[2014] VCAT 902
Victorian Civil and Administrative Tribunal
2014-07-24
Original judgment source is linked above.
(1) For the purposes of Part 4 of the Act the mandatory notification stages are -
(b) prior to pouring an in situ reinforced concrete member nominated by the relevant building surveyor; and
(2) The relevant building surveyor may vary a stage set out in subregulation (1) in relation to building work if it is inappropriate to the building work.
(3) The mandatory notification stages for building work determined in accordance with subregulation (1) or (2) must be set out in the building permit for that building work.
Council records show that Building Permit 38978/0 was issued by Combined Building Consultants on 4 April 2007 for 3 dwellings, 3 garages and 2 carports to existing 2 units.
Council received copies of the occupancy permits for units 3, 4 and 5 on 9 July 2007, however it has come to my attention that Council has not received certificates of final inspection for the new carports to the existing units 1 and 2, which have been constructed, see attached aerial photo.
Can you please forward copies of the certificates of an inspection and inspection approval dates for the carports to Council within 7 days as required by regulation 1012.
The Building permit required the building work to be completed by 4 April 2009 and if a final inspection on the carports has not been approved would you please investigate this issue and take the necessary action to resolve this matter as the Relevant Building Surveyor for these works.
Please advise this office of any action taken within 30 days of this letter. If no advice or documentation is received, this matter will be forwarded onto the Building Practitioners Board for investigation.
Allegation one - ground for inquiry - paragraph 179(1)(b)
On or around 4 April 2007 and in relation to building work, namely the construction of two carports adjacent to existing dwellings at ... Mooroolbark, you failed to carry out your work as a building practitioner in a competent manner and to a professional standard and therefore failed to comply with regulation 1502(a) of the Building Regulations 2006 - in issuing building permit number 38978/0, you failed to require that a certificate of final inspection be obtained in respect of the carports.
Allegation 1 - ground for enquiry - paragraph 179 (1) (b)
After having considered the evidence put before it, the Board has decided in relation to the guilty verdict to the two (2) allegations to:
It is the decision of the Board having considered the submission put before it, that the building practitioner pays the total costs incidental to the inquiry in the sum of $3,117.
(a) perform his or her work as a building practitioner in a competent manner and to a professional standard; and ...
(1) The Governor in Council may make regulations for or with respect to -
(j) professional standards to be observed by registered building practitioners in the different categories or classes; [emphasis added]
In the interpretation of the provision of an Act or subordinate instrument -
(a) a construction that would promote the purpose or object of an Act or subordinate instrument (whether or not that purpose or object is expressly stated in the Act or subordinate instrument) shall be preferred to a construction that would not promote that purpose or object; and ...
(a) may be of general or limited application; and ...
(1) Every subordinate instrument shall be construed as operating to the full extent of, but so as not to exceed -
(a) the legislative power of the State of Victoria;
(b) the power to make the subordinate instrument conferred by the Act under or pursuant to which it is made -
to the intent that where a provision of a subordinate instrument, or the application of any such provision to any person, subject-matter or circumstance, would, but for this section, have been construed as being in excess of that power, it shall nevertheless be a valid provision to the extent to which it is not in excess of that power and the remainder of the subordinate instrument and the application of that provision to other persons, subject-matters or circumstances shall not be affected.
(b) has failed to comply with the Act or the Regulations; or
(d) has been guilty of conduct in relation to his or her practice as a building practitioner which:
(i) is constituted by a pattern of conduct or by gross negligence or gross incompetence in a particular matter; and
(ii) shows that he or she is not a fit and proper person to practise as a building practitioner ...
In our view, unprofessional conduct is not necessarily limited to conduct which is disgraceful or dishonourable, in the ordinary sense of those terms. It includes, we think, conduct which may be reasonably be held to violate, or fall short of, to a substantial degree, the standard of professional conduct observed or approved by members of the profession of good repute and competency.[7]
The test to be applied is whether the conduct violates or falls short of, to a substantial degree, the standard of professional conduct observed or approved by members of the profession of good repute and competency.[10]
(a) In Part 6, s 76 the prescribed functions of a relevant building surveyor are (a) the issuing of building permits; (b) the carrying out of inspections of buildings and building work under part 4; (c) the issuing of occupancy permits and temporary approvals under Part 5;
(b) In Part 7, s 87 the prescribed function of a relevant building surveyor is to determine protection works required to protect an adjoining property notwithstanding differing opinions expressed by an owner and an adjoining owner;
(c) Sections 106, 111, 112, 113 of Part 8 confer power on a relevant building surveyor to issue notices and orders including stop work orders with respect to building works to ensure the works are being carried out in accordance with the Act and the Regulations, including any protection work requirements.[14]
(1) The relevant building surveyor must issue a certificate of final inspection on completion of the inspection following the final mandatory notification stage of building work if -
(a) an occupancy permit is not required for the building work; and
(b) all directions given under this Part in respect of the building would have been complied with.
(2) A certificate of final inspection is not evidence that the building or building work concerned complies with this Act or the building regulations.
Does a private building surveyor's role end when the building permit lapses?
(1) Subject to subsection (3), the appointment of a private building surveyor under this Part cannot be terminated without the written consent of the Commission. [now Victorian Building Authority]
(2) If building work in respect of which a private building surveyor is appointed is terminated before commencement or completion, the owner of the land on which the building work was to be carried out must notify the Commission and the relevant municipal council of the termination of the building work.
(3) On receipt by the Commission of a notice under subsection (2), the appointment of the private building surveyor is deemed to be terminated.
(5) This section applies despite anything to the contrary in terms of the appointment or in any other Act or rule of law.
A relevant building surveyor must within seven days after the end of each month forward to the Commission in a form approved by the Commission -
(a) details of permits and certificates of final inspection issued by the relevant building surveyor during that month; and
(b) details to the knowledge of the relevant building surveyor of -
(i) any building work that is commenced, completed or abandoned during that month; or
(ii) any building permit that lapses during that month.
(1) A person who is in charge of the carrying out of building work to which a permit has been issued under Part 3, must notify the relevant building surveyor without delay after completion of each mandatory notification stage of the work...
34 Inspections at mandatory notification stages
On being notified that a mandatory notification stage has been completed, the relevant building surveyor must cause the building work concerned to be inspected.
The relevant building surveyor (RBS) must follow proper administrative procedures for lapsed building permits and those approaching their expiry date. The RBS and the owner of the building each have specific responsibilities, depending on the status of the permit and the building work. Where the RBS declines to grant an extension, the owner may apply to the Building Appeals Board (BAB) to overturn the decision.
An owner or agent on behalf of the owner may seek an extension of time from the RBS for the commencement and/or completion of the building work before the permit expires.
The RBS may grant this extension if the extent of the building work warrants an extension of time. If the RBS refuses to grant an extension of time for the permit, the owner may appeal the decision of the RBS through the BAB.
Where a building permit has lapsed the RBS remains responsible for administering any necessary enforcement procedures, under Part 8 of the Building Act 1993 (The Act).
The Owner or agent on behalf of the owner, of building work not commenced or completed must obtain a new building permit from the RBS. Where a private or municipal building surveyor (MBS) is the RBS who issued the original building permit, he/she remains as the building surveyor for the functions related to the building permit and only the same building surveyor can issue a new building permit for those same functions. A building permit could only be issued by another private building surveyor (PBS) upon application of section 81 of the Act (termination of appointment) or if the entire design of the project differs from the original design approved under the original building permit issued...
The RBS clearly has a responsibility to address lapsed building permits and therefore it is important that office procedures be implemented to administer the requirements of the Regulations.
To assist proper administration of building permits and inspections, and reduce the number of lapsed building permits, the following procedures are suggested:
At the time of issuing the building permit it is recommended that the RBS highlight the important information regarding the building permit which the owner builder has a responsibility during construction...
Building surveyors must also maintain a record keeping system, so that owners can be reminded when the building permits are about to expire. At this stage the procedure, administrative fees and consequences relating to lapsed building permit should not be a surprise if these matters were previously highlighted by the RBS at the time the building permit was issued.
An option for the RBS is to commence enforcement action by issuing a building notice under section 106. The requirements for a final inspection and the issue of a certificate of final inspection or an occupancy permit is clearly a condition of the building permit. Section 106 (a) of the Act states that a building notice can be issued if building work has been carried out in contravention of the building permit. Failure to complete the building work within the time limit stated on the permit would be considered a contravention of the building permit. Details of lapsed building permits must be included on the "building work inspection, completion or permit lapse return", submitted monthly to the Building Commission.
An owner of land or a building must not carry out domestic building work as builder on that land or in respect of that building if the cost of the work (estimated in accordance with section 201) is more than $12,000 unless the owner -
(a) has been issued with a certificate of consent for the work; or
(b) is a builder who is registered under Part 11; or
(c) is an architect which is registered under the Architects Act 1991; or
The following bodies are reporting authorities for the purposes of the application of this permit in relation to the matters set out below:
Prescribed Reporting Authorities Matter Reported On Regulation
I said: On what did you base your decision or how do you conclude the estimate of $11,000 was adequate?
He said: Looking at the plan, I estimate that about $5K each for the carport and gazebo and about $1K for the front fence or $2K at most. Also the fact that the owner builder was going to undertake work would keep the building costs down.
8.2 In my opinion the reasonable value of the gazebo work was $38,177 at September 2009 prices. Refer to appendix A for a detailed breakdown of the cost.
8.3 In my opinion the reasonable value of the carport was $16,775 at September 2009 prices. Refer to appendix B for a detailed breakdown of the cost.
8.4 In my opinion the reasonable value of the front fence was $7,674 at September 2009 prices. Refer to appendix C for a detailed breakdown of the cost.
8.6 I have been asked to identify the cost of materials. For this purpose I have identified the principal materials to be supplied for each item in my assessment and costed those materials.
8.7 In my opinion the reasonable value of the materials required for the gazebo was $12,514 at September 2009 prices. Refer to appendix D for a detailed breakdown of the cost.
8.8 In my opinion the reasonable value of the materials required for the carport was $5,961 at September 2009 prices. Refer to appendix E for a detailed breakdown of the cost.
8.9 In my opinion the reasonable value of the materials required for the front fence was $2,089 at September 2009 prices. Refer to appendix F for a detailed breakdown of the cost.
- This structure was to be constructed on a concrete slab which included stiffening beams and reinforcement.
- The structure was to be enclosed on both the rear and side boundaries and was to include 3.0 m high fire rated walls on these boundaries.
- The structure was to be constructed with 190 mm x 45 mm F7 rafters with colourbond steel tray deck roof.
- The structure was going to be rendered and painted.
- This structure was to be constructed on a concrete slab which included stiffening beams and reinforcement.
- The roof structure was to be a polycarbonate roofing material.
- The fence was to be constructed with brick piers, being separated by a brick dwarf wall in between the piers and then an infill of red gum sleepers.
- The estimated cost of these works did not include the value of the sleeper infill.
- Footings were to be constructed to a depth of 600 mm.
- There was the inclusion of a gate within the fence area.
- The fence (including the gate) was to be approximately 11.55 metres in length.
The relevant building surveyor must estimate the cost of the building work for which the application is sought (including the cost of labour and materials), having regard to the information given under subsection (4)(a) or (b), and must without delay give written notice of the estimate and the amount of levy payable to the applicant.
(4) In addition to anything else required to be stated in an application for a building permit, the application must state -
(a) the contract price for the building work (including the cost of labour and materials), if there is a contract for the work; or
(b) in any other case, sufficient information to enable the relevant building surveyor to estimate the cost of the building work (including the cost of labour and materials).
[1] The second allegation concerning the Mooroolbark Permit is referred to as Allegation 3 in the Notice of Decision of the BPB dated 30 May 2013.
[2] The Mooroolbark Allegation is referred to as Allegation 2 in the Notice of Decision of the BPB dated 30 May 2013.
[3] The Hampton Allegation is referred to as Allegation 1 in the Notice of Decision of the BPB dated 30 May 2013.
[9] [1990] 1 Qd. R 498 at 507.
[10] [1999] VSC 113 at [23].
[13] See the Act s 2 and Part 12, Division 5.
[18] [2014] VSC 272 at [29].