[2016] VCAT 1445
Victorian Civil and Administrative Tribunal
2016-09-29
Original judgment source is linked above.
Mr Chris Canavan QC and Ms Clare Exell of counsel, instructed by Adam Bisits, solicitor.
Introduce a solid inert waste stream to the existing waste management facility at the subject land.
Application under Section 36D Environment Protection Authority 1970 - application for declarations.
The property at 600 Sunbury Road, Bulla is a large site (260 ha), which has been used for quarrying and landfill for many years. An extractive industry licence in respect of the quarrying activities on the land was first issued in 1969. A landfill licence was issued to the prior landowner in 2001. The applicant currently operates a Type 2 landfill which is licensed to receive prescribed industrial waste (PIW). Other ongoing activities on the land include grazing, quarrying and a large green waste reprocessing facility.
Licence 45279 issued by the respondent (i) allows "prescribed industrial waste (Category C drilling mud, Category C soil and asbestos)" to be deposited at 600 Sunbury Rd, Bulla; (ii) allows recovery of solid inert material recycling and production of road base, aggregates and sand products. The licence is subject to conditions. The licence is under s 20 of the Environment Protection Act 1970.
The applicant's application to amend that licence proposed the insertion of a new waste type, namely solid inert waste, in schedule 2 of the licence as an acceptable waste for disposal into Cell 2 stages 2 and 3. Further the application stated "(n)o new works are required for this waste to be accepted at the site".
At the time of making application was there a matter that may be subject of an application to VCAT?
(1) A person may apply to the Victorian Civil and Administrative Tribunal for a declaration concerning any matter which may be the subject of an application to that Tribunal under this Act.
(2) On an application under subsection (1) the Tribunal may make any declaration it thinks appropriate in the circumstances.
(3) The Tribunal's power to make a declaration under this section is exercisable only by a presidential member of the Tribunal.
[13] The question of jurisdiction therefore hangs on the words in s 36D about a matter which 'may be' the subject of an application to VCAT. Do these words broaden the jurisdiction of VCAT to make a declaration about something that might prospectively become the subject of a future application for review to VCAT under the EP Act? Ileowl contended that the utility of the declaration power in s 36D would be diminished if a reviewable decision needed to exist as an effective pre-condition to the use of s 36D, as an applicant would instead simply undertake that review.
[14] Given what I have said above, I am not convinced that the words 'may be' in s 36D can be read in such broad fashion as Ileowl suggests. I prefer the EPA's contention that s 36D should be read as conferring jurisdiction only concerning a matter that may - at the time the declaration is sought - be the subject of an application to VCAT. That does not however mean that the other application must have already been made. But the circumstances must already reasonably exist for that other application.
[15] The EPA properly conceded that, if an application for a works approval was made and decided (even if refused), it would be open for an applicant to seek a declaration that the works approval had not been required. There would then be a matter that may be the subject of an application for the purposes of s 36D. However, here, there is no decision on a works approval, or even a works approval application.
It must simply be accepted that this is what the EPA has done and this is an end of the matter. The basis for the EPA making a decision to not consider or to refuse to consider applications under either of these provisions can never be challenged.
(1) For the purpose of this Act or an enabling enactment, a person makes a decision if the person -
(a) makes, suspends, revokes or refuses to make a decision, order, determination or assessment (including a decision not to make a decision, order, determination or assessment);
(b) gives, suspends, revokes or refuses to give a certificate, direction, approval, consent or permission;
(c) issues, suspends, revokes or refuses to issue a licence, Authority or other instrument;
(2) For the purposes of this Act or an enabling enactment -
(a) a decision is made under an enactment if it is made in the exercise or purported exercise of a function conferred or imposed by or under that enactment;
(b) a decision that purports to be made under an enactment is deemed to be a decision made under that enactment even if the decision was beyond the power of the decision-maker;
(c) a refusal by a decision-maker to make a decision under an enactment because the decision-maker considers that the decision cannot lawfully be made is deemed to be a decision made under that enactment to refuse to make the decision;
(d) a failure by a decision-maker to make a decision under an enactment within the period specified by that enactment is deemed to be a decision by the decision-maker at the end of that period to refuse to make the decision.
[28] It is important, as the High Court has recently observed [in Hillpalm Pty Ltd v Heaven's Door Pty Ltd [2004] HCA 59], that powers given to specialist courts and tribunals be interpreted amply to give effect to the legislative policy that the specialist court or tribunal address legitimate issues of concern...
(1) The Tribunal has jurisdiction to review decisions of the Authority, delegated agency or a litter Authority with respect to -
(c) abatement notices and notices of amendment under section 28B;
(d) pollution abatement notices and notices of amendment under section 31A;
(e) a direction to a protection agency to submit a proposal to develop a neighbourhood environment improvement plan to the Authority for endorsement;
(fa) requirements made under section 49AF, 49AH or 49AL;
(g) the variation or discharge of a financial assurance under section 67B(7) -
[36] If it transpires that a works approval is required, then it is clear from the provisions of the Act that an amendment of the licence cannot be made. But if, as Statewide contends, no works approval is required because no works are proposed, then the question of whether the licence should be amended will need to be determined on its merits having regard to other relevant matters.
[56] ... Thus, clause 62 is consistent with the general legislative approach of giving the Tribunal the extensive powers which are necessary to enable it to resolve planning issues which arise in the community, and to resolve them according to the merits of the case. Its powers are in many respects wider than the powers of the responsible authorities whose decisions it reviews.
[32] The decision of Emerton J in Harvey v Mutsaers was upheld by the Court of Appeal[16]. In doing so, the Court of Appeal also upheld the decision in Rumpf. It held that clause 62 extends to all forms of failure to comply with statutory requirements, regardless of effect.[17] The Court observed that:
[26] ...although at first it might strike one as odd for Parliament to confer a power of extension on VCAT which the relevant Authority does not have, it is not illogical. VCAT is itself an administrative decision maker but with superadded obligations and capacity to act in the interests of justice.
[33] The effect of the Court of Appeal decision in Harvey v Mutsaers is to put beyond doubt the broad power of the Tribunal to disregard failures to comply with any planning or other enactment and to determine a proceeding if the Tribunal considers it in the interests of justice to do so, notwithstanding that power may exceed what it is open to the relevant Authority to do.
Hi-Quality proposes to accept, in addition to the wastes they are currently licensed for, Solid Inert Wastes (SIW). Hi-Quality in their application make the case that the current standard of the landfill is more than sufficient for these types of wastes and the EPA has now determined that no further construction or modification of the landfill infrastructure is necessary. The current licensed cells would be used to dispose of both prescribed industrial and solid inert wastes.[18]
Was a works approval required at the time of the first decision?
64 There is no definition of "works" in the Act. However, giving a plain English meaning to this term, works require some physical manifestation either in the form of a building, construction of plant, equipment or other structure, or some change to the natural or existing condition or topography of the land.[19] Throughout the provisions of the Act that refer to a works approval, there is an assumption that works in the form of some physical activity, construction or structure are required. For example, see the reference to works in sections 19B(5)(c), 19B(7A), 19CA(2), 19CA(3), 19CA(4), 19D(1)(b), 19E(2), 19F(2), 20A(3)(b), 20A(5), 20A(5A), 20A(5B), 20A(5C), 20A(6).
(1) The occupier of a scheduled premises must not do any act or thing, including the commencement of any construction, installation or modification of plant, equipment or process or any subsequent step in relation thereto, which is likely to cause -
(a) an increase or alteration in the waste discharged or emitted from, deposited to, or produced at, the premises; or
(b) an increase or alteration in the waste which is, or substances which are a danger or potential danger to the quality of the environment or any segment of the environment which are, reprocessed, treated, stored, contained, disposed of or handled, at the premises; or
(c) a change in any method or equipment used at the premises for the reprocessing, treatment, storage, containment, disposal or handling of waste, or of substances which are a danger or potential danger to the quality of the environment or any segment of the environment; or
(d) a significant increase in the emission of noise; or
(e) a state of potential danger to the quality of the environment or any segment of the environment -
except in accordance with a works approval or a licence or a requirement specified in a notice given by the Authority as the case may be unless the act or thing is only in the course of and for the purpose of general maintenance.
Hi-Quality proposes to accept, in addition to the wastes they are currently licensed for, Solid Inert Wastes (SIW). Hi-Quality in their application make the case that the current standard of the landfill is more than sufficient for these types of wastes and the EPA has now determined that no further construction or modification of the landfill infrastructure is necessary. The current licensed cells would be used to dispose of both prescribed industrial and solid inert wastes.[21]
...it is clear that the application is technically sound and the EPA has no objection to the proposal on an environmental or technical basis.[22]
This approval applies to the use of a former quarry for the deposition of low level contaminated soil. It allows for the construction of a new landfill.
1.1 The works must be constructed only onto that piece of land delineated and hatched in the attached "Plan A" in accordance with the Works Approval application accepted on 24/6/97 except that in the event of any inconsistency arising between the application and the conditions of the Works Approval, the conditions of the Works Approval must apply.
... Northern Recycling and Waste Management Pty Ltd have submitted this works approval application to demonstrate the suitability of the site for landfilling with low level contaminated soil, asbestos and solid inert materials. If this application is approved Northern Recycling and Waste Management Pty Ltd will submit a licence application to EPA for the landfilling of low level contaminated soil only. The landfilling of solid inert and asbestos materials would be the subject of separate and future licence applications.[23] [Tribunal emphasis added]
2.1 The licence holder must operate the landfill in accordance with the Environment Improvement Plan dated September 2000 supplied by Egis Consulting Australia annotated as VP8583.001.RevA or the latest version of the Environment Improvement Plan subsequently approved by the EPA.
Wastes considered for disposal at the site in the EPA works approval WA31841 are low level contaminated soil, waste asbestos of industrial and domestic origin and solid inert waste. To ensure compliance with the interim waste management plan of the Northern Regional Waste Management Group, the site will initially accept low level contaminated soil only. However, it is expected that as the closure of the nearby Bulla Tip and Quarry Pty Ltd landfill and other landfills approach, the operator will make an application to EPA for amendment of the site licence to permit the acceptance of asbestos and solid inert materials. At that time this plan will be amended to include provisions for the landfilling of these wastes.
STATE-WIDE WASTE AND RESOURCE RECOVERY INFRASTRUCTURE PLAN
Consistency with State-Wide Waste and Resource Recovery Infrastructure Plan
50C Authority may refuse applications for certain facilities if Plans not observed
(1) The Authority may refuse to consider an application for a works approval or an application for the issue or amendment of a licence in relation to a waste management facility if -
(a) the operations of the facility could be inconsistent with the State-Wide Waste and Resource Recovery Infrastructure Plan or a relevant Regional Waste and Resource Recovery Implementation Plan; or
(b) the applicant is in breach of any relevant requirements of a schedule of existing and required waste and resource recovery infrastructure within a Regional Waste and Resource Recovery Implementation Plan.
(2) Subject to subsection (3), the Authority must refuse to consider an application for a works approval in relation to a new landfill if the landfill is not provided for in the proposed sequence for the filling of available landfill sites in a relevant schedule of existing and required waste and resource recovery infrastructure within a Regional Waste and Resource Recovery Implementation Plan.
Hi-Quality wishes to accept solid inert waste into its landfill site for recycling and disposal. A works approval is sought for this purpose.
Solid inert waste would initially be placed in the current landfill cells where prescribed industrial waste is deposited. Hi-Quality would also seek to minimise the quantity of solid inert waste landfilled by diverting suitable wastes to its recycling and recovery facility [on the same site].[30]
To ensure agree [sic] of waste minimisation, as part of the solid inert landfilling process Hi-Quality intends to establish a resource recovery facility for solid inert waste at the site.
This facility would be identical to Hi-Quality's facility in Sydney, operating under NSW Environment Protection Licences; No. 5186 - Waste disposal (General Solid Waste (non-putrescible)) & No. 12618 - Resource recovery. This operation involves the processing of construction and demolition waste via a state of the art mixed waste processing facility. This highly automated process utilizes various types of material separation equipment sourced from specialist suppliers around the world to achieve recovery rates of around 90 percent. The main products generated through this processing facility are soil, brick and concrete (which is crushed to make aggregate and road base), timber, green waste mulch and steel. Stringent incoming inspection procedures are adopted to ensure all the waste received is suitable for recovery and all waste derived products are tested in accordance with relevant NSW EPA Resource Recovery exemptions and supplied back to customers.[31]
[2] Section 124 of the Victorian Civil and Administrative Tribunal Act 1998 provides as follows:
(3) The Tribunal's power under this section is in addition to, and does not limit, any power of the Tribunal under an enabling enactment to make a declaration.
[5] See the Macquarie Concise Dictionary.
[6] [2004] VCAT 868 at [33].
[7] See also Terminate Tulla v EPA [2007] VCAT 2332.
[8] See Ileowl Pty Ltd v Environment Protection Authority [2015] VCAT 1105
[10] A jurisdictional fact is a set of circumstances set out in a statute that must exist before a government official or authority can act.
[11] For example, in Harvey & Anor v Mutsaers & Ors [2011] VSC 23 at [32] Emerton J was considering a decision of the council to refuse an application for an extension of a permit made out of time by the Mutsaers. She held that the decision was a reviewable decision under the VCAT Act 1998 whether or not the Mutsaers had the right to make the extension application in the first place, because a decision that purports to be made under an enactment is deemed to be a decision made under that enactment even if the decision was beyond the power of the decision maker (section 4(2)(b) of the Victorian Civil and Administrative Tribunal Act 1998). Similarly, a refusal by a decision maker to make a decision under an enactment because the decision maker considers that the decision cannot be lawfully made is deemed to be a decision made under an enactment to refuse to make the decision (section 4(2)(c) of the Victorian Civil and Administrative Tribunal Act 1998). Accordingly, she held that the Tribunal was properly seized of its jurisdiction to review the decision of the council not to extend the permit. There was no question of the Tribunal "conferring jurisdiction on itself". This decision of the Supreme Court was upheld by the Court of Appeal in Harvey & Anor v Mutsaers and Ors [2012] VSCA 69.
[13] [2016] VCAT 1558 at [34]- [35].
[14] Harvey & Anor v Mutsaers & Ors [2011] VSC 23 and Harvey & Anor v Mutsaers & Ors [2012] VSCA 69.
[16] Harvey v Mutsaers [2012] VSCA 69
[18] Works Approval Assessment Report and Reasons for Refusal to Consider Application (11 February 2016) page 3.
[19] See, for example, the definition of works in the Planning and Environment Act 1987, which provides:
"works" includes any change to the natural or existing condition or topography of land including the removal, destruction or lopping of trees and the removal of vegetation or topsoil.
[20] The desire to involve third parties is reflected in the EPA's letter dated 12 February 2015 which says:
As the requested inclusion of solid inert waste is likely to cause an increase or alteration in the waste deposited at the landfill (see section 19A(1) of the Act), the Authority is concerned, in particular, that third parties, including the responsible Authority and any other person or body that may have an interest in the application (such as the Metropolitan Waste and Resource Recovery Group), have an opportunity to comment on the proposal.
[23] Northern Recycling and Waste Management Pty Ltd: Proposed Landfill, Sunbury Road, Bulla; Application for EPA Works Approval (June 1997), page vii.
[24] See pages 1, 5, 26, 27, 29, and 45.
[26] State-Wide Waste and Resource Recovery Infrastructure Plan Figure 1.1. page 17.
[27] As listed at Figure 1.1 of the State-Wide Waste and Resource Recovery Infrastructure Plan.
[28] In the absence of the approval and gazettal of the Metropolitan Waste and Resource Recovery Implementation Plan (which is the relevant RWRRIP and which will set out the relevant infrastructure needs for the metropolitan region), the Authority cannot rule out the potential for the Application to be inconsistent.
[29] The Application states that only approximately 9.8% of solid inert waste may need to be landfilled.
[31] Works approval application page 26
Hi Quality Quarry Products Pty Ltd
Environment Protection Authority
(2000) 2 VR 69