[2025] FWC 1478
General information, not legal advice.
Fair Work Commission
2025-05-29
Lee J
Original judgment source is linked above.
s.394 - Application for unfair dismissal remedy
Application for relief from unfair dismissal - electrician shut down generators on power project - valid reason for dismissal - dismissal not harsh, unjust or unreasonable - application dismissed
(a) Mr McCabe's application for unfair dismissal was made within the period required by s 394(2) of the Act;
(b) Mr McCabe was a person protected from unfair dismissal;
(c) the Small Business Fair Dismissal Code did not apply to Mr McCabe's dismissal; and
(d) Mr McCabe's dismissal was not a genuine redundancy.
Was the dismissal harsh, unjust or unreasonable?
"Fact Finding and the State of Satisfaction Required
The mandatory considerations which s 140(2) specifies reflect a legislative intention that a court must be mindful of the forensic context in forming an opinion as to its satisfaction about matters in evidence. Ordinarily, the more serious the consequences of what is contested in the litigation, the more a court will have regard to the strength and weakness of evidence before it in coming to a conclusion.
Even though he spoke of the common law position, Dixon J's classic discussion in _Briginshaw..._at 361-363 of how the civil standard of proof operates appositely expresses the considerations which s 140(2) of the [EA] now requires a court to take into account. Dixon J emphasised that when the law requires proof of any fact, the tribunal must feel an actual persuasion of its occurrence or existence before it can be found. He pointed out that a mere mechanical comparison of probabilities independent of any belief in its reality, cannot justify the finding of a fact. But he recognised that (Briginshaw 60 CLR at 361-262):
'No doubt an opinion that a state of facts exists may be held according to indefinite gradations of certainty; and this has led to attempts to define exactly the certainty required by the law for various purposes. Fortunately, however, at common law no third standard of persuasion was definitely developed. Except upon criminal issues to be proved by the prosecution, it is enough that the affirmative of an allegation is made out to the reasonable satisfaction of the tribunal. But reasonable satisfaction is not a state of mind that is attained or established independently of the nature and consequence of the fact or facts to be proved. The seriousness of an allegation made, the inherent unlikelihood of an occurrence of a given description, or the gravity of the consequences flowing from a particular finding are considerations which must affect the answer to the question whether the issue has been proved to the reasonable satisfaction of the tribunal. In such matters "reasonable satisfaction" should not be produced by inexact proofs, indefinite testimony, or indirect inferences...
Dixon J also pointed out that the standard of persuasion, whether one is applying the relevant standard of proof on the balance of probabilities or beyond reasonable doubt, is always whether the affirmative of the allegation has been made out to the reasonable satisfaction of the tribunal. He said that the nature of the issue necessarily affected the process by which reasonable satisfaction was attained. And, so, he concluded that in a civil proceeding, when a question arose whether a crime had been committed, the standard of persuasion was the same as upon other civil issues. But he added, weight must be given to the presumption of innocence and exactness of proof must be expected (Briginshaw 60 CLR at 362-363).
(a) despite Mr McCabe asserting that there was a breach of section 163 of the Work Health and Safety Regulation 2017 (NSW) (Alleged Safety Breach) and issuing a Provisional Improvement Notice1408 dated 27 June 2024, there was no objectively reasonable basis for Mr McCabe to believe that the Alleged Safety Breach gave rise to an immediate risk to health and safety;
(b) in the circumstances of subparagraph (a), Mr McCabe:
(i) deliberately and knowingly shut down the generators powering the main compound when he was not approved or directed to do so; and
(ii) refused to follow lawful and reasonable directions given by Mr Stenson, not to shut down the generators;
(c) this was a dangerous act that could have led to serious injury to Mr McCabe or other employees, or members of the public or damage to property and assets;
(d) these actions constituted a serious breach of Mr McCabe's contract of employment dated 8 June 2023 and UGL's Workplace Behaviour Policy;
(e) a thorough and fair investigation and disciplinary process was undertaken by UGL; and
(f) Mr McCabe has shown no remorse or acceptance of responsibility for his actions.
"... Workers and others are exposed to a risk of health and safety from an electric shock as UGL Engineering Pty Ltd has failed to ensure that ongoing earth continuity testing has been conducted on the sync board that is fed from Generator 1, 2, 3 in compliance with AS/NZS 3012.
1. You must ensure that earth continuity testing has been completed in accordance with AS/NZS 3012, specifically, Section 3.6, on all electrical construction wiring and plant.
2. You must ensure, so far as is reasonably practicable, to consult with workers who carry out work for the business or undertaking who are, or are likely to be, directly affected by complying with Direction 1.
Your attention is drawn to clause 163 of the WHS Regulation 2017 and Section 46, 47 of the WHS Act 2011. In complying with the direction refer to: SafeWork NSW Code of Practice 'Managing electrical risks at the workplace', and AS/NZS 3012 - Construction and demolition sites.
This contravention must be remedied before: 26/03/2024..."
...you are contravening a provision ... of the... Work Health and Safety Regulation 2017, regulation 147 & 163.
BRIEF DESCRIPTION OF HOW THE PROVISION IS BEING OR HAS BEEN CONTRAVED
...you are contravening a provision ... of the... Work Health and Safety Regulation 2017, regulation 163.
BRIEF DESCRIPTION OF HOW THE PROVISION IS BEING OR HAS BEEN CONTRAVED
PCBU has failed to ensure that mandatory testing of main earth continuity for main compound and stores installation has occurred prior to energisation as outlined in AS 3012 Section 3 and AS 3000 Section 8.
...you are contravening a provision ... of the... Work Health and Safety Regulation 2017, regulation 163.
BRIEF DESCRIPTION OF HOW THE PROVISION IS BEING OR HAS BEEN CONTRAVED
PCBU has failed to ensure that mandatory testing of main earth continuity for main compound and stores installation prior to energisation as outlined in AS 3012 Section 3 and AS 3000 Section 8.
"The company believes the installation to be safe."
"... I think Mr Bamford suggested that they were going to turn off the generators because they hadn't got testing. I suggested that wasn't a good idea. I asked Justin not to turn off the generator..."
"...asked them not to turn off the generator. He questioned whether he was doing things for the right reasons or his motives around why he was turning them off. Yeah, it was pretty much along the same lines as what - as what I had said to him as well."
"If no test results can be produced then the installation is deemed to be non-compliant, unsafe, and posing an imminent risk to health and safety for anyone utilising the area that this installation is powering."
"Have you informed the workforce this will need to be shut down?"
"No, I haven't because you're not shutting it down."[40]
"If any computers needed to be isolated or made safe now is the time to do so."
"What do you mean? What electrical qualifications do you hold to be making an assessment on electrical safety? He is a licensed electrician and a fully trained electrical HSR. He has an obligation not only as an electrician licence holder but also as an electrical HSR to not leave unsafe electrical installations in service."
generator 2 was the generator that was running. Mr Bamford said to Mr McCabe that based on his knowledge of the installation and given no access to switchboards was being provided, the only option available was upstream, meaning that the generators were the isolation point. Mr Bamford said that the changeover switch was automatic so all three generators would need to be isolated or subsequent generators would start up automatically. Mr Bamford said that, given that generator 2 was running, both generators 1 and 3 would need to be isolated first before generator 2.
"Hang on, you have had every opportunity to provide evidence that this has been done. You haven't, because it hasn't been done. It is unsafe and the HSR has made a call as a licenced electrician based on that information."
"30. Despite me issuing the PIN, I was not shown any results. I kept asking for them. At 10:50 am, I issued another PIN in the same terms. This time, I issued it to Niall Stenson. A copy of that PIN is annexed and marked JM-6.
31. Around this time, I also noticed that there was no galvanising paint on the main earth electrode. According to the regulations, you have to have galvanising paint on it to
protect from the weather. That Main/Earth connection has to be under 0.5 Ω, and it was
shown to be under that on the testing sheet. Assuming there was a Main/Earth
connection, a result of 0.5Ω is very unlikely and almost impossible in circumstances
where there was no galvanising paint on the electrode. The reason is that the electrode
would have been out in the weather for at least 2 years and several recent severe weather
events. The earth stake is not copper. It's only a steel rod. Without the galvanising paint
and in circumstances where it had been exposed to the elements for 2 years, the tests
would have almost certainly returned a result greater than 0.5Ω. This is unless there
was no Main Earth to Neutral connection at all, which is what I was strongly suspecting
32. In response to my requests for the production of the tests, Niall just kept saying that he
didn't have to and wasn't going to. Later, UGL produced some CCEWs (which are
compliance certificates). But at this point, he didn't mention anything about the
CCEWs. His only response was that he doesn't have to produce the tests. He also told
33. Around this time, I also asked Lindsay Olssen if he could open up the main box so I
could at least do a visual inspection to confirm that there was a main earth neutral
34. As a result of all this, I formed a view that there was either not a main earth neutral
connection, or if there was it was seriously compromised. I formed this view based on
a. UGL had not provided the mandatory testing of the earth continuity despite
b. The test sheets UGL provided (which only showed the connection upstream to
the distribution board) showed serious discrepancies and was consistent with
c. The fact that there was no galvanising paint made it more likely that the results
on the test sheet were what they were because there was no MEN and not
because there had been a disconnection at the source; and
d. UGL was stopping me from conducting a visual inspection that would have
35. When UGL wouldn't give me the access to the main box to do a visual inspection, I
36. After I was refused access to conduct the visual, I said I would need to shut down the
generators so that testing could occur. You cannot do earth continuity tests on a live
generator. At this point I considered there to be an imminent risk because it appeared
that there was either no main earth neutral or the continuity was not good. If there was
no testing on the earth continuity, then you wouldn't know whether the other upstream
tests were reliable. For a person with a bad heart, it only takes a few milliamps to kill
them. The only way to remove such an unsafe situation is to shut down the generator
37. I then went to shut down the generator and put a tag on it."
"9. GRIEVANCE PROCEDURE - OPERATIONAL HEALTH & SAFETY
9.1 The parties to this Agreement agree to do all things practicable to maintain the site
9.2 If a safety problem has been identified in a particular work area, an Employee
elected OHS representative or OHS Committee representative will inspect the
area with management representatives and they will determine the appropriate
action to be taken and report back to the Employees concerned.
9.3 Work shall cease only in areas immediately affected by a reasonable concern and
9.4 Work in other areas shall continue without interruption, and all Employees shall
remain available on site to carry out work in areas not immediately affected and/or
to carry out rectification works. Priority will be given to safety rectification.
9.5 No Employee will be required to work in any unsafe area or situation, as
determined by the work area OHS representative or OHS Committee
9.6 Work may continue where an appropriate level of additional PPE is used to counter
any risk to safety, therefore making it safe to work.
9.7 Should a safety dispute arise over whether one or more work areas are safe or
not, the Company and the Employees agree the following procedure shall apply:
9.7.1 When an Employee becomes aware of an unsafe situation, the Employee
must rectify the situation, if it is within their competence to do so.
9.7.2 Where the situation cannot be rectified, immediate inspection of the affected
areas will be carried out by site safety management and the work area OHS
9.7.3 As safety rectification work is agreed for each area, all Employees shall
9.7.4 Upon agreement that such rectification has been completed, normal work
9.7.5 Employees shall not leave the project site unless directed to do so;
9.7.6 Should any dispute arise as to the rectification, or failure to rectify the work
required to any area, or in determining whether work can continue safely
taking into consideration any revised safety arrangements or addition PPE
requirements introduced to counteract a safety concern, the safety
committee chairperson, Client representative or the Company may call
upon WorkCover NSW to assist. Where WorkCover NSW is called in, the
parties agree to be bound by that determination. Further, the parties shall
abide by the Building Code 2016, or if it is replaced, any successor Code,
the New South Wales Code of Practice for Procurement, the
Implementation Guidelines to the New South Wales Code of Practice for Procurement: Building and Construction, or other legislative obligation, in regards to settling safety disputes."
"Mr McCabe, you said there was no testing from the DB2 back to the main compound?---Yes.
You don't know whether there was testing done or not. You just hadn't seen any test results, is that right?---That is correct and we were asking for them and we were refused."
"It was around this time that Justin and I began to discuss with various UGL management (including Brad) and AiG representatives to the effect that if these results could not be produced, and had in fact not occurred, that the installation would need to be isolated..." [emphasis added]
"... You asked for test results but you did not know whether or not the tests had been done?--- Correct."
"This Standard sets out requirements for the design, construction and verification of electrical installations, including the selection and installation of electrical equipment forming part of such electrical installations.
These installations are intended to protect persons, livestock, and property from electric shock, fire and physical injury hazards that may arise from an electrical installation that is used with reasonable care and with due regard to the intended purpose of the electrical installation..."
Earthing conductors, and any associated fixing devices, shall be protected from corrosion, including the effects of moisture or contact with dissimilar metals.
Earthing conductors and associated fittings and fixing devices shall comply with the following requirements:
(a) Underground and damp situations All joints and terminations installed in an underground location or other damp situation shall be sealed to prevent the entry of moisture. All associated fittings and fixing devices in such locations shall be constructed of, or protected by, corrosion resistant material.
(b) Exposed to the weather All joints, terminations, fittings and fixtures in locations exposed to the weather shall be constructed of, or protected by, corrosion-resistant material in such a manner that will prevent the entry of moisture affecting the conductor."
"Electrical installations on construction and demolition sites shall be carried out in accordance with AS/NZS 3000, except as modified herein, and with the applicable additional requirements of this Standard.
This Standard shall be read and used in conjunction with the requirements of relevant legislation."
This Section describes the verification (i.e. assessment, inspection and testing) procedures and frequency to be followed on all components of the electrical installations of construction and demolition sites. It applies to -
(e) the connection between generator windings and the equipotential bonding system on
(f) the connection between the frame and the equipotential bonding system of an isolated winding generator;
(h) any other electrical equipment used on construction and demolition sites."
"3.7 ACTIONS RESULTING FROM INSPECTION AND TEST
Where a visual inspection identifies damage or non-compliance with this Standard, that part of the installation shall be isolated, repaired or replaced and tested as required.
Where inspection or testing identifies equipment that fails to comply with the criteria given in this Standard, the equipment shall be -
(a) withdrawn from service immediately, have an out-of-service tag attached to it warning against further use; and
(b) sent for repair, disposal or destruction by an authorized repair agent or service personnel.
New equipment, after inspection and tests, shall be fitted with a durable, non-reusable, non-metallic tag. Construction wiring, switchboards, fixed RCDs, fixed and transportable electrical equipment need not be tagged.
Following periodic verification, compliant equipment shall be re-tagged. The items covered in Clause 3.3.2 need not be tagged.
The tag, which may be colour coded to identify the period in which the test was performed, shall include the -
(a) name of the person who performed the tests; and
NOTE: Appendix D gives a recommended colour coding schedule for tags on compliant equipment."
Notification of reason (s 387(b))
Opportunity to respond (s 387(c))
Unreasonable refusal to allow a support person (s 387(d))
Warnings of unsatisfactory performance (s 387(e))
Size of enterprise and absence of human resource specialists or expertise (s 387(f) and (g))
"[41] Nevertheless, it remains a bedrock principle in unfair dismissal jurisprudence of the Commission that a dismissal may be "harsh, unjust or unreasonable" notwithstanding the existence of a "valid reason" for the dismissal": Australian Meat Holdings Pty Ltd v McLauchlan (1998) 84 IR 1; J Boag & Son Brewing Pty Ltd v John Button [2010] FWAFB 4022; Windsor Smith v Liu [1998] Print Q3462; Caspanello v Telstra Corporation Limited [2002] AIRC 1171; King v Freshmore (Vic) Pty Ltd [2000] Print S4213; Dahlstrom v Wagstaff Cranbourne Pty Ltd [2000] Print T1001; Erskine v Chalmers Industries Pty Ltd [2001] PR902746 citing Allied Express Transport Pty Ltd (1998) 81 IR 410 at 413; Qantas Airways Limited v Cornwall (1998) 82 IR 102 at 109; ALH Group Pty Ltd T/A the Royal Exchange Hotel v Mulhall [2002] PR919205. That principle reflects the approach of the High Court in Victoria v Commonwealth and is a consequence of the reality that in any given case there may be "relevant matters" that do not bear upon whether there was a "valid reason" for the dismissal but do bear upon whether the dismissal was "harsh, unjust or unreasonable".
[42] Broadly speaking, circumstances bearing upon whether a dismissal for misconduct is harsh, unjust or unreasonable fall into three broad categories:
(1) The acts or omissions that constitute the alleged misconduct on which the employer relied (together with the employee's disciplinary history and any warnings, if relied upon by the employer at the time of dismissal) but otherwise considered in isolation from the broader context in which those acts or omissions occurred.
(2) The broader context in the workplace in which those acts or omissions occurred. [This may include such matters as a history of toleration or condonation of the misconduct by the employer or inconsistent treatment of other employees guilty of the same misconduct.]
(3) The personal or private circumstances of the employee that bear upon the substantive fairness of the dismissal. [This includes, matters such as length of service, the absence of any disciplinary history and the harshness of the consequences of dismissal for the employee and her or her dependents.]
[43] The determination of whether there was a "valid reason" proceeds by reference to the matters in category (1) and occurs before there is a consideration of what Northrop J described as "substantive fairness" from the perspective of the employee. Matters in categories (2) and (3) are then properly brought to account in the overall consideration of the whether the dismissal was "harsh, unjust or unreasonable" notwithstanding the existence of a "valid reason".
[47] In Bostik (Australia) Pty Ltd v Gorgevski (No 1) (1992) 41 IR 452 Sheppard and Heerey JJ observed (at p 460):
"Employers can promulgate polices and give directions to employees as they see fit, but they cannot exclude the possibility that instant dismissal of an individual employee for non-compliance may, in the particular circumstances of an individual case, be harsh, unjust and unreasonable."
[48] Thus, a finding that an employee has failed to comply with policies and procedures does not mean that a dismissal is not harsh, unjust or unreasonable. The Commission has consistently applied the proposition that instant dismissal of an employee for non-compliance with her or her employer's policies may, in the particular circumstances of an individual case, be harsh, unjust and unreasonable: Kangan Batman TAFE v Hart [2005] PR958003, Ross VP, Kaufman SDP and Foggo C at para [51]; Fearnley v Tenix Defence Systems Pty Ltd [2000] Print S6238, Ross VP, Polites SDP and Smith C (Fearnley) at [61]); Atfield v Jupiters Ltd (2003) 124 IR 217 (Jupiters) at [12]-[13]."
"[33] The relevance of the definition of "serious misconduct" in reg.1.07 to the matter is also, with respect, obscure. Section 12 of the Act contains a definition of "serious misconduct" for the purposes of the Act which simply cross-refers to reg.1.07. Apart from s.12 itself, the expression "serious misconduct" is used in only three places in the Act. In s.123(1)(b), a dismissal for serious misconduct is a circumstance in which the notice and redundancy entitlement provisions of Pt 2-2 Div 11 are not applicable; in s.534(1)(b) a dismissal for serious misconduct is one to which the requirements for notification and consultation in Pt 3-6 Div 2 do not apply; and in s.789(1)(b) a dismissal for serious misconduct is one in relation to which the requirements established by Pt 6-4 Div 3 for notification and consultation do not apply. The expression "serious misconduct" is not used anywhere in Pt 3-2, Unfair Dismissal, of the Act. Section 392(3) requires the Commission, in relation to the award of compensation for an unfair dismissal, to reduce the amount that it would otherwise order by an appropriate amount where it is "satisfied that the misconduct of a person contributed to the employer's decision to dismiss the person". However, it is clear that conduct may constitute "misconduct" for the purpose of s.392(3) without necessarily being "serious misconduct". The expression is used in the Small Business Fair Dismissal Code, but that had no application in this case (and it is at least highly doubtful in any event whether the reg.1.07 definition applies to the Small Business Fair Dismissal Code). Reg.1.07 therefore had no work to do in the application of the provisions of Pt 3-2 to the circumstances of this case.
[34] It may be accepted that an assessment of the degree of seriousness of misconduct which has been found to constitute a valid reason for dismissal for the purposes of s.387(a) is a relevant matter to be taken into account under s.387(h). In that context, a conclusion that the misconduct was of such a nature as to have justified summary dismissal may also be relevant. Even so, it is unclear that this requires a consideration of whether an employee's conduct met a postulated standard of "serious misconduct". In Rankin v Marine Power International Pty Ltd Gillard J stated that "There is no rule of law that defines the degree of misconduct which would justify dismissal without notice" and identified the touchstone as being whether the conduct was of such a grave nature as to be repugnant to the employment relationship. "Serious misconduct" is sometimes used as a rubric for conduct of this nature, but to adopt it as a fixed standard for the consideration of misconduct for the purpose of s.387(h) may be confusing or misleading because the expression, and other expressions of a similar nature, have been considered and applied in a variety of contexts in ways which are influenced by those contexts. In McDonald v Parnell Laboratories (Aust) Pty Ltd Buchanan J said:
"[48] The terms 'misconduct', 'serious misconduct' and 'serious and wilful misconduct' are often the subject of judicial and administrative attention as applied to the facts of particular cases but there is relatively little judicial discussion about their content and meaning. Naturally enough, when the term 'serious misconduct' is under consideration an evaluation of what conduct represents 'serious' misconduct is influenced by the (usually statutory) setting in which the phrase must be given meaning and applied. Frequently, for example, the question at issue is whether an employee is disentitled by reason of his or her conduct to a statutory entitlement (eg. in New South Wales, where Ms McDonald was employed, see Long Service Leave Act 1955 (NSW) s 4(2)(a)(iii); Workers Compensation Act 1987 (NSW) s 14(2)."
[35] In the Decision, the Vice President, correctly, did not attempt to address the parties' submission concerning "serious misconduct" in the context of his consideration of whether there was a valid reason for the dismissal, but only as a relevant matter under s.387(h). His findings at paragraph [55] and [56] that Mr Sharp's conduct was "serious misconduct" was, we consider, responsive to the submission of BCS noted in the first sentence of paragraph [52] that "the Applicant's conduct constituted serious misconduct justifying immediate dismissal". That is, "serious misconduct" was used as a shorthand expression to described misconduct of a nature that justified summary dismissal. A finding of that nature was a matter which was open to be taken into account as relevant under s.387(h) because it involved an assessment of the seriousness of the conduct in question."
(b) The HPP site emergency evacuation protocols are powered by generators powering the main compound (including the main office complex) and Mr McCabe's conduct in turning off the generators resulted in an inability for the HPP site to properly enable emergency evacuation communication protocols across the site, including sirens, radios and PA systems.
[1] Shepherd v Felt & Textiles of Australia Ltd (1931) 45 CLR 359 at 373, 377-8
[2] Selvachandran v Peterson Plastics Pty Ltd [1995] IRCA 333; (1995) 62 IR 371 at 373
[4] Walton v Mermaid Dry Cleaners Pty Ltd [1996] IRCA 267; (1996) 142 ALR 681 at 685
[6] King v Freshmore (Vic) Pty Ltd (unreported, AIRCFB, Ross VP, Williams SDP, Hingley C, 17 March 2000) Print S4213 [24]
[9] Sodeman v The King [1936] HCA 75; (1936) 55 CLR 192 at 216 per Dixon J
[24] Hearing Book at pp 280[104], 1293[6], 1294[18] & 1310[9]; Ex A8 at [6]
[27] Hearing Book at pp 145[32] & 1294-1295[17]-[19]; Ex A8 at [5]; Ex A9 at [10]
[28] Transcript at PN1050-PN1056 & PN1178-PN1184
[31] Ex A9 - Mr Bamford does not respond to PN1294 where Mr Stenson gave this evidence. Compare Ex A8 at [5] where Mr McCabe denies Mr Stenson's account of the conversation.
[40] See also Hearing Book at p 1292 [4], PN421 & PN427-PN431
[41] Hearing Book at p 1125[11]-[15]
[42] Hearing Book at pp 1292[3] & 1315[43]-[46]
[45] Transcript at PN928 & PN1407-PN1408
[47] Hearing Book at pp 143-4 [23]-[27]
[49] Applicant's written submissions dated 12 February 2025 at [20] & [26(a)] and Applicant's written submissions in reply dated 14 March 2025 at [2(a)], [3(a)], [7] & [16(a)]; see also PN134 and PN301
[57] See, for example, sections 1.4.31, 1.4.32, 1.4.49, 1.4.50, 1.4.81 and 5 of AS3000
[58] See, for example, sections 2.6.2, 2.6.5, 3.5.2 of AS3012
[60] Ex A3 - AS3012 at clause 3.9 (page 39)
[62] Hearing Book at pp 1292[4] & 1315[45]
[64] CFMMEU v Mt Arthur Coal Pty Ltd [2021] FWCFB 6051
[65] Hearing Book at pp 1146 and 1149-1166
[67] Johnson v Northwest Supermarkets Pty Ltd [2017] FWCFB 4453 at [5]; Sharp v BCS Infrastructure Support Pty Ltd [2015] FWCFB 1033 at [34]
[69] Hearing Book at p 1127[25]; PN388-PN391; PN705-PN710; PN1420
[70] Hearing Book at pp 146-147 [39]-[42]
[71] Hearing Book at p 1127[27]-[30]
Printed by authority of the Commonwealth Government Printer
Justin McCabe
UGL Engineering Pty Ltd [2025] FWC 1478
(1998) 84 IR 1
(1998) 81 IR 410
(1998) 82 IR 102
(1992) 41 IR 452
(2003) 124 IR 217
(1931) 45 CLR 359
(1995) 62 IR 371
(1996) 142 ALR 681
(1936) 55 CLR 192