[2011] VCAT 1919
Victorian Civil and Administrative Tribunal
2011-10-05
Original judgment source is linked above.
Application under section 77 of the Planning and Environment Act 1987; Surf Coast Planning Scheme; Residential 1 Zone; Proposal to Subdivide Land into 17 Lots and Remove Native Vegetation; Climate Change; Stormwater Management and Run-off; Vegetation Removal; Design of New Road; Neighbourhood Character.
Barwon Water, Ms G Mullins, Mr B Evans and Mr G Gill
Findlay v Surf Coast SC [2011] VCAT 1919
Mr T Ferrari, planning consultant of St Quentin Consulting
The land is a generally square property with three street frontages comprised of 10 lots. It is used as a holiday park with 75 transportable cabins and a two storey manager's house. It has an area of 10,400 sqm with scattered trees providing an open canopy cover. There is one vehicle entry point off Camp Road at present. The land falls gently from east to west towards the Anglesea River.
To subdivide the land into 17 lots of varying sizes between 459 and 872 sqm, and to remove native vegetation for the construction of roads and services
Section 77 Planning and Environment Act 1987
Clause 42.03-2 To construct or carry out works and to remove vegetation in SLO3
... Council accepts that inundation, of all forms, of the proposed lots by 2100 is likely to be minor (no more than a 200-300mm depth) and only to a small portion of the lots. Inundation of Bingley Parade is likely to become more regular and to greater depths which would present a risk to people attempting to use Bingley Parade. It is submitted that access to all of the western lots should be from the new road and not Bingley Parade, consistent with the recommendations of the CCMA.
Avoid development on ridgelines, primary coastal dune systems and low lying coastal areas.
To retain and enhance the native vegetation cover, with emphasis on indigenous species and the Coastal Moonah Woodland vegetation community in particular.
... within the context of development being scaled to comply with the policy standards, it is considered that development of the land can follow subdivision in a manner that does not detract from the positive elements of the neighbourhood character.
[1] Refer to Lake Park Holdings Pty Ltd v East Gippsland SC [2011] VCAT 1491
[2] I do note a small part of lot 5 may also be affected but I accept that is a very small area that may be affected.
[3] I note the CHVA (July 2011) states 2.79 metres AHD
[4] Extract from clause 11.05-4, page 19 of 21
[6] Refer to clause 13.01-1 of the State Planning Policy Framework
[7] The 1% AEP catchment generate flood level identified in the CHVA (July 2011)
[8] The upper projected storm tide level identified by the CCMA
[9] Clause 52.43 exempts the removal of vegetation within 10 metres of a building used for accommodation irrespective of SLO3 and SMO, therefore it is Council's view that all vegetation can be removed without a permit and it is the Applicant's view only 6 trees require planning permission to be removed.
[10] The Council submitted it has always been a part of the permit application plans, and the Applicant was unaware of why a council road is being proposed.
Findlay