[2010] VCAT 661
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2010-06-09
Original judgment source is linked above.
Optus Mobile Pty Ltd v Ballarat CC [2010] VCAT 661
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
Mr David Hughes, town planner of Aurecon, appeared for the applicant company, Optus Mobile Pty Ltd. He presented written and oral submissions.
Ms Lorraine Stupak, consultant town planner of LS Planning Pty Ltd, appeared for the responsible authority. She presented written and oral submissions
Mr Kerry Hutton, principal of Ballarat Christian College, appeared for the College. He presented written and oral submissions.
Mr John Bramley, objector, appeared in person. He made written and oral submissions and also presented a written submission on behalf of Mr Rob Hartigan.
Ms Delwyn Webb, objector, appeared in person and presented written and oral submissions.
Various plans, photographs and other documents were tendered in evidence. The evidence and submissions in documentary form have been retained on the file of the tribunal.
Application under s 77 of the Planning and Environment Act 1987 for review of a decision of the responsible authority to refuse to grant a permit.
Public Use Zone - Service and Utility. Also subject to an Environmental Significant Overlay, Schedule 5 and a Wildfire Significance Overlay under the Ballarat Planning Scheme.
Irregular but almost rectangular area of 8,000m2 surrounded by Farming Zone land but with access off Tinworth Avenue
[1] The subject site is located west of Tinworth Avenue on a parcel used by Central Highlands Water (CHW) for a water storage tank. The land has been gazetted as land for a Water Authority in favour of Central Highlands Water and is leased to Central Highlands Water through the Department of Sustainability and Environment. Optus will be provided with a lease on the portion of land it proposed to use for the Telecommunications facility through both Central Highlands Water and Department of Sustainability and Environment.
[2] The subject land is generally rectangular in shape 70 metres wide and 108 metres deep comprising a total area of approximately 8000 square metres. The development will be contained within the existing water storage complex which is fenced off with cyclone fencing. The proposed location of the tower is adjacent to the existing water tank which is just below the top of the hill. The site is surrounded by existing native vegetation.
[3] The site is surrounded by land owned by the Lihir Goldmine. The goldmine's main operation buildings are located 950 metres to the north of the CHW complex.
[4] Land further to the east and south east has been developed for residential purposes, approximately 130 metres from the site location. Much of this land has been used for pine plantations.
[5] A fire swept through the area in January 2010 which resulted in part of the area being cleared and the underbrush burnt away.
[6] The application seeks approval for the development of a telecommunications tower to assist in its service delivery of the latest mobile technology known as 3G (Third Generation).
[7] The proposal consists of a 40 metre high painted (mist green) concrete monopole with antennas fixed to the top of the pole increasing the overall height to 43.24 metres. A small equipment shelter will be located at the base of the tower.
[8] The amendment of the application has changed the design of the tower from a conspicuous lattice construction to a slimline Monopole with a turret mount...The applicant has agreed to paint the pole mist green to enable it to blend in with the environment and reduce its visual impact on the surrounding area. The site is fully secured with an all weather access track from Tinworth Avenue.
[9] Under the Council's Planning Scheme the use is defined as a Telecommunications Facility being:
Land used to accommodate any part of the infrastructure of a Telecommunications network. It includes any tele-communications line, equipment, apparatus, telecommunications tower, mast, antenna, tunnel, duct, hole, pit, pole, or other structure or thing used, or for use in connection with a Telecommunications network.
[10] Under Section 52.19-2 of the Planning Scheme the proposed structure requires a planning approval as it is not a low-impact facility as described in the Commonwealth Telecommunications (Low-impact) Facilities Determination 1997.
Telecommunications facility Land used to accommodate any part of the infrastructure of a Telecommunications network. It includes any telecommunications line, equipment, apparatus, telecommunications tower, mast, antenna, tunnel, duct, hole, pit, pole, and any other structure or thing used, or for use in or in connection with a Telecommunications network.
To ensure that telecommunications infrastructure and services are provided in an efficient and cost effective manner to meet community needs.
To ensure the application of consistent provisions for telecommunications facilities.
To encourage an effective state wide communications network in a manner consistent with the economic, environmental and social objectives of planning in Victoria as set out in Section 4 of the Planning and Environment Act 1987.
To encourage the provision of telecommunication facilities with minimal impact on the amenity of the area.
Planning decisions should recognise that telecommunications as an essential utility service and, in particular, should:
Planning decisions should reflect the national implications of a telecommunications network and the need for consistency in infrastructure design and placement. A Code of Practice for Telecommunications Facilities in Victoria should be used in the consideration of applications for the use and development of telecommunications facilities and sites.
The Decision Guidelines of Clause 52.19 in relation to Telecommunications Facilities
The facility will operate well within Australian Communications and Media Authority (ACMA) mandated RPANSA Standard for radio frequency emission. A predictive report has been prepared for the site. The predicted highest level of the EME will be at approximately 205 metres from the site. At this point the level will be 0.22% of the Standard. By comparison at 50-100 metres from the site the predicted EME is 0.02% of the Standard. At 100-200 metres from the site the predicted EME is 0.22% of the standard.
Conclusion in relation to the Council's grounds of refusal
Optus Mobile Pty Ltd
Ballarat CC [2010] VCAT 661