[2025] VCAT 351
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-04-28
Original judgment source is linked above.

Figure 12: East elevation of Building 2, with the Tribunal's annotated dimension of the proposed building height above NGL (marked as 'original ground line'), extracted from the PNPE9 plans.
Figure 13: Streetscape elevation of Buildings 1 & 2, showing Townhouses 1 & 2 reduced in height by 1 metre, extracted from the plans circulated by the applicant on 26 February 2025, prepared by Jager Group, dated 25 February 2025.
Figure 14: West Elevation of Building 2, showing reduced First Floor floor-to-ceiling heights, lowered Second Floor finished floor levels and reduced overall height of Townhouses 1 and 2, with the Tribunal's annotated dimension of maximum overall height above NGL, extracted from the plans circulated by the applicant on 26 February 2025, prepared by Jager Group, dated 25 February 2025.
Will Building 2 be 'easily discernible from the opposite side of the street'?
For the purpose of this schedule 'Building height' means the vertical distance between the highest point of the building and the natural ground level immediately below that point. It does not include architectural features and building services.

Figure 15: Sightline diagram depicting the extent of Townhouse 7 that would be visible from the opposite side of Maroondah Highway, extracted from the PNPE9 plans.
Figure 16: Comparison of the Building 2 East Elevation with the cantilever as provided in the PNPE9 plans (L) and without the cantilever (R), extracted from Mr Blades' evidence statement at page 29.

Figure 17: Council's photo of the road reserve, taken from the northern kerb, opposite the subject land, which shows the northern footpath (right) is lower than the southern kerb (left). The level of the Healesville Walk car park (far right) is lower again.

Figure 18: Architect's render of the proposal, which shows Townhouses 1 & 2 (right) at the rear will be the most visible part of Building 2 from the public realm. Extracted from the applicant's submissions.
Figure 19: Photo of Temora House, abutting the western boundary of the subject land, extracted from the Council's submissions.
IS THE TREE REMOVAL AND LANDSCAPING PROPOSED ACCEPTABLE?
In summary, while the proposed buildings represent a major encroachment (as defined by AS4970-2009) into the TPZs of Trees 10, 11 and 12, existing conditions, including a steep, rocky embankment, are likely to have resulted in the majority of roots being concentrated at the top of the embankment away from proposed areas of excavation. The required excavation and construction of the building is therefore not expected to negatively impact the trees. Decks have been designed to enable above grade construction and provided footings are located to avoid roots >50mm diameter and existing soil levels are maintained below, these are not expected to impact the trees. Irrigated garden beds with a maximum fill of 150mm good quality garden soil are likely to improve conditions for the trees over conditions which currently exist. While some pruning will be required for Trees 10, 11 and 12, this is not expected to negatively impact the trees and will also result in adherence to vegetation management requirements within a BMO. A smaller, somewhat suppressed Oak is proposed to be removed with no permit requirements for its removal. Preparation of a Tree Management Plan is recommended to direct works around the protection of all trees to be retained on and neighbouring the site.

Figure 20: Ground Floor plan with annotations by Mr Walsh of modifications that could be made to provide compliant disabled access, circulated by the applicant on 26 February 2025.
The Head, Transport for Victoria has considered this application and does not object to the grant of a permit is subject to the following conditions:
The buildings are proposed to be constructed on the front boundary and this comprises a physical alteration of access (doors are also in different locations and extents).
A permit is required to create or alter access to a road in a Transport Zone 2. The planning and environment act (sic) defines road as: "road" includes highway, street, lane, footway, square, court, alley or right of way, whether a thoroughfare or not and whether accessible to the public generally or not;" at a minimum pedestrian access is proposed to be altered to the road and a planning permit is required for this (you will note that clause 52.29 relates to access not vehicle access). I also note that there are changes of use proposed (including dwelling and function centre which is also an alteration of access) and that the vehicle accessway grades and widths adjacent to the front boundary appear to be altered (also changing access to the land to the west). There is no extra fee by a S50 amendment is required. You will note DTP's response under S55 (referred under Clause 52.29 and Clause 66.03):
Thank you for your referral dated 21 August 2023 of the above application to the Head, Transport for Victoria under Section 55 of the Planning and Environment Act 1987.
The Head, Transport for Victoria has considered this application and does not object to the grant of a permit is (sic) subject to the following conditions:
Please forward a copy of any decision to this office as required under the Planning and Environment Act 1987.
A lack of objection has no relevance on determining whether a planning permit and / or referral is required.
...as a matter of statutory interpretation, when considering the relevant context in which the words 'create or alter access' is to be construed, regard should be given to the whole of clause 52.29 in which those words appear.
...
The purpose of clause 52.29 is as follows -
To ensure appropriate access to the Principal Road Network or land planned to form part of the Principal Road Network.
To ensure appropriate subdivision of land adjacent to Principal Road Network or land planned to form part of the Principal Road Network.
Protect and develop the Principal Road Network to:
Will the development result in any unacceptable impacts on the amenity of adjoining or nearby properties?
To ensure that the height and setback of a building from a boundary respects the existing or preferred neighbourhood character and limits the impact on the amenity of existing dwellings or small second dwellings.
Figure 21: South Elevation of Building 2 depicting the height of TH1 (far left) and TH2 reduced by 1 metre. Extracted from the plans circulated by the applicant on 25 February 2025.
To use land for accommodation (dwellings) where the frontage at ground floor exceeds 2 metres.
To construct a building or construct or carry out works.
To construct a building or construct or carry out works for any use in Section 2 of clause 36.04-1.
To construct a building or construct or carry out works, including:
To construct a building or construct or carry out works.
To construct a building or construct or carry out works associated with accommodation and retail premises.
To remove, destroy or lop native vegetation and any plant species that does not occur naturally in the locality that is greater than 5 metres in height, in the Commercial 1 Zone.
To reduce (including reduce to zero) the number of car parking spaces required under cl 52.06-5.
a) Deletion of the Level 3 northern cantilever to TH05, TH06 and TH07 generally in accordance with plans dated 31 January 2025, prepared by the Jaeger Group, appended to the evidence statement of Brodie Blades in Victorian Civil and Administrative Tribunal proceeding P1045/2024 and dated February 2025.
b) A minimum 1.0 metre reduction in the overall height of TH01 and TH02 generally in accordance with plans dated 25 February 2025, prepared by Jaeger Group.
c) Provision of a 300mm culvert, 10.5 metres in length located along the eastern boundary (within the drainage easement) under bedroom 3 of TH7.
d) The leasable floor area of the shop tenancies to be shown consistently throughout the plans.
e) A minimum 1.8-metre-high paling fence along the south, east and west boundaries where they abut secluded private open space.
f) Dimensions annotated showing the extent of cut and fill proposed in all elevations and sections.
g) The location and height of proposed retaining walls.
h) Minimum 1.7m high screening (maximum 25% openings) between balconies and minimum 1.7 high internal fencing between secluded private open space.
j) A minimum of 6 cubic metres of externally accessible, secure storage space for each dwelling.
k) Accurate representation of the Tree Protection Zone of all trees to be retained, consistent with the arboricultural report prepared by dB Horticulture Pty Ltd, dated 27 March 2024.
m) Environmentally Sustainable Design measures consistent with those required by the approved Sustainability Management Plan shown or annotated on the plans, including but not limited to:
- Minimum 20,000 and 10,000 litre rainwater water tanks harvesting roof water of both buildings to be used for toilet flushing.
- double glazing (or better) for all dwellings.
- clothesline for each dwelling.
- location of separate meters.
- electric hot water systems.
- vehicle charging point/s.
- Minimum 10 kW solar photovoltaic system on the roof of Building 1 (the northern building) and minimum 14kW solar photovoltaic system on the roof of Building 2 (the southern building).
n) Signage to identify shop staff and residential visitor car spaces.
o) A minimum of five car spaces identified as 'staff parking', inclusive of the disabled car space.
p) Provision of signage requiring left-turn-only egress from the subject land.
q) Intercom to dwellings provided at the boom gate for visitor access.
r) The provision of wheel stops to car spaces 2-9.
s) Modifications to the Ground Floor generally in accordance with the recommendations of Mr Walsh as shown in the annotated plan (marked G36201, TFX, TA (11292) 25/02/2025), including:
- Access ramps with a gradient of 1:14 for a length of 4.2 metres and 9.0 metres, respectively, along the eastern boundary.
- An access ramp with a gradient of 1:14 and a length of 4.15 metres along the rear of Shop 5, with a landing adjacent to the Shop 5 rear door.
- Setbacks sufficient for wheelchair circulation where the pedestrian path changes direction at the eastern boundary intersections with the southern façade of Building 1 and the northern façade of Building 2.
- The rear door of the residential lobby in Building 1 to open inward and be widened to have a minimum clear width of 950 millimetres.
t) Water tanks required by the approved Bushfire Management Plan shown and labelled for Country Fire Authority purposes, with Country Fire Authority vehicle distances annotated.
u) Any modifications required by the approved Bushfire Management Plan.
a) Deletion of reference to a restaurant use. > > b) Demonstrate the means by which garbage and recyclables will be stored on the site. > > c) What waste services will be provided (i.e. cardboard paper plastic and metals recycling or comingled waste, general waste and even organic waste). > > d) Types of bins. > > e) Types of collection vehicles. > > f) Frequency of collection. > > g) Times of collection. > > h) Location of collection point for vehicles.
j) Collection for the shop tenancies to continue to be undertaken by the Council, along the Maroondah Highway frontage.
Waste storage and collection must be undertaken in accordance with the endorsed waste management plan and must be conducted in such a manner as not to affect the amenity of the surrounding area and which does not cause any unreasonable interference with the circulation and parking of vehicles on abutting streets, to the satisfaction of the responsible authority.
a) Measures to ensure all construction workers and contractors are aware of the requirements in the approved Tree Protection Plan and Tree Management Plan. > > b) A traffic management plan for the site, including when or whether any access points would be required to be blocked, an outline of requests to occupy public footpaths or roads, or anticipated disruptions to local services, preferred routes for trucks delivering to the site, queuing/sequencing, excavation and swept-path diagrams. > > c) The location for the parking of all construction vehicles and construction worker vehicles during construction. > > d) Construction times, noise and vibration controls. > > e) Fully detailed plan indicating where construction hoardings would be located. > > f) A waste management plan including the containment of waste on site: disposal of waste and stormwater treatment. > > g) Containment of dust, dirt and mud within the site and method and frequency of clean up procedures in the event of build-up of matter outside the site. > > h) Site security.
j) Remediation of any damage to road and other infrastructure caused by the construction activities. > > k) An emergency contact that is available 24 hours a day for residents and the responsible authority in the event of relevant queries or problems experienced.
m) Measures to ensure all contractors associated with the construction of the development are aware of the contents of the approved Construction Management Plan. > > n) Details of crane activities, if any. > > o) Discharge of any polluted water. > > p) Erosion control measures. > > q) Sediment control measures.
a) The tree protection zone of all retained trees. > > b) The planting of a Pin Oak (Quercus Palustris) in the landscape bed within the road reserve or alternative species to the satisfaction of the responsible authority. > > c) Details of water efficient landscaping in accordance with the approved Sustainability Management Plan. > > d) Planting to be in accordance with the approved Bushfire Management Plan defendable space when mature, including 5 metre tree canopy separation of plantings (excluding existing trees to be retained), 2 metres ground clearance, plant heights / distances from windows, no shrubs under trees, canopies clear of buildings. > > e) Buildings and trees (including botanical names, trunk location, trunk diameter and canopy spread) on neighbouring properties where the Tree Protection Zones of such trees fall within the subject site as calculated in accordance with Australian Standard 4970-2009 Protection of Trees on Development Sites or its successor. > > f) Details of surface finishes of pathways and driveways, with paving colours and materials of the pedestrian access and dwelling uncovered tandem car spaces to differ to those in the common car park and access aisles. > > g) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant. All species selected must be to the satisfaction of the responsible authority. > > h) A minimum of one small canopy tree (2 metres high at the time of planting) reaching a minimum mature height of 5 metres within the rear secluded private open space of TH03.
j) The provision of notes regarding site preparation, including the removal of all weeds, proposed mulch, soil types and thickness, subsoil preparation and any specific maintenance requirements. > > k) The location of any tree protection zones and protection measures including for street trees accurately drawn to scale, labelled and notations referring to any endorsed Tree Management and Protection Plan, and/or Arboricultural Report.
m) Replacement of the area marked 'Turn Around Area' on the Ground Floor Level 1 Plan with a garden bed containing a canopy tree with underplanting.
a) A Tree Protection Plan (drawing) drawn to scale and appropriately notated that shows: > > 1. The Tree Protection Zone (TPZ) and Structural Root Zone (SRZ) of Tree Nos. 1, 2, 3, 4, 6, 8, 10, 11, 12, 13, 15, 16, 17, 18, 19 & 20 (as identified in the Arboricultural & Impact Assessment Report submitted with the permit application, dated 27 March 2024, prepared by DB Horticulture Pty Ltd). > 2. Tree protection fencing, or ground protection where required. > 3. An annotation that all excavation works within the Tree Protection Zone of Trees 10, 11, 12 and 13 are to be supervised by a AQF 5 level arborist. > 4. The type of foundation/s (illustration or notation) within each tree protection zone. > 5. The location of any service to be located within the tree protection zone and a notation that all services will either be located outside the tree protection zone, bored under the tree protection zone, or installed using hydro excavation under the supervision of the project arborist. > 6. A notation to refer to the Tree Management Plan for specific detail on the actions required within a tree protection zone. > > b) A Tree Management Plan that sets out: > > 1. specific recommendations in accordance with the Australian Standard AS4970-2009 - Protection of Trees on Development Sites (or its successor). > 2. all required tree protection and management actions during each stage of the development (Demolition, Excavation, Construction and Landscaping). > 3. how excavation impacts, including soil level changes, within the tree protection zone of trees to be retained will be managed. > 4. proposed tree protection measures including fencing or ground, trunk or branch protection as required during each stage of the development. > 5. any pruning to be undertaken being in accordance with Australian Standard 4373-2007 or its successor. > 6. how the canopy of trees shown on the Tree Protection Plan will be protected or managed during each stage of the development. > 7. appropriate signage on any tree protection fencing. > 8. any non-destructive root investigation previously undertaken to determine the location and distribution of roots of trees nominated on the Tree Protection Plan/s. > 9. proposed footings and construction methods for any buildings or structures (including but not limited to, driveways, paths retaining walls or other hard infrastructure) within the tree protection zones nominated on the Tree Protection Plan/s. > 10. details of suitable driveway/path materials and construction methods (i.e., permeable paving above grade) and the timing of works within the tree protection zones. > 11. stages of development at which inspections are required to ensure the tree protection measures are adhered to. > 12. methods of certification by a suitably qualified arborist of the required tree protection measures during the development including details of site visits, actions and photographic evidence. > 13. the process that will be followed if any damage occurs to a protected tree, including reporting of damage to any Council owned tree. > 14. any other measures required to demonstrate the successful ongoing retention and viability during and post-construction of any trees nominated on the Tree Protection Plan.
Tree Maintenance Management Plan - English Oaks
a) Recommendations for the regular, ongoing care and maintenance of the retained English Oak trees by a suitably qualified and experienced arborist. > > b) A schedule for maintenance and management of the retained English Oak trees. > > c) A protocol for gaining access into the secluded private open spaces of TH04, TH05, TH06 and TH07 for the purposes of care and maintenance of the retained English Oak trees.
a) Demonstrate compliance with cl 15.01-2L of the Yarra Ranges Planning Scheme for developments over 10 dwellings. > > b) Provide a Green Travel Plan. > > c) Provide for Food Organics and Garden Organics (FOGO) in Built Environment Sustainability Scorecard (BESS). > > d) Commit to full electric building (no gas connection). > > e) Provide dedicated electric vehicle charging to each garage space.
Certification of implementation of Sustainability Management Plan
a) Dwelling residents - a minimum of: > > 1. 1 or 2-bedroom dwellings: 1 car space per dwelling. > 2. 3-bedroom dwellings: 2 car spaces per dwelling. > > b) Dwelling visitors: 1 car space. > > c) Shop employees: 5 car spaces, inclusive of 1 accessible car space.
Section 173 Agreement
a) The English Oak trees (identified as Tree Nos. 10, 11, 12 and 13 in the Arboricultural & Impact Assessment Report, dated 27 March 2024, prepared by DB Horticulture Pty Ltd) must not be removed or destroyed and the ongoing care and management of the trees is the joint responsibility of the owners of dwellings TH04, TH05, TH06 and TH07 and must be undertaken in accordance with the Tree Maintenance Management Plan approved under planning permit no. YR-2023/577.
This agreement must be registered on the title to the land in accordance with s 181 of the Planning and Environment Act 1987 (Vic). The owner must pay the responsible authority's costs to prepare, review, execute and register the s 173 agreement.
Conditions required by the Country Fire Authority
a) Defendable space for a distance of 50 metres around the proposed building (or to the property boundary, whichever is the lesser distance) must be provided where vegetation (and other flammable materials) will be modified and managed in accordance with the following requirements: > > 1. Grass must be short cropped and maintained during the declared fire danger period. > 2. All leaves and vegetation debris must be removed at regular intervals during the declared fire danger period. > 3. Within 10 metres of a building, flammable objects must not be located close to the vulnerable parts of the building. > 4. Plants greater than 10 centimetres in height must not be placed within 3 metres of a window or glass feature of the building. > 5. Shrubs must not be located under the canopy of trees. > 6. Individual and clumps of shrubs must not exceed 5 square metres in area and must be separated by at least 5 metres. > 7. Trees must not overhang or touch any elements of the building. > 8. The canopy of trees must be separated by at least 5 metres - with the exception of trees 10, 11, 12 and 13 as shown on this plan. > 9. There must be a clearance of at least 2 metres between the lowest tree branches and ground level.
a) The development is not started within two years of the issue date of this permit, or > > b) The development is not completed within four years of the issue date of this permit.
In accordance with s 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] Planning Scheme Amendment VC267 ('VC267') was gazetted on 6 March 2025 and came into operation on 31 March 2025. The parties were provided with the opportunity to make written submissions addressing any implications for this proceeding arising from VC267. Submissions were received from the Council and applicant. Each state there are no significant implications for this proceeding arising from the amendment. I have considered the submissions and agree with the parties.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[5] Council's submissions, at [141] and oral submissions.
[6] Healesville Street Trees and Streetscape Statement of Significance, HO159.
[7] The remains of the large tree stump were still visible on the accompanied site inspection.
[9] Planning Scheme Amendment C212yran proposes to introduce a new local policy and new Schedule 21 to the DDO applying to Monbulk Town Centre. The amendment consequently proposes to amend DDO12 so that it no longer applies to Monbulk. The amendment commenced exhibition on 18 March 2025.
[14] Applicant's closing submission, dated 27 February 2025, at [23].
[15] Planning permit 381/86, issued by Shire of Healesville, dated 24 February 1987 and associated plans endorsed on 2 June 1987, allowing erection and use of five shops on the subject land.
[16] Evidence statement of Mr Blades, page 20.
[17] Applicant's closing submission, at [31].
[18] Evidence statement of Mr Blades, at [64].
[19] Based on the Tribunal's digital scaling and dimensioning of the West Elevation, dated 25 February 2025, measured from 'original ground line'.
[20] Council oral submissions, day 1 of the hearing.
[21] Clause 4.0, Schedule 12 of the DDO, 'Town centre character'.
[22] 'New buildings should be constructed with zero setbacks from the main street frontage'.
[23] Applicant's closing submission, at [18c] and [21].
[25] Clause 15.03-1L, Heritage, Strategies, Commercial.
[26] Clause 4.0, DDO12, Design requirements.
[27] The revised maximum height of TH1 would be approximately 5.9 metres on its west elevation and approximately 4.1 metres on its south elevation.
[29] Respondent's PowerPoint presentation, slide 33.
[30] Traffic Impact Assessment Report, Project No. 220854, dated 1 December 2023, prepared by Trafficworks.
[31] Saturday 17 June 2023, 9:00am-6:00pm, Wednesday 21 June 2023, 9:00am-6:00pm, Friday 10 November 2023, 6:00pm-midnight, Saturday 11 November 2023, 6:00pm-midnight and Sunday 12 November 2023, 9:00am-midnight.
[32] Mr Walsh's evidence statement, at [68].
[33] Mr Walsh's evidence statement, at [71].
[34] Mr Walsh's evidence statement, at [72].
[35] Mr Walsh's evidence statement, at [60].
[36] Mr Walsh's evidence statement, at [74]-[77].
[37] Mr Walsh's evidence statement, at [78]-[80].
[38] Mr Walsh's evidence statement, at [41]-[42].
[39] For example, at clauses 11.03-1S, 11.03-1L-01 and 17.04-1S.
[41] At cl 34.01-8 (Decision guidelines, General) which includes a requirement to consider, as appropriate, the Municipal Planning Strategy and the Planning Policy Framework.
[44] Extracted from the applicant's response, dated 11 December 2023, to the Council's request for information.
[47] As in force immediately before the approval of VC267.
Gadome Pty Ltd
Yarra Ranges SC [2025] VCAT 351