the Board gave to Question 1, Question 2 was not required to be answered; > > (b) It is open to the Court to consider all of the reasons the Board gave for its answer to Question 1, even if some of those reasons might also be relevant to Question 2; > > (c) If the Court determines that the Board made an error of law in making its determination under review, then the appropriate orders to be made by the Court should not include a direction to the Board to answer Question 1 or Question 2 in any particular way. Instead, the appropriate orders would be to quash the Board's determination and an order in the nature of mandamus requiring the Board to reconsider and determine the matter in accordance with law.
(a) the determination and orders of the Board dated 3 October 2022 be quashed; and > > (b) the matter be remitted to the Board to consider and determine in accordance with law.
[1] See Building Act 1993 (Vic) pt 10 ('Act').
[2] See ibid s 3(1) (definition of 'relevant building surveyor').
[4] Ibid s 3(1) (definition of 'building work').
[7] Building Regulations 2018 (Vic) reg 24(4) ('Regulations').
[12] Act ss 3(1) (definition of 'staged permit'), 20(b).
[14] See ibid s 19(2); Regulations reg 35.
[24] Ibid s 205I(2)(b). See also ibid s 205I(1)(b) in relation to an application for a building permit other than a staged permit.
[27] All figures are exclusive of GST unless otherwise specified.
[28] Court Book 283, Email correspondence.
[29] Court Book 42-5, First plaintiff's written submissions dated 2 October 2022, [43]-[60].
[30] Court Book 196-7, Building Appeals Board determination and orders dated 3 October 2022, [45]-[60] (emphasis in original).
[31] Referring to Cole-Sinclair v Building Practitioners Board (Review and Regulation) [2014] VCAT 902.
[32] Transcript of Proceedings, May21 Pty Ltd v Building Appeals Board (Supreme Court of Victoria, Stynes J, 9 February 2023) 39-40, 50 ('Trial Transcript').
[33] Citing Manns v Kennedy [2007] NSWCA 217, [112] (Campbell JA, with Santow JA and Bryson AJA agreeing); Rathborne v Abel (1964) 38 ALJR 293, 294 (Barwick CJ), 301 (Kitto J).
[35] P Hanks and G Ayres, 'Outline of Submissions of the Third Defendant', Submissions in May21 Pty Ltd v Building Appeals Board, S ECI 2022 03744, 9 February 2023, [16]-[27].
[36] Trial Transcript (n 32) 87-8, citing Manns v Kennedy [2007] NSWCA 217, [112] (Campbell JA, with Santow JA and Bryson AJA agreeing).
[40] Court Book 195, Building Appeals Board determination and orders dated 3 October 2022, [40]-[43].
[43] See Craig v South Australia [1995] HCA 58; (1995) 184 CLR 163, 164 (Brennan, Deane, Toohey, Gaudron and McHugh JJ).
[44] [2020] VSCA 267; (2020) 63 VR 150, [53]-[64] (Kyrou , Kaye and Sifris JJA).
[45] Macquarie Dictionary (8th ed, 2020) 'estimate'.
[47] Ibid 280 (Hill J, with Northrop and Lockhart JJ agreeing).
[50] Manns v Kennedy [2007] NSWCA 217, [112] (Campbell JA, with Santow JA and Bryson AJA agreeing).
[52] Ibid s 18, sch 2 cl 1(a)-(b); Regulations reg 24(4).
May21 Pty Ltd
Building Appeals Board [2023] VSC 203
BUILDING AND CONSTRUCTION - Statutory construction - Application for staged building permit - Contract for whole of the building work - Matters a relevant building surveyor may have regard to when estimating the cost of the whole of the building work for which a staged building permit is sought - Building Act 1993 (Vic) s 205I(2)(a)(i) applied - Verraty Pty Ltd v Richmond Football Club Ltd [2020] VSCA 267; (2020) 63 VR 150 applied.
STATUTORY CONSTRUCTION - Building Act 1993 (Vic) s 205I(2)(a)(i) - Whether relevant building surveyor is required to adopt the contract price as the estimate of the cost of the whole of the building work - Australia and New Zealand Banking Group Ltd v Commissioner of Taxation (1994) 48 FCR 268 applied - Manns v Kennedy [2007] NSWCA 217 applied.
(2020) 63 VR 150
(1994) 48 FCR 268
(1964) 38 ALJR 293
(1995) 184 CLR 163