[2022] VCAT 765
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2022-07-12
Original judgment source is linked above.
a) A site plan showing the existing conditions; > > b) The use of re-claimed timber façade cladding along the western elevation of Storage B to a minimum height of RL. 9.75; > > c) Distance of the upper level setback from the northern title boundary for Storage A; > > d) Entrance/exit gates shown on the western elevation; > > e) Specifications of the fuel tank including dimensions, capacity and material; > > f) Dimension of separation between Storage Sheds A and C; > > g) A west elevation for Storage Sheds A and B at a scale of 1:50; > > h) The width of the front canopies of Storage Sheds A and B;
j) All proposed fencing, including dimensions and materials; > > k) Changes to the relevant parking spaces including motor cycle spaces as shown on plan prepared by Cardno, Drawing No. VI90106-TR-SK-0004, Revision 3 and dated 25 November 2021;
m) The public pedestrian path; and > > n) Fencing in accordance with conditions 4 to 6.
(a) contain a retractable gate to allow for the boat launching and retrieval operations, to the satisfaction of the responsible authority; and
(b) contain a retractable barrier:
- that runs perpendicular to the fencing and is located adjacent to Storage Shed D, which prevents pedestrian access to the north while boat launching and/or retrieval operations are occurring; and
- operates simultaneously with the operation of the retractable gate,
all to the satisfaction of the responsible authority.
a) delivery of boats for storage, and removal boats from storage, on the site; > > b) delivery of fuel and waste collection; > > c) launching and retrieval of boats; and > > d) operation of the retractable fence at the eastern end of the site during boat launching and retrieval operations.
a) Transport of boats, materials, goods or commodities to or from the land; > > b) Appearance of any building, works or materials; > > c) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil; and > > d) Presence of vermin,
Department of Environment, Land, Water and Planning (DELWP) - Port Phillip Region
a) 'Proposed Planning Set', drawing no. TP-01 Rev P7 dated 09.06.2021, prepared by Architecture HQ; and > > b) 'Landscape Plan for VCAT', drawing no. TP01 Rev C dated 03/03/2021, prepared by John Patrick Landscape Architects Pty Ltd.
a) Illustrate the location and type of all external materials and finishes on elevations in colour and at an appropriate scale. > > b) Be accompanied by a printed physical samples schedule of all materials and finishes with clear coding linking back to the elevations.
All materials and finishes must be in accordance with the schedule, to the satisfaction of the responsible authority.
a) Any changes required by condition 1 of this permit; > > b) A survey (including botanical names) of all existing vegetation to be retained and/or removed. > > c) Details of all surface finishes including pathways, driveways, patio or decked areas. > > d) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant. > > e) Urban design elements including, but not limited to, paving, lighting, seating and public art. > > f) Clear demarcation of public realm and private spaces, including arrangements for pedestrian, bicycle and vehicular circulation. > > g) How the project responds to water sensitive urban design principles, including how storm water will be mitigated, captured, cleaned and stored for onsite use and the location and type of irrigation systems to be used including the location of any rainwater tanks to be used for irrigation.
a) How the collection of refuse and recycling material will be managed. > > b) What will be the frequency for the removal of such refuse and recycling materials. > > c) How it is intended to control the emission of odour caused by such refuse and recycling material when it is being stored within the site. > > d) Where such refuse and recycling will be stored within the site. > > e) That the bin storage areas are sufficient to cater for the amount of waste that will be produced. > > f) What type of bins will be used on the site. > > g) Where these bins will be stored including details of screening and ventilation. > > h) Who will be responsible for taking bins in and out for collection, and where this will occur.
j) Hours of bin collection not being outside the hours of: > > * 7:00 am to 8:00 pm Monday to Saturday; and > * 9:00 am to 8:00 pm Sunday and public holidays. > > k) Access routes for private waste collection vehicles that do not rely on reversing movements, if private waste collection is utilised.
a) Hours of operation. > > b) Dust management. > > c) Parking and traffic movement of all workers' vehicles and construction vehicles. > > d) Works timetable. > > e) Any impacts upon adjacent roads and pedestrian walkways and providing for adequate movement and circulation of vehicles and pedestrians adjacent to the land during the construction phase. > > f) Access routes for construction vehicles. > > g) Proposed parking locations for construction vehicles and construction workers' vehicles. > > h) Temporary fencing works.
j) Methods of limiting escape of dust and litter from the site. > > k) Graffiti management.
a) a controller/spotter must be available at all times to ensure there is no public safety risk to pedestrians using the foreshore walkway while the use is operating; > > b) measures to manage the risks arising from the operation of the fork lift; > > c) signage and lighting; and > > d) line-marking.
After the public safety management plan is approved, it will be endorsed and form part of this permit.
a) A suitable Tree Protection Zone of 2 metre radius with barrier fence must be established around the street tree/s on the Nelson Place frontage. > > b) The Tree Protection Zone must be enclosed using a 2 metre high temporary cyclone fence or similar, which must remain in place through all stages of the development. This fence must not enclose the footpath which must be kept clear for pedestrian access and a sign must be erected on the fence informing that the fence is a 'Tree Protection Zone'. > > c) The area within the Tree Protection Zone must not be disturbed by any means (including parking of vehicles or storage of plant & equipment, materials, soil or waste).
No excavation is allowed within the Tree Protection Zone except with the prior written consent of the responsible authority and under the supervision of a qualified arborist.
a) Constructed; > > b) Properly formed to such levels that they can be used in accordance with the plans; > > c) Surfaced with an all-weather seal coat; and > > d) Drained and maintained.
a) The development is not commenced within two years of the date of this permit; > > b) The development is not completed within four years of the date of this permit; or > > c) The use is not commenced within four years of the date of this permit.
Pursuant to Section 69 of the Planning and Environment Act 1987, the responsible authority may extend:
a) The commencement date referred to if a request is made in writing before the permit expires or within six months afterwards.
b) The completion date referred to if a request is made in writing within twelve months after the permit expires and the development started lawfully before the permit expired.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing, and the statements of grounds filed; have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Nearmap image dated 17 April 2022 and has the boundary type of 'Property' ticked.
[5] Further submissions on behalf of a Delegate for the Minister for Planning dated 8 November 2021 at [14].
[6] Pursuant to condition 13 of that approval, the consent will expire if the works are not completed within two years of the date of issue, unless extended by the Regional Director, Port Phillip Region, Department of Environment, Land, Water and Planning.
[9] Clause 4.0 of Schedule 4 to the SUZ.
[11] [2019] VCAT 493 at Appendix A, Opinion on Question of Law.
[15] Clauses 13.07-1L, 15.03-1L, 18.02-6L-02 and 19.02-6L of the Scheme.
[17] Department of Environment, Land, Water and Planning, 2020.
[18] Heritage Council of Victoria Victorian Heritage Database, https://vhd.heritagecouncil.vic.gov.au/places/12608 retrieved 26 November 2021.
[19] We observe that the minutes of the Ordinary Council Meeting of the Council held on 25 June 2019 stated that:
Heritage Victoria has advised DELWP [Department of Environment Land Water and Planning] that no Heritage Act consent is required for the buildings and works on the above water area of the site and that no further heritage consent is required for the seawall reclamation area unless excavation of the seabed is proposed.
According to the DELWP officer, no seabed excavation is proposed. The pontoon appears to be a floating structure and the reclamation works to create the new sea wall do not involve excavation but filling of land.
Council's Heritage Adviser raised concerns that there appears to be a lack of assessment of the appropriateness of the proposal having regard to the heritage significance of Knights Slipway. Heritage Victoria is the Responsible Authority in this regard and have raised no concerns with the proposal.
[20] Nearmap image of a Drydock facility in Queenscliff, showing the provision of a public pedestrian path at the water's edge. The image also shows the gates which are used to ensure the public are not in the vicinity of the forklift when in operation (note the boat and forklift accessing the work in the centre of the image). Nearmap image, dated Wednesday 6 October 2021, retrieved 26 November 2021. http://maps.au.nearmap.com/
Hobsons Bay Yacht Club Inc
Minister for Planning [2022] VCAT 765