[2025] VCAT 949
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-11-05
Original judgment source is linked above.
Ensure that modern telecommunications facilities are widely accessible and that the telecommunications needs of business, domestic, entertainment and community services are met.
Encourage the continued deployment of telecommunications facilities that are easily accessible by:
Co-locate telecommunications facilities wherever practical.
Planning should have regard to national implications of a telecommunications network and the need for consistency in infrastructure design and placement.
When the word "need" is used in a town planning sense, it must mean community need. It is not necessary to show an element of urgent community necessity for a facility. Rather need connotes the idea that the well being of a community or some part of it can be better and more conveniently served by the provision of a particular facility. ......
Planning application information about the community need

Council's screenshot of Optus website showing 4G mobile coverage on Phillip Island
Indara submission and evidence to VCAT about the community need

Information provided about one frequency - 1800mHz is acceptable
The construction of a 37.5 metre high monopole telecommunications facility with new access to Back Beach Road and associated equipment cabinet, fencing and landscaping.
Construct a building within 5 metres of a property boundary in Farming Zone Schedule 1
Construct or carry out works for a telecommunications facility
Create or alter access to a road in a Transport Zone 2
(a) The access on the site dimensioned and connecting with the crossover requirements of the Head, Transport for Victoria as set out in the conditions of this permit.
(b) A landscape plan in accordance with Condition 3 of this permit.
(c) Dimensions of the equipment cabinet (2.772m by 0.85m in area and height above ground to be nominated) and the monopole (base diameter of 1.185m and top diameter of 0.66m) and a notation that the 0.6m microwave at EL15.0m is on a mounting pipe extending 0.4m from the monopole.
All to the satisfaction of the responsible authority. When approved, the plans will be endorsed and will then form part of this Permit.
(a) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant;
(b) Revised accessway location that accords with the crossing and accessway location required by the conditions of Head, Transport for Victoria;
(c) Any further fencing required to protect the landscaping from the continued grazing on the balance of the land;
(d) A mixture of lower, middle and upper storey vegetation to provide an effective visual screen within the planting area.
(a) Intersection Sight Distance achievable
(b) Length and width of shoulder seal
(c) Location of drainage pipe with driveable end walls (if applicable)
(d) Location of any gates controlling access to property
(a) The development does not start within 2 years from the date of this Permit; or
(b) The development is not completed within 4 years of the date of this Permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition
[2] Page 3 of Planning and Environment Act 1987 (Vic).
[4] The submissions and evidence of the parties, the supporting exhibits given at the hearing and the material on the Tribunal's electronic file have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[5] Clause 19.03-4L of the planning scheme.
[6] Telstra Corporation Limited v Knox CC [2024] VCAT 74 at [111].
Indara Corporation Pty Ltd
Bass Coast SC [2025] VCAT 949