[2011] VCAT 1491
Victorian Civil and Administrative Tribunal
2011-08-04
Mr P, Ms J
Original judgment source is linked above.
Application under section 79 of the Planning and Environment Act 1987; East Gippsland Planning Scheme; Residential 1 Zone; Design and Development Overlay Schedule 14; Land Subject to Inundation Overlay; Erosion Management Overlay; Proposed Subdivision of 82 Lots; Traffic and Pedestrian Safety Implications; Need for Further Residential Lots; Native Vegetation Retention; Climate Change and Sea Level Rise; Need for Design to Respond to Current Policies and Controls.
Mr P and Mrs R Albrecht, Telstra Referral Officer, SPI Electricity Pty Ltd, APA Group, East Gippsland Water, Department of Sustainability & Environment, West Gippsland Catchment Management Authority, Country Fire Authority, VicRoads, Ms J Williams, Director of Public Transport, Ms S Watson, Mr D Morrison, Mr I Wickens and others, Mr G Buchanan, Mr C Glassock, Ms L Wilkinson, Mr V Martin, Ms C Evans and Gippsland Coastal Board.
Lot C (also known as 10) Fullarton Drive, Paynesville
15-16 March (Bairnsdale) and 7-8 July (Melbourne) 2011
Lake Park Holdings Pty Ltd v East Gippsland SC [2011] VCAT 1491
SK Spatial Land Surveying Consultants and One Plan Land Development Group
08023 PR-7 Proposed Subdivision Plan & 08023 ST-4 Proposed Staging Plan
Mr S Torrington, planning consultant of BP Town Planning Pty Ltd / One Plan.
Ms R Albrecht, Mr P Albrecht, Ms S Watson, Mr D Morrison, Mr I Wickens and Ms L Wilkinson
The land is located within the northwest area of Paynesville township. It is approximately 10.7 hectares and is used for grazing purposes. It contains scattered native vegetation and one large old tree. It slopes down to and fronts the Gippsland Lakes Foreshore Reserve abutting the northern boundary of the land. This Crown land coastal reserve includes the Point Fullarton wetland and is part of the Gippsland Lakes Ramsar site. The land abuts existing residential subdivisions (and houses) along its southern boundary.
To subdivide the land into 82 lots with an average lot size of 819m2; to create a restriction limiting development on each lot to 7.5m above natural ground level; to remove 0.39 ha of native vegetation (3.6% of the land); to undertake earthworks including fill on lots and the creation of wetland; and to create a public open space reserve to be handed over to Council that includes the wetland.
Section 79 Planning and Environment Act 1987
Clauses 44.01-1, 44.01-2 & 44.01-4 To subdivide land, to remove vegetation and to carry out works in EMO
Clauses 44.04-1 & 44.04-2 To construct a building and to construct or carry out works, including a fence and to subdivide land in LSIO
Printz v Glenelg SC [2010] VCAT 1975 ('the Printz case')
State Planning Policy Framework and Coastal Planning
Avoid development on ridgelines, primary coastal dune systems and low lying coastal areas.
In our view, this is an example of 'maladaptation'.
.....we note that the policies contained in the VCS call for caution in allowing development in coastal spaces, in part so that the future ability to apply adaptation strategies are not compromised and in part so that planning can respond to the best available and emerging science and monitoring about climate change impacts. In short, if development can be avoided in areas that are vulnerable, this is a more orderly planning outcome.
... We interpret such an express term to mean that the door has been left open for the consideration of a sea level rise greater than 0.8 metres. The State planning policy refers to both not less than 0.8 metres and applying the precautionary principle. Again, this suggests the door has been left open for consideration of a sea level rise greater than 0.8 metres. Whether that is appropriate will depend upon the circumstances of the particular site, the nature of the proposal and the scientific information available at the time.
[1] Section 61(3)(a) of the Planning & Environment Act 1987 states the Responsible Authority (and, upon review, this Tribunal) must not grant a permit to use or develop coastal Crown land within the meaning of the Coastal Management Act 1995 unless the Minister administering that Act has consented under that Act to the use or development.
[2] The projected 1% Annual Exceedance Probability (AEP) flood level to 2100 is 2.8m AHD
[3] Despite the Council's decision to support the amended plans subject to changes, this application for review is deemed to be a refusal pursuant to section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998.
[4] Extract from clause 11.05-4, page 19 of 21
[6] Refer to clause 13.01-1 of the State Planning Policy Framework
[7] There is a reference to a permit trigger under DDO14 to buildings above 7.5m in height