[2011] VCAT 2353
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2011-12-20
Original judgment source is linked above.
Section 79 of the Planning & Environment Act 1987; Port Phillip Planning Scheme; Part demolition of existing dwelling, new two storey addition and two storey garage/studio; Residential 1 Zone; Heritage Overlay; Question of law regarding ambit of discretion; Heritage policy.
Jane & Ian Macdonnell, N & A Camov, Brian Pekin, Gillian Kemp, Steve Gallagher, Anna Tonkin, Carmela & Nicola De Guisa and John Lumb
Hermann v Port Phillip CC & Ors [2011] VCAT 2353
in accordance with the endorsed plans and subject to the conditions contained in Appendix B to these reasons.
He called Mr Peter Lovell, heritage consultant, as a witness
Mr Ian Macdonnell, in person and on behalf of Ms Jane Macdonnell
Demolition of the rear of an existing dwelling, the construction of a two storey addition to the retained dwelling and the construction of a two storey building (garage and studio) at the rear of the land.
Application under Section 79 of the Planning and Environment Act 1987.
Clause 43.01-4: demolish a building and construct a building or construct or carry out works
The land is located on the western side of Canterbury Road, Middle Park. It is between Mills Street (to the north) and Wright Street (to the south). It has a frontage of approximately 10 m and a depth of 50.79 m, yielding a site area of around 508 m2.
The land is developed with a double storey Victorian dwelling of brick and render, with a hipped roof. It has single and double storey rear wings and an ornate tower.
The rear boundary abuts Canterbury Place, a fully constructed small street that is 6.2 m wide.
The land is within an established residential area extending to the west from Canterbury Road. On the opposite side of Canterbury Road there is a rail reserve then the Melbourne Sports and Aquatic Centre and Albert Park. The land to the south (28 Canterbury Road) is developed with a two storey period dwelling with a contemporary extension. To the north the land abuts the side boundary of 26 Canterbury Road and the rear boundaries of 1, 3 & 5 Mills Street.
Partial demolition of existing residence with new extension and renovation works to main house. New garage and studio building to rear of property replacing existing carport.
Would the proposal adversely affect the significance of the heritage place?
'Normanby' is of significance as a substantially intact major Victorian house with distinction particularly in the detailing of its render, joinery and leadlight glazing. The conservatory is a rare example of a once common appendage to buildings of this type and is unusual in its location on the building. The front and side fences are integral to the significance of the house.
It is however the tower that sets this building apart from the norm. It is set on the side, south, face of the house and the door and entrance porch are housed at its base. The door is an intact six panelled door and has very fine leadlight intact to the sidelights and fanlight. Above this is a most unusually placed small conservatory with its original timber framing, while stepping back, the tower rises above. Its typically Italianate decoration includes couple round headed windows and an ornate cornice line decorated with dentils and modillions.
Contemporary architecture and innovative design which is an important part of the contextual approach because it adds to the existing diversity and layering of styles through time. This layering is a defining feature in a number of areas and is therefore an important component of Port Phillip's heritage.
To ensure that new development and any publicly visible additions and/or alterations in or to a heritage place maintains the significance of the heritage place and employ a contextual design approach.[7]
New development should sit comfortably and harmoniously integrate with the site and within the streetscape and not diminish, detract from or compete with the significance of the heritage place or streetscape character.[8]
Maintain an existing vista or viewlines to the principal façade(s) of a heritage place.[9]
An upper storey addition is sited and massed behind the principal façade so that it preferably is not visible, particularly in intact or consistent streetscapes (see Performance Measure 1).[10]
... the contribution of the existing dwelling to the significance of the heritage place relates to its contribution to the Beach Avenue streetscape. It follows from this that the replacement of the rear parts of the building with a new extension is an acceptable approach to the adaptation of the building for modern use. It also follows that arguments in relation to "backyard scape" and "lane scape" are not relevant to my decision.[11]
Require new development to respect the preferred character of an area...
Require new development to respect and not detract from the scale, form and setbacks of nearby heritage places in the Heritage Overlay.
OPINION BY LEGAL MEMBER PURSUANT TO CLAUSE 66(1)(B) OF SCHEDULE 1 OF THE VICTORIAN CIVIL & ADMINISTRATIVE TRIBUNAL ACT 1998**
The Tribunal's ambit of discretion in this application for review, even though the site is in excess of 500 sq. m., is not just confined to heritage considerations but includes the proposal's impact on the amenity of adjoining properties by way of overshadowing, privacy and visual bulk. That is, it includes:
[16] The National Trust case was concerned with circumstances where the relevant planning control was silent as to conservation matters hence rendering the objection irrelevant. In the present case the Act and Scheme specify the matters to be taken into account and the exemptions that are to apply with respect to objections. In this matter the scope of relevant considerations to be applied by the responsible authority and, if needs be, the Tribunal on review, is defined by the Planning and Environment Act and the Scheme.
[29] ... Mr Wren relied upon the well accepted principle that a discretion cannot be exercised for a purpose other than that for which it is granted. There is no doubt as to the underlying validity of the principle.
[33] The plaintiff's case was put by reference to the line of authority which constrains the purposes by reference to which a permit may be refused pursuant to specific provisions of the Planning Scheme despite the broad terms in which general considerations affecting such a decision are stated both in the Act and the Planning Scheme. This principle which has become known as the National Trust principle was recently affirmed with respect to the current format of planning scheme by Morris J in Victorian National Parks Association Inc & Anor v Southern Grampians Shire Council & Ors. Morris J concluded:
"The function of sections 60 and 84B of the Planning and Environment Act is precisely the same as clause 65 of each planning scheme in Victoria and, more significantly, is precisely the same as clause 5A of the Melbourne Metropolitan Planning Scheme at the time of the National Trust case. In my opinion, just as it was proper to have regard to the matters prescribed by clause 5A in the context of a control over the height of buildings, sections 60 and 84B must be applied in a particular application for permit, or a particular application for review, in the context of the discretion then being exercised. But the scope of relevant considerations in the exercise of a discretion under a planning scheme provision is to be ascertained by reference to the purpose for which the discretion has been conferred, not by reference to the broad words of clause 65 or sections 60 or 84B."
[35] The National Trust principle has a valuable role to play in the administration of planning in Victoria. Indeed, current planning schemes, which are based on the Victoria Planning Provisions, are predicated upon the application of the National Trust principle. These schemes contain many provisions which require a permit to be obtained in specific circumstances, which are designed to regulate use or development in those specific circumstances. For example, there are specific controls in relation to the construction of buildings in wildfire areas, in areas prone to erosion, in areas susceptible to flooding and in areas susceptible to land salinity. Similarly there are provisions in relation to the height of buildings, access on to main roads and the removal of native vegetation. Sometimes these specific controls are part of an overlay provision; sometimes they are the result of specific clauses of the scheme. If, upon an application for a permit under one of the specific provisions, the decision maker was required to consider the full panoply of planning considerations set out in sections 60 and 84B of the Planning and Environment Act and in clause 65 of each planning scheme, planning decision making would grind to a standstill.
[14] ... Mr Wright submitted that because the single application was partly to carry out building and works but also partly to carry out demolition and the other matters, the application assumed a characteristic that disqualified it from the benefit of the exemptions. Accordingly, so the argument ran, the application for a planning permit did not answer the description of "an application to construct buildings or to construct or carry out works" (my emphasis) and, therefore, was not exempt from review. If the argument was valid the practical effect on the review before the Tribunal would be that all aspects of the application for the permit would be at large and subject to challenge by the appellants.
[15] ... Reference was also made to a judgment of the Full Court in National Trust of Australia (Vic.) v Australian Temperance and General Mutual Life Assurance Society Limited and Anor in support of the proposition that a responsible authority is obliged to have regard to all relevant considerations in relation to both exempt components and to non-exempt components and that, therefore, the Tribunal on review, must do the same, that is, the scope of the relevant considerations for the Tribunal is defined by the purpose for which the discretion is conferred and not by the existence of an exemption. In the National Trust case the planning tribunal dismissed an objector's appeal on the grounds that the objections were concerned with conservation matters that were not relevant to a refusal to grant permits. Essentially, the planning issues in the case were concerned with the exercise of a discretion with respect to height controls.
[16] The National Trust case was concerned with circumstances where the relevant planning control was silent as to conservation matters hence rendering the objection irrelevant. In the present case the Act and Scheme specify the matters to be taken into account and the exemptions that are to apply with respect to objections. In this matter the scope of relevant considerations to be applied by the responsible authority and, if needs be, the Tribunal on review, is defined by the Planning and Environment Act and the Scheme.
To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies.
To conserve and enhance heritage places of natural or cultural significance.
To conserve and enhance those elements which contribute to the significance of heritage places.
To ensure that development does not adversely affect the significance of heritage places.
To conserve specifically identified heritage places by allowing a use that would otherwise be prohibited if this will demonstrably assist with the conservation of the significance of the heritage place.
in accordance with the endorsed plans and subject to the following conditions.
1 Before the use or development starts, amended plans to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be drawn to scale with dimensions and two copies must be provided. The plans must be generally in accordance with the elevations and sections depicting demolition (being plans TPO-201 and
TPO-301, dated September 2010) and the plans substituted at the hearing of Application for Review P1473/2011 but modified to show:
(a) The roof form depicted on plan TP1-100 consistent with the elevations.
(b) A full schedule of materials, finishes and paint colours, including colour samples (colour samples in a form that is able to be endorsed and held on file).
(c) The pedestrian door to the southwest elevation (Canterbury Place) to open entirely within the title boundary and not project over the footpath.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
[2] A purpose of the Heritage Overlay, in clause 43.01, is '[t]o ensure that development does not adversely affect the significance of heritage places.'
[3] In accordance with s.4(2) of the Victorian Civil and Administrative Tribunal Act 1998 a failure to make a decision is deemed to be a decision to refuse the application
[4] In setting out the reasons for my decision I do not recite all of the documentation tendered by the parties, as all material is retained on the Tribunal's file
[5] An incorporated document listed in the Schedule clause 81.01
[6] Arising from the review by Simon Reeves, Architectural Historian
[9] Policy relating to Additions and/or Alterations to Heritage Places in Clause 22.04-3
[13] HSPN 04: Laneways in Heritage Overlay Areas, City of Port Phillip Heritage Advisory Service, 22 March 2006
[14] Shalit and Faine v Boroondara CC & Ors [2002] VSC 528 at [9]
[15] National Trust of Australia (Vic) v Australian Temperance and General Mutual Life Assurance Society Ltd [1976] VicRp 60; [1976] VR 592
[17] Such as Returned Services League of Australia (Victorian Branch) Inc, Glenroy Sub-branch v Moreland CC [1998] 2 VR 406, [1999] VSCA 37. Also Minister for Immigration and Multicultural Affairs v Yusuf (2001) 206 CLR 325, [2001] HCA 30
Hermann
Port Phillip CC & Ors [2011] VCAT 2353
(2001) 206 CLR 325