The construction of a seven storey building comprising two offices and three retail/food and drink premises at ground floor with six levels of residential apartments (64 dwellings) above plus car parking for 50 cars with basement access from Breese Street, in accordance with the endorsed plans.
Before the use or development commences, amended plans to the satisfaction of the responsible authority must be submitted to and approved by the responsible authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be drawn to scale with dimensions and three copies must be provided. The plans must be generally in accordance with the plans prepared by Peter L Brown Architects Pty Ltd (Job No. 0928) dated April 2011 comprising sheets TP03, TP04, TP05, TP06, TP07 and TP08 (all Revision D) but modified to include:
Before the development starts the Sustainability Statement (ESD) prepared by Ark Resources dated 20 June 2011 must be amended to the satisfaction of the Responsible Authority and endorsed by it. Once endorsed, it will form part of the permit. The amended Sustainability Statement must include the following initiatives:
(a) be updated to reference the plans to be approved under condition 1 of the permit (i.e. providing for an additional 10 dwellings compared with the original approval);
(b) low volatile organic compound (VOC) paints to be used internally in accordance with Green Star Multi-Residential V1 criteria;
(c) rainwater harvesting system connected to apartments on levels 1 and 2 and the retail area toilets;
(d) heating and cooling to be within one star of Best Available Technology;
(e) all air-conditioning systems to use a zero ODP refrigerant;
(f) task lighting for kitchens and bathrooms providing a minimum of 300 lux at the kitchen sink, cooktop and vanity;
(g) a Building Users Guide including information relevant for building residents and management made available to the building owner and residents;
(h) no water based heat rejection system servicing the building; and
(i) extraction fans for apartment kitchens to be ducted externally.
Mr Scally called Mr Mark Sheppard, Urban Designer, David Lock & Associates to give expert evidence.
The applicant also relied on the written expert report of Mr Russell Fairlie, Traffic Engineer, Ratio Consultants Pty Ltd.[1]
General observations about the use of section 87A of the Planning and Environment Act 1987
Opportunities for redevelopment of land to the east
[1] Mr Fairlie was not called to give evidence before the Tribunal by agreement between the parties and Member Cook.
[2] Maison the Development Pty Ltd v Moreland CC & Ors [2011] VCAT 219.
[3] and that it accepted Mr Fairlie's evidence in this regard.
[4] (Red Dot) [2011] VCAT 520, a decision of Deputy President Dwyer and Member Naylor.
[5] See, for example the recent decision of Marone Pty Ltd Joint Venture v Glen Eira CC (Red Dot) [2011] VCAT 1650, a decision of Senior Member Baird.
[6] Using the terminology of section 87A.
[7] Per Blue Earth Group Pty Ltd v Moreland CC & Ors [2011] VCAT 1211, albeit in a different DDO area (Schedule 13).
[8] That is, 22 one bedroom apartments would not be provided with on site parking.
[9] As per the evidence, stackers would facilitate taller vehicles of up to 1.8 metres on both upper and lower platforms.
[10] Following on from that submitted to the responsible authority in June 2011.
[11] As opposed to materials to be used in construction.
Maison The Development