[2019] VCAT 2047
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2020-03-27
Original judgment source is linked above.
Mr Stuart Morris QC with Ms Carly Robertson of Counsel instructed by Minter Ellison
Ms Charmaine Dunstan of Traffix prepared an expert witness statement in relation to traffic safety matters but was not called to give evidence.
Application under section 77 of the Planning and Environment Act 1987
Application under section 149 of the Planning and Environment Act 1987
Clause 43.02 - Design and Development Overlay - Schedule 8
Clause 44.05 - Special Building Overlay - Schedule 1
Any sign not listed in Sections 1 or 2 is prohibited pursuant to Section 3 of Clause 52.05-3
The review site is located on the south-west corner of the intersection of Kings Way and Dorcas Street in South Melbourne. It is irregular in shape and is presently developed as a single storey commercial building comprising two tenancies including a Star Mart retail premises for the adjoining service station. An existing sign is located on the roof of the southern part of the building of approximately 84.8 square metres.
The broader area is characterised by a mix of architectural styles and built form but is predominantly a commercial area with some mixed use and residential to the south and east of the review site.
An unaccompanied site inspection was undertaken after the hearing.
Erection of an illuminated panel promotion sign on the roof of the existing building.
IS THE PROPOSAL PROHIBITED UNDER CURRENT PLANNING CONTROLS?
To regulate the development of land for signs and associated structures.
To ensure signs are compatible with the amenity and visual appearance of an area, including the existing or desired future character.
To ensure signs do not contribute to excessive visual clutter or visual disorder.
To ensure that signs do not cause loss of amenity or adversely affect the natural or built environment or the safety, appearance or efficiency of a road.
A sign that was lawfully displayed on the approval date or that was being constructed or put up for display on that date may be displayed or continue to be displayed and may be repaired and maintained.
The content of a lawfully displayed sign may be renewed or replaced. However, a permit is required if:
A sign that is reconstructed must meet the relevant sign requirements.
Animated sign A sign that can move, contains moving or scrolling parts, changes its message, flashes, or has a moving or flashing border.
Electronic sign A sign that can be updated electronically. It includes screens broadcasting still or moving images.
Floodlit sign A sign illuminated by external lighting provided for that purpose.
Internally illuminated sign A sign illuminated by internal lighting or which contains lights or illuminated tubes arranged as an advertisement.
Major promotion sign A sign which is 18 square metres or greater that promotes goods, services, an event or other matter, whether or not provided, undertaken or sold for hire on the land or in the building on which the sign is sited.
Promotion sign A sign of less than 18 square metres that promotes goods, services, an event or any other matter, whether or not provided, undertaken or sold or for hire on the land or in the building on which the sign is sited.
Sign Includes a structure specifically built to support or illuminate a sign.
WHAT ARE THE GENERAL PRINCIPLES RELATING TO 'ACCRUED' RIGHTS?
[62] If a planning permit is amended to introduce a new development control, a permit must be obtained under that control. This does not apply if there is an existing permit for development and the accrued right arising under the permit pursuant to section 28(2) of the Interpretation of Legislation Act 1984 is sufficiently broad to encompass the development for which a permit is now required under the new planning controls, as was the situation in Callea and Brimbank CC v LS Planning Pty Ltd. However, we do not consider the terms of the permit in the present case are sufficiently broad to encompass the permissions now required under the GRZ5 and SLO1. These specific controls are not mentioned in the permit, whereas other specific controls are. We consider that where there is a series of permissions given under named controls, the non-inclusion of permissions under other controls means that no permission for them exists. The permit would need to be amended to give the required permissions. Because they are new permissions, they must comply with the current provisions of the planning scheme. Such amendments could not authorise a development which is prohibited.
In recent years there have been many changes to the Victorian Planning Provisions as part of a Government planning reform program. Some residential zones have been deleted and new residential zones introduced. Changes have been made to other zones. Existing overlays have been amended. Overlays have been applied to land not previously subject to such overlays. Provisions in schemes in a section known as 'Particular provisions' have been amended or introduced. All these changes have sometimes introduced a new permission to develop and/or mandatory or preferred requirements for development.
If the new permission can be characterised as being for the same matter (or forming part of the same matter) as in the permit, the effect of the accrued right under the permit includes the additional permission. For example, if the matter allowed under the permit is 'construction of a building' no additional permission should be needed under any new provision of the scheme that requires permission to construct a building.
It does not matter, in my opinion, that the purpose, objectives or the decision guidelines under the new provisions may be different to those provisions considered when the permit was granted. In my opinion, this is giving effect to the IL Act provision that a right under a permit is not affected by subsequent amendment or repeal of the scheme. The important proviso to this principle is, as stated in the IL Act, unless the amendment or repeal of the scheme includes an express contrary intention.
WHAT CAN BE TAKEN INTO ACCOUNT WHEN INTERPRETING A PLANNING PERMIT?
WHAT WERE THE RELEVANT PLANNING CONTROLS AT THE TIME THE PERMIT WAS GRANTED?
A sign that can move, contains moving parts, changes its message, flashes or has a moving or flashing border.
A sign illuminated by external lighting provided for that purpose.
A sign illuminated by internal lighting or which contains lights or illuminated tubes arranged as an advertisement.
A sign with an advertisement area exceeding 10 square metres.
A sign on land or a building that advertises either:
- Goods or services not provided, produced or sold on the land or in the building.
- An event or competition not conducted on the land or in the building.
An advertisement and any structure built specifically to support it.
Erection of an illuminated panel promotion sign on the roof of the existing building.
(i) the size of the proposed illuminated promotional sign is to be reduced by 10m2.
(ii) the existing "Chapman Motors" sign facing Kingsway is to be removed prior to the erection of the illuminated promotion sign on the roof of the building.
(iii) the overall height of the sign shall not exceed 10 metres above natural ground level.
When approved, the plan(s) shall become the plan(s) endorsed with this permit and shall form part of this permit.
The time within which the development is to be commenced or completed may, on application made before or within the three months after the expiry of the time specified, be extended by the Responsible Authority and where the time is extended after the permit has lapsed the extension shall operate to revive the permit as from the date it expired.
shall be displayed on the site or to attached to the building except with the prior written consent of the Responsible Authority or its Delegate.
IS THE PROPOSAL PROHIBITED OR DOES IT FALL WITHIN AN ACCRUED RIGHT UNDER THE PERMIT?
Whilst technology in relation to advertising signage has changed since the Planning Permit was issued and the form of electronic sign now proposed may not have been in existence at that time. This does not lead to the view that such signage has accrued rights under the Planning Permit.
Light up, give light to, make bright by light, decorate with lights
The act of illuminating with light, the fact or condition or being illuminated with light, a lighting up, a supply of light.
A light-emitting diode (LED) is a semiconductor light source that emits light when current flows through it. Electrons in the semiconductor recombine with electron holes, releasing energy in the form of photons. This effect is called electroluminesce. The color of the light (corresponding to the energy of the photons) is determined by the energy required for electrons to cross the band gap of the semiconductor. White light is obtained by using multiple semiconductors or a layer of light-emitting phosphor on the semiconductor device.
LEDs have many advantages over incandescent light sources, including lower energy consumption, longer lifetime, improved physical robustness, smaller size, and faster switching. LEDs are used in applications as diverse as aviation lighting, automotive headlamps, advertising, general lighting, traffic signals, camera flashes, lighted wallpaper, plant growing light, and medical devices.
In a light emitting diode, the recombination of electrons and electron holes in a semiconductor produces light (be it infrared, visible or UV), a process called "electroluminescence". The wavelength of the light depends on the energy band gap of the semiconductors used. Since these materials have a high index of refraction, design features of the devices such as special optical coatings and die shape are required to efficiently emit light.
With the development of high-efficiency and high-power LEDs, it has become possible to use LEDs in lighting and illumination. To encourage the shift to LED lamps and other high-efficiency lighting in 2008 the US Department of Energy created the L Prize competition. The Philips Lighting North America LED bulb won the first competition on August 3, 2011, after successfully completing 18 months of intensive field, lab, and product testing.
Efficient lighting is needed for sustainable architecture. As of 2011, some LED bulbs provide up to 150 lm/W and even inexpensive low-end models typically exceed 50 lm/W, so that a 6-watt LED could achieve the same results as a standard 40-watt incandescent bulb. Displacing less effective sources such as incandescent lamps and fluorescent lighting reduces electrical energy consumption and its associated emissions.
LEDs are used as street lights and in architectural lighting. The mechanical robustness and long lifetime are used in automotive lighting on cars, motorcycles, and bicycle lights. LED street lights are employed on poles and in parking garages. In 2007, the Italian village of Torraca was the first place to convert its street lighting to LEDs.
An optical phenomenon and electrical phenomenon in which a material emits light in response to the passage of an electric current or to a strong electric field. This is distinct from black body light emission resulting from heat (incandescence), a chemical reaction (chemiluminescence), sound (sonoluminescence), or other mechanical action (mechanoluminescence).
Do the Permit conditions constrain the accrued right(s) under the amendment application is prohibited?
A lawfully displayed advertisement may be renewed or replaced. However, a permit is required:
An advertisement and any structure built specifically to support it.
Includes a structure specifically built to support or illuminate a sign.
Any illuminated sign advertisement should not be be flashing, intermittent or of changing colour.
DO THE ENDORSED PLANS CONTAIN ANY ADDITIONAL RELEVANT INFORMATION?
I can see no reason why, whilst the connotation of the word "gas" will be fixed, its denotation cannot change with changing technologies.
VISUAL AMENITY AND TRAFFIC SAFETY ISSUES RAISED THE CONVERSION OF THE SIGN FROM A STATIC TO LED FORMAT
When approved, the plans shall become the plans endorsed within this permit and shall form part of this permit.
The time within which the development is to be commenced or completed may, on application made before or within three months after the expiry of the time specified, be extended by the Responsible Authority and where the time is extended after the permit has lapsed the extension shall operate to revive the permit as from the date it expired.
shall be displayed on the site or attached to the building except with the prior written consent of the Responsible Authority or its Delegate.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Refer to Jezmac Pty Ltd v Glen Eira CC [2018] VCAT 2053
[5] Jezmac Pty Ltd v Glen Eira CC [2018] VCAT 2053 [17] referring to Alkera Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [44]
[8] Gant v Greater Geelong City Council (2003)15 VPR 230, 233 per Morris J.
[10] Vestey and Ors v Warranmbool CC (red Dot0 [2008] VCAT 963 at 32.
[12] Per Spigelman CV in Repatriation Commission v Vietnam Veterans' Association of Australia NSW Branch Inc [2000] NSWCA 65; (2000) 171 ALR 523, 550, referred to in Vestey and Ors v Warranmbool CC (red Dot0 [2008] VCAT 963 at 42.
[13] Asble Pty Ltd v Stonnington CC [2010] VCAT 1780; Octopus Media Pty Ltd v Yarra CC [2011] VCAT 298; Drive by Developments v Stonnington CC [2017] VCAT 2050; 498 Bridge Road v Yarra City Council [2018] VCAT 2078
[14] 498 Bridge Road Pty Ltd v Yarra CC [2018] VCAT 2078 at [67]
[17] (1970) 123 CLR 327 at page 331.
Ilex Holdings Pty Ltd
Port Phillip CC
(2000) 171 ALR 523
(1970) 123 CLR 327