[2025] QCAT 209
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2025-05-29
Original judgment source is linked above.
PROFESSIONS AND TRADES - BUILDERS - STATUTORY POWER TO REQUIRE RECTIFICATION OF DEFECTIVE OR INCOMPLETE BUILDING WORK - where the QBCC issued a direction to rectify work - where the consumer made an application to review the decision of the QBCC - where the consumer seeks an order on review from the Tribunal substituting a direction that another contractor carry out rectification - whether it is unfair in all of the circumstances to require rectification
Chelbrooke Homes Pty Ltd v Queensland Building and Construction Commission [2022] QCAT 83
Hall v Queensland Building and Construction Commission [2020] QCAT 379
Interlink Developments Pty Ltd v Queensland Building and Construction Commission [2020] QCAT 480
Rosecove v Queensland Building and Construction Commission [2023] QCAT 101
Statutory obligations imposed on the Commission
(a) ensuring the maintenance of proper standards in the building industry; and
(b) achieving a reasonable balance between the interests of building contractors and consumers.[1]
(a) confirm or amend the decision under review;
(b) set aside the decision and substitute its own decision; or
(c) set aside the decision and return the matter for reconsideration to the decision-maker for the decision, with the directions the tribunal considers appropriate.[7]
Item 1 Main bedroom - gap fill cracks on walls/ceilings and windows above French doors do not open
Item 2 En suite - gap fill multiple cracks on walls/ceilings
Item 3 Walk in robe - gap fill cracks on walls/ceilings
Item 4 Living room - gap fill cracks on walls/ceilings
Item 5 Kitchen - gap fill multiple cracks on ceilings
Item 6 Linen cupboard/walkway - gap fill cracks on walls/ceilings
Item 7 Kitchen - paint window outside of kitchen not complete - paint on steps bubbling
Item 8 Everywhere - gap fill cracks - all rooms around house
Item 10 Laundry - gap fill multiple cracks on walls
Item 11 Walkway - gap fill multiple cracks on walls
Item 12 Basement - gap fill multiple cracks on walls - painting not complete
Item 16 Bedroom 2 - French doors do not open
Item 17 Everywhere - adequate preparation not conducted resulting in cracks and peeling...
Item 18 Everywhere - not painting 3 coats of paint ...
Item 19 Downstairs bathroom/laundry - discolouration of skirting boards - not white
Item 20 Interior skirting boards, wall frames and ceilings in walk in robe plus back stairs - use of wrong paint
Gap fill multiple cracks around the house - cielings (sic), new VJ sheeting, old VJ sheeting, living room roof, wardrobe roof, bedroom wall, laundry wall, ...
Inside bay windows...
(a) Item 17 everywhere - Adequate preparation not conducted resulting in cracks and peeling... there are cracks everywhere around the house...;
(b) Item 18 everywhere interior and exterior - Not painting 3 coats of paint.
(a) Cracks of approximately 0.5mm in the paintwork between the tongue and groove boards in multiple locations in the main bedroom. He did not observe any gap filler inside many of the gaps. He did not observe defective building work on the ceiling lining. The breezeway window above the French doors had been painted shut.
(b) A gap of approximately 1mm wide between the timber cornice and the wall tiles and a crack of approximately 0.5mm in the T & G ceiling lining above the shower in the en-suite.
(c) A crack of approximately 0.5mm in the T & G wall lining and 3 full length cracks up to approximately 1mm wide in joints in the T & G ceiling lining in the walk-in robe.
(d) Multiple cracks approximately 0.5mm wide in the T & G wall on the front wall and left hand side wall, cracks approximately 0.5mm wide in the MDF T & G sheets on the right hand side wall and cracking approximately 0.5mm wide between the T & G wall lining and skirting boards in the living room. In cross-examination he said he had observed 30 to 40 boards that had not been 'Gapped'.
(e) Almost every T & G ceiling joint in the kitchen was cracked.
(f) An unfilled crack of approximately 1mm between the right hand side of the French door jamb and the adjacent MDF VJ wall lining and unfilled cracks at the junction of the MDF VJ wall lining and the door jambs on both sides of the entry in the linen cupboard/walkway.
(g) Paint missing from the centre area of the bottom three front entry steps.
(h) Regarding item 8 of the complaint; that Mr Keep agreed that the interior cracks and gaps had been previously addressed in items 6 to 8.
(i) Gaps and cracks up to approximately 1.25mm wide in the VJ wall/ceiling junctions and around the exposed sub-floor structure of the laundry.
(j) The breezeway window above the French doors in bedroom 2 had been painted shut.
(k) Regarding item 17 of the complaint, that there had been inadequate preparation resulting in cracks, that the item had been previously addressed.
(l) That there were gaps up to approximately 0.5mm between the new pine and pre-existing chamferboards and vertical timber stops on the right hand side exterior of the house.
(a) whether or not certain areas had received 3 coats of paint (part of item 18); or
(b) on the type of paint that had been used.
(a) items referred to in the inspection report, but not the subject of a direction;
(b) items not the subject of a direction, but identified and discussed at the inspection.
(a) Item 7, incomplete paintwork to the kitchen windows; and
(b) Item 12, painting not complete in the basement.
Inspection by Master Painters Association (Qld)
(a) whether there is any defective work the subject of the complaint which has not already been the subject of the DTR; and if so
(b) whether it would be unfair to direct the painter to rectify that work.
Defects identified as 'everywhere' in the complaint
It's important that you tell us about every item when filling out this form. Only items listed on this form will be considered.
List every item individually...
(a) Chelbrooke Homes Pty Ltd v Queensland Building and Construction Commission[38] was a case in which the Commission included matters in its direction which had not been the subject of any complaint by the homeowners where rectification could have caused other issues for the homeowners;
(b) Hall v Queensland Building and Construction Commission[39] was an application in which the Commission's argument, that the Direction to Rectify necessarily defined the scope of the tribunal's power to review the Scope of Works issued after the contractor had failed to rectify the work as directed, was rejected;
(c) Interlink Developments Pty Ltd v Queensland Building and Construction Commission[40] deals with how the tribunal should deal with an application to review directions to rectify in circumstances in which those defects had been rectified after the period for rectification had elapsed.
Cracks on walls/ceilings in the main bedroom and windows above French doors do not open (Item 1)
Cracks and gaps in the walk-in robe walls and ceiling (Item 3 and Item 20)
Incomplete paintwork outside the kitchen window (Item 7)
Gap fill cracks in all rooms around the house (Item 8)
Gap fill VJ walls and ceiling junction in the laundry (Item 10)
Paint finish to the top architraves on the door surrounds in the entry hallway (Item 11)
Gaps and cracks on the walls in the walkway (Item 11)
Paintwork on the front door (Item 11? Item 17?)
Paintwork on the doorway to the main bedroom (Item 1? Item 11?)
Paintwork on the walls and ceiling of the basement (Item 12)
Paintwork on the hardwood bearers in the basement (Item 12)
Windows above the French doors painted shut (Item 16)
Paintwork on the top of the skirting boards of the entire internal house (Item 17?)
Paintwork on the VJ sheeting in the patio downstairs (Item 7? Item 17?)
Achieving a balance between the interests of the consumer and the painter
(a) on the front door;
(b) on the window above the French door in the linen cupboard/ walkway;
(c) above the entry door;
(d) on the walls in the walkway;
(e) on the door of the main bedroom;
(f) on the front stairs; and
(g) on the underside of the floor above and the walls in the basement.
[7] Queensland Civil and Administrative Tribunal Act 2009 (Qld) (QCAT Act) s 24.
[31] Shilleto v Queensland Building and Construction Commission [2024] QCAT 137, [18].
[53] Rosecove v Queensland Building and Construction Commission [2023] QCAT 101.
Keep
Queensland Building and Construction Commission [2025] QCAT 209