[2025] QSC 77
General information, not legal advice.
Supreme Court of Queensland
2025-04-17
Williams J
Original judgment source is linked above.
Macpherson Kelley for the first, second and third plaintiffs
(Shine Lawyers for the first, second and third plaintiffs for the part of the hearing in 2023)
(a) "abandoned" their claim in the Fourth Further Amended Statement of Claim (4FASOC) and, as the plaintiffs "[did] not press their claim against the defendants", proposed that the claim be dismissed with costs; and
(b) maintained their opposition to the defendants' counterclaim.
(a) The Court would hear the oral submissions on the counterclaim and complete the trial. This was done on 5 September 2024.
(b) The Court's decision on the counterclaim would be reserved and reasons delivered in respect of the issues on the counterclaim. These are those reasons.
(c) The Court will then hear further from the parties in respect of the appropriate final orders in relation to the plaintiffs' claim and the defendants' counterclaim.
(d) Once final orders are made, the Court will then proceed to deal with costs.
(a) "The effect of the Temporary Levee on Riverview during flood events."
(b) "Whether the [defendants] are entitled to an injunction that the Temporary Levee be removed."
Relevant pleading of the claim and counterclaim, including in respect of the Temporary Levee and the 2023 Works
(a) Damages for nuisance, claiming loss and damage including the costs to rectify damage, lost profits, and a diminution in the value of Riverview.
(b) Damages for negligence, claiming loss and damage including the costs of repairs and other losses (including in relation to the "Temporary Bank").
(c) An injunction restraining the defendants from "diverting water onto Riverview" (practically, to remove certain alleged works on Mikandra that the plaintiffs asserted had this effect) or, alternatively, compensation for the diminution in value of Riverview (including the effect of the "Temporary Bank" on Riverview).
(a) [94(e)]: "lost profits from a reduced cropping area resulting from
the construction of a temporary levee bank (Temporary Bank) to provide potential protection to Riverview from the effects of floodwater following the New Course until injunctive relief can be obtained in the amount of $41,114;
(b) [94(g)]: "the cost of building the Temporary Bank in the sum of
(c) [94(h)]: "the costs of removing the Temporary Bank on injunctive
The plaintiffs rely on the quote dated 12 October 2016 provided by M.J & N.T Armstrong."
(a) that from the 2022 flood event onwards, any adverse impacts on Riverview were due to the "Temporary Levee (Temporary Bank)".[6]
(b) that if Riverview did suffer loss and damage, that in all or in part was caused by alterations done by the plaintiffs, including the "Temporary Levee (Temporary Bank)".[7]
(c) a positive denial that the "Temporary Bank" was "a necessary or appropriate response to the flood events the subject of [the] proceeding" and a further denial that the "Temporary Bank" was justified by the Irrigation Infrastructure[8] or any conduct by the defendants.[9]
(a) Between 2013 and 2017, the Temporary Levee was constructed by the plaintiffs on Riverview, approximately along the southern boundary of Block 8.
(b) During "moderate flood events" the Temporary Levee causes water flowing in a northerly direction over Riverview to be blocked and to pool on Mikandra.
(c) As a consequence, silt and debris would be deposited on Mikandra, causing damage to crops in the areas of Block 1 and Block 2 where there would be pooling.
(d) This occurred in 2017, twice in 2021, three times in 2022, and is likely to occur again.
(e) In these circumstances, the Temporary Levee has the effect of "causing material damage to Mikandra".
(f) The plaintiffs built the Temporary Levee "for the purpose of blocking overland water flow from Mikandra from entering Riverview along the southern boundary of Riverview Block 8".
(g) It was "reasonably foreseeable (indeed inevitable) that the construction of the Temporary Levee would cause water flowing in a northerly direction over Riverview to be blocked and to pool on Mikandra, and consequently deposit silt and debris on Mikandra and cause damage to crops planted on Mikandra in the location of the pooling on Blocks 1 and 2 on Mikandra".
(h) Consequently, the construction of the Temporary Levee was:
(i) unreasonable in all of the circumstances, including the effect it was likely to have on Mikandra;
(ii) the cause of an unreasonable interference with the defendants' use and occupation of Mikandra; and
(iii) an actionable nuisance.
"The effects of the 2023 Works included that in the event of a major flood event, floodwaters would back up against the eastern part of the Temporary Levee and be diverted westwards, such that rather than flowing over Riverview in a north-westerly direction, water at increased velocity and depth would be diverted over the northern part of Mikandra Block 2 and over Riverview Block 9, causing:
(a) erosion to the land (including both cultivated land and roadways) and damage to any crops planted in the affected part of Mikandra Block 2;
(b) to the extent that the Temporary Levee (as varied by the 2023 Works) causes water to back up behind the Temporary Levee, any area so affected would likely:
(i) suffer siltation of any drains in the silt-affected area;
(ii) as a result of being waterlogged be more difficult to traverse with machinery for an extended period of time, hampering cultivation and spraying and picking of cotton in the affected areas of cropping land".
(a) Without advance notice to the defendants and without the defendants' permission or consent.
(b) Without any modelling or investigation as to the effect or impact of the 2023 Works on the defendants. It is alleged that in particular this is the case where:
(i) The Temporary Levee was built (and has continued) for "the purpose of protecting Riverview from surface water flowing and discharge from Mikandra".
(ii) The first plaintiff conceded that before the Temporary Levee was built and/or the 2023 Works, he knew the Temporary Levee would affect the flow of water across Mikandra, cause water to back-up on Mikandra, force water to the east and west of the Temporary Levee, cause silt to be dropped on Mikandra, and cause damage to Mikandra.
(iii) The plaintiffs, and Brett Enkelmann, knew and understood that the defendants were alleging in the counterclaim that the effect of the Temporary Levee was that it caused damage to Mikandra, and that modelling was necessary to predict the likely flow of water in flood events over Riverview and Mikandra.
(a) The Temporary Levee was intended by the plaintiffs to "have the effect of blocking overland water flow passing over Mikandra and onto Riverview in a significant flood event".
(b) The Temporary Levee was likely to "block overland waterflow passing over Mikandra and onto Riverview in a significant flood event and cause water flow over Riverview Block 9 and Mikandra Block 2, thereby causing erosion to Mikandra Block 2 and damage crops in the area of that diverted water".
(a) The 2023 Works were built with the same substantive purpose as the Temporary Levee, including the purpose of "blocking overland water flow from Mikandra from entering Riverview along the southern boundary of Riverview Block 8".
(b) It was reasonably foreseeable (and/or inevitable) that the construction of the 2023 Works would cause water flowing in a north-westerly direction over Riverview to be blocked and to be diverted westerly across the northern part of Mikandra Block 2, to cause erosion and deposit of silt and debris on Mikandra and cause damage to any crops in the area where water was diverted.
(c) Consequently, the construction of the 2023 Works was unreasonable, likely to cause unreasonable interference with the defendants' use and occupation of Mikandra, and a likely cause of actionable nuisance to support an injunction to restore the area to the level existing prior to the construction of the Temporary Levee and the 2023 Works.
"[71] The plaintiffs repeat and rely upon the matters pleaded at paragraphs 1 - 100 of the statement of claim."
(a) The Temporary Levee does not cause water flowing in a northerly direction over Riverview to be blocked and to pool on Mikandra and otherwise deny the allegations.
(b) A denial that the Temporary Levee has the effect contended for in the counterclaim.
(c) That the plaintiffs built the Temporary Levee for the "sole purpose of mitigating against the tortious conduct of the defendant[s] constituted by the Works", and otherwise deny the allegations.
(a) "[T]hat the building of the structure was in protection of the plaintiffs from the tortious conduct of the defendants;
(b) [T]he structure was constructed in accordance with expert advice obtained;
(c) [I]n the circumstances pleaded at sub-paragraph 75(a)[14] ... the defendants do not have clean hands;
(d) [B]y refusing to remove the Works, the defendants have refused to do equity."
Plaintiffs approach following the abandonment of the claim
"It does not follow that the [Temporary Levee] is an actionable nuisance. It is still for the [defendants] to make out the elements of the tort. Aside from the fact of the construction of the [Temporary Levee], none of the elements of the tort has ever been conceded."
"... our case now ... is really to say that the evidence on [the defendants'] case for the counter-claim, taken at its highest, doesn't get them there. It's not part of our defence. You don't need to make any finding based on Mr Giles' reports to find in [the plaintiffs'] favour".[19]
(a) "[The plaintiffs do not] urge [the Court] to accept facts set out in - or opinions set out in the reports of Mr Giles... [the plaintiffs'] submissions ... are based on the proposition that ... the defendants, the counter-claimants, haven't come up to proof".[20]
(b) "[The plaintiffs are] not going to urge [the Court] to accept anything in [Mr Giles'] reports".[21]
(a) Is the water which flows over Mikandra and onto Riverview at the location of the Temporary Levee a natural watercourse?
(b) Does the Gartner v Kidman "defence" apply in respect of the Temporary Levee?
(c) Have the defendants established nuisance?
(d) If so, should an injunction be granted requiring the plaintiffs to remove the Temporary Levee?
Is the water which flows over Mikandra and onto Riverview at the location of the Temporary Levee a natural watercourse?
(a) "[T]he flow of water over Mikandra, Riverview and the Lagoon Land depended upon the location, timing, and volume of rainfall in the catchments which feed into those properties".[25]
(b) "[T]o the extent that water passes over Mikandra and enters Riverview during flooding events, the water does not enter Riverview at a single point or points".[26]
(c) "Riverview, Mikandra and the Lagoon Land are located in a floodplain".[27]
(d) "Riverview and Mikandra are affected in different ways by the flood events of different magnitudes".[28]
(e) "[I]n the event of significant flood events, Riverview is affected by overland flow which is not materially increased in terms of velocity, volume or duration by:
(i) the topography of Mikandra; or
(ii) any improvements which [the defendants] have made to Mikandra, including but not limited to the Irrigation Infrastructure".[29]
(f) "[T]he relevant catchment which collects water which flows over Mikandra, Riverview and the Reserve in significant flood events is the Barambah Creek catchment which drains a catchment area of approximately 2,950km2".[30]
(a) The topography of Mikandra includes the Irrigation Infrastructure admitted by the defendants at [6(a)] of the Amended Defence and Counterclaim.
(b) In respect of the "Works" defined in [6] of the 4FASOC:
(i) Levees 4, 5, 6 and 7 do not exist on Mikandra and have never existed; and
(ii) Levees 1, 2 and 3 and the Ring Tank have no adverse effect on the flow of flood waters through Mikandra and onto Riverview.
(c) The topography of Mikandra is reflected in the modelling of Dr Markar.
(d) The topography of Mikandra is reflected in the drainage map [DEF.014.001.0027] prepared by Mr Byrom based on 2012 LIDAR data.
(a) I accept the evidence of Dr Markar:
(i) in the First Markar Report [DEF.012.001.1502];
(ii) in the Second Markar Report [DEF.012.001.1503];
(iii) in the Third Markar Report [DEF.014.001.0004];
(iv) in the Fourth Markar Report [DEF.020.001.0022];
(v) in the Fifth Markar Report [DEF.998.001.0001]; and
(vi) his evidence at trial.
(b) In particular:
(i) Riverview and Mikandra are located within the Barambah Creek catchment.
(ii) There are "three significant local watercourses draining through Riverview and/or Mikandra:
- Hansens Gully, which is a tributary of Barambah Creek;
- A watercourse, which is a major tributary of Hansens Gully, labelled as 'Fairdale-Leafdale Gully' in the plaintiffs' statement of claim ...; and
- A watercourse labelled ... as 'Lagoon Gully', which is tributary of Fairdale-Leafdale Gully."[32]
(iii) Flooding of Riverview and Mikandra can occur from:
- (A) Barambah Creek; and/or
- (B) Hansens Gully and its tributaries: Fairdale-Leafdale Gully and Lagoon Gully.
(iv) In respect of flooding from Barambah Creek, this can occur from overflow from the creek with or without local catchment flooding.
(v) Catchment flooding impacting Riverview would occur from the water flow entering Riverview predominantly from the Fairdale-Leafdale Gully and Lagoon Gully, and to a lesser extent Hansens Gully. There could also be direct rainfall and runoff on Riverview. This local catchment flooding could occur with or without Barambah Creek flooding.
(vi) Local catchment flooding of Riverview and Mikandra would occur due to intense short-duration rainfall bursts of less than approximately 6 hours duration, and this flooding would generally last only a few hours.
(vii) Flooding of Riverview and Mikandra from Barambah Creek would occur due to prolonged rainfall events of approximately 12 to 72 hours duration, and this flooding would last a few days.
(viii) Flooding of Riverview and Mikandra from Barambah Creek would be more significant than flooding from local catchments.
(a) some earlier work by the Queensland Water Resources Commission in an "Agricultural Drainage Study" in October 1982 [DEF.001.001.0048]; and
(b) some later work that was done for a report prepared for the Burnett Mary Regional Group for Natural Resource Management Ltd in 2014 [DEF.004.002.0043].
"It seems to me, on an examination of such authorities as exist and of the work of recognized writers on this subject, as well as the decision of the Court, that it is settled that a watercourse consists of a stream with a bed, with banks, and water. That the flow of water in the stream is intermittent or seasonal will not prevent what would otherwise be a watercourse from being accounted such: but though it is quite true that a watercourse may exist though its bed be dry for some periods, the watercourse, in my opinion, must exhibit features of continuity, permanence and unity, best seen, of course, in the existence of a defined bed and banks with flowing water. It must, in my opinion, essentially be a stream and be sharply distinguished from a mere drain, or a drainage depression in the contours of the land which serves to relieve upper land of excess water in time of major precipitation...".[34]
(a) In Gartner v Kidman Windeyer J relevantly stated:
"The propositions are general. Their application in a particular case may be affected by circumstances. They concern only surface waters, as distinct from the flow of natural watercourses to which riparian rights attach. And, for this purpose, surface waters do not include the waters of a stream or river which when periodically swollen in time of flood flows in a wider channel than ordinarily, the super-abundant waters following the general course of the stream but flowing outside its ordinary bed. Such "flood channels" are to be regarded as if they were part of the alveus of the stream. The law of natural watercourses applies, not that of surface waters... On the other hand waters that are the occasional overflow of lakes or ponds, not being part of a stream, are surface waters."[35] (defendants' emphasis)
(b) In Menzies v Breadalbane, which was cited with approval in Gartner v Kidman, the Court considered the riparian rights attaching to natural watercourses at common law and stated as follows:
"... a superior heritor cannot divert any part of a stream to the prejudice of an inferior heritor. It is also clear, that an inferior heritor cannot do that which shall cause the water to stagnate, to the prejudice of the superior; that is acknowledged to be clear law. But it is said, that applies only to the alveus of the course. But it does not appear to me, that there is any solid ground for the distinction. The ordinary course of the river, is that which it takes at ordinary times; there is also a flood channel: I am not talking of that which it takes in extraordinary or accidental floods, but the ordinary course of the river in the different seasons of the year, must, I apprehend, be subject to the same principle".[36]
(c) Further in Menzies v Breadalbane the Court concluded that:
"... the Respondent ought to be prohibited and interdicted from the further erection of any bulwark, or any other opus manufactum, upon the banks of the river Tay, which may have the effect of diverting the stream of the river in times of flood, from its accustomed course, and throwing the same upon the lands of the Appellant".[37]
(d) In Gales Holdings Pty Ltd v Tweed Shire Council[38] the Court affirmed Windeyer J in Gartner v Kidman and stated:
"[133] The flow of water can give rise to nuisance. There is a difference between the flow of surface waters and the flow of natural watercourses. Riparian rights attach to the flow of natural watercourses such as rivers or streams, but not to the flow of surface waters. The word "riparian" derives from the Latin ripa for riverbank. A riparian owner, being the proprietor of the land on the banks of a natural stream of running water, is entitled to enjoy, and is obliged to accept, the flow of water past the land. The law of natural watercourses, not surface waters, applies even to waters of a river flowing in a wider channel than usual, when the river is swollen in time of flood, even though they flow on land outside the riverbed while still following the river's general course. Such flood channels are treated as part of the alveus, or riverbed.
[134] A riparian owner can neither deprive those lower down the river of its flow, nor pen it back upon the lands of a neighbour higher up. Riparian rights and obligations are proprietary, being natural incidents of the ownership or lawful possession of the land abutting on the stream or river. They turn on who owns the riverbank, not the riverbed."
(a) The case concerned a drainage depression that carried rainfall run-off that flowed only in the wet season.
(b) Barwick CJ considered and applied the relevant definition of a watercourse as contained in local government legislation.
(c) Barwick CJ went on, in obiter dicta, to consider wider matters that are reflected in the quote relied upon by the plaintiffs.
(d) McTiernan J agreed with Barwick CJ. However, Kitto J expressly reserved his position about the distinction between a watercourse, creek, and river. Taylor and Owen JJ dissented.
Does the Gartner v Kidman "defence" apply in respect of the Temporary Levee?
"Although [the lower proprietor] has no action against the higher proprietor because of the natural unconcentrated flow of water from his land, he is not bound to receive it. He may put up barriers and pen it back, notwithstanding that doing so damages the upper proprietor's land, at all events if he uses reasonable care and skill and does no more than is reasonably necessary to protect his enjoyment of his own land. But he must not act for the purpose of injuring his neighbour. It is not possible to define what is reasonable or unreasonable in the abstract. Each case depends upon its own circumstances.
It may be added that the proprietor's right to defend his land against water coming upon it by erecting barriers, is generally speaking restricted to penning it back on to the higher land whence it would otherwise have naturally come. It does not entitle him to divert it on to the land of a third proprietor to which it would not have natural gone to the damage of that proprietor."[39] (plaintiffs' emphasis)
(a) By Muir J in Warne v Nolan [2001] QSC 53 at [84] and on appeal in Nolan v Warne [2001] QCA 537 at [13] (McPherson JA, Mackenzie and Mullins JJ agreeing).
(b) In Gales Holdings Pty Ltd v Tweed Shire Council [2013] NSWCA 382; (2013) 85 NSWLR 514 at [138] (Emmett JA, Leeming JA and Sackville AJA agreeing).
(a) contrary to the above finding, the water which flows over Mikandra and onto Riverview at the location of the Temporary Levee is surface water, whether natural or altered; or
(b) the Turn Back Defence applies in respect of a natural watercourse;
and the Turn Back Defence is available, then the following considerations arise.
(a) whether the plaintiffs had a purpose of "injuring [their] neighbour" or a malicious purpose for constructing the Temporary Levee;
(b) whether the plaintiffs used reasonable care and skill in constructing the Temporary Levee; and
(c) whether the plaintiffs did, and continue to do, no more than is reasonably necessary to protect their use and enjoyment of Riverview.
Whether the purpose was to injure their neighbour or a malicious purpose?
"But he must not act for the purpose of injuring his neighbour...".[40]
(a) the plaintiffs constructed the Temporary Levee in circumstances where they considered that works on Mikandra were adversely affecting flooding on Riverview; and
(b) the plaintiffs said that they were happy for the Temporary Levee to be removed once the works on Mikandra were removed.[41]
"... the lower proprietor is entitled a degree of defensive self-help. It can put up barriers and pen back even the natural, unconcentrated flow of water, as well as the altered flow. It can do so even if doing so damages the higher proprietor's land, so long as it uses reasonable care and skill and does no more than is reasonably necessary to protect the enjoyment of its lower land...".[42] (plaintiffs' emphasis)
"... the Temporary Levee does not cause water flowing in a northerly direction over Riverview to be blocked and to pool on Mikandra".
"... the plaintiffs built the Temporary Levee for the sole purpose of mitigating against the tortious conduct of the defendant[s] constituted by the Works".
Whether reasonable care and skill was used in constructing the Temporary Levee?
(a) The affidavit of the first plaintiff sworn 7 February 2023 [PLF.139.001.0005]:
(i) Construction commenced in about June 2013 and took about 6 months.
(ii) The design and construction of the Temporary Levee was based on expert advice from Mr Steven Hanlon.
(iii) Riverview suffered damage in the January and February 2013 flood events, including erosion, siltation and deposition of debris.
(iv) Mr Hanlon was an agricultural engineer with expertise in irrigation design and he provided advice to the plaintiffs.
(v) Mr Hanlon suggested the plaintiffs contact Mr Peter Watts of FSA Consulting Engineers to obtain advice "in relation to what measures [the plaintiffs] should put in place to limit future damage and what avenues of redress may be available to [the plaintiffs] to address the past flood events".
(vi) Mr Watts told the plaintiffs (as stated in the first defendant's affidavit and the exhibited email) that "certain approvals may have been required from Local Government".[45]
(vii) Mr Watts attended Riverview on 25 May 2013 and suggested that the plaintiffs should "construct an over-topping protection bank near the southern boundary of Riverview to try to slow and spread the flood water on the southern boundary of Riverview to mitigate against any future damage from flood events".
(viii) Mr Halon was then asked by the plaintiffs to design a protection bank on Block 9.
(ix) Mr Hanlon provided "verbal advice" to construct a levee of 600 mm in height with a minimum batter slope of 10:1.
(x) The plaintiffs followed the advice of Mr Hanlon and Mr Watts and constructed the Temporary Levee, resulting in the loss of about 3.7 hectares of irrigated land.
(xi) The construction of the Temporary Levee involved creating a drain near the Riverview boundary and using that dirt as the base of the Temporary Levee as well as dirt from other areas.
(xii) Mr Hanlon later surveyed the area of the Temporary Levee.
(b) The first affidavit of Brett Enkelmann sworn 7 February 2023 [PLF.139.001.0001], including:
(i) The Temporary Levee was a "flood mitigation measure".
"...in doing so he must not act recklessly of his neighbour so as to cause wanton damage to him".[47]
(a) The plaintiffs were concerned solely with their own position.
(b) No consideration was given to the impacts on Mikandra, or even the wider impacts on the use and enjoyment of Riverview (for example, the diminution in value).
(c) There was no detailed advice or design, including considerations of hydrology issues and impacts.
(d) Reasonable care and skill go beyond merely the earthworks to build a wall. It includes considerations of dimensions, structure and positioning so as not to cause "wanton" damage to neighbours and can only be to the extent reasonably necessary.[50]
Did the plaintiffs do no more than was reasonably necessary to protect their use and enjoyment of Riverview?
"In Hargrave v Goldman, Windeyer J said that, in essence, a nuisance could be defined as an "unlawful interference with a person's use or enjoyment of land, or of some right over, or in connexon with it". Not every use of a person's property which interferes with the use or enjoyment of other land is an unlawful interference. In general, an unlawful interference is an unreasonable interference with the use or enjoyment of other land. That criterion of reasonableness has been difficult to apply in some cases, but it is a necessary constraint on the operation of the tort which has been consistently recognised." [51]
"[t]he idea of reasonableness, that is basic to so much of the common law, is firmly embedded in the law of nuisance to-day. Pronouncements concerning the scope of nuisance as a tort avoid stating rights and duties as absolute. In respect of both what a man may do and what his neighbour must put up with, its criteria are related to the reasonable use of lands in question. In some recent cases there is perhaps a more explicit recognition than there was in some earlier cases that a landowner's duty to his neighbour qualifies his right to do what he likes with his own land and on his own land."[52] (emphasis added)
"... we want to pull it down as soon as we get some of those nuisance levees in Mikandra down. It's the whole reason we put it up."[55]
(a) contrary to the above finding, the water which flows over Mikandra and onto Riverview at the location of the Temporary Levee is surface water, whether natural or altered; or
(b) the Turn Back Defence applies in respect of a natural watercourse,
and the Turn Back Defence is available, I am not satisfied that the Turn Back Defence is established as the requisite elements discussed above have not be satisfied.
(a) What are the elements necessary to establish nuisance?
(b) Have the defendants established that the Temporary Levee caused a substantial and unreasonable interference with the defendants' use and enjoyment of Mikandra?
(c) Have the defendants established that the current Temporary Levee as modified by the 2023 Works caused a substantial and unreasonable interference with the defendants' use and enjoyment of Mikandra?
What are the elements necessary to establish nuisance?
"[t]he paramount problem in the law of nuisance is therefore to strike a tolerable balance between conflicting claims of neighbours, each involving the privilege to exploit the resources and enjoy the amenities of his property without undue subordination to the reciprocal interest of the other."[56]
"... the interference with the use of the claimant's land must exceed a minimum level of seriousness to justify the law's intervention".[58]
"Regard must be had to the character of the locality in which the inconvenience is created and the standard of comfort that those in the locality may reasonably expect. The reasonable use of land may occasionally cause annoyance about which neighbours cannot reasonably complain ... In considering whether an inconvenience is unreasonable, allowance must be made for reasonable give and take...".[60]
"'Reasonableness' .. is a two-sided affair. It is viewed not only from the standpoint of the defendant's convenience, but must also take into account the interest of the surrounding occupiers. It is not enough to ask: is the defendant using his property in what would be a reasonable manner if he had no neighbour? The question is, is he using it reasonably, having regard to the fact that he has a neighbour?"[61]
"... To constitute a nuisance, the interference must be unreasonable. In making that judgment, regard is had to a variety of factors, including: the nature and extent of the harm or interference; the social or public interest value in the defendant's activity; the hypersensitivity (if any) of the user or use of the claimant's land; the nature of established uses in the locality (eg residential, industrial, rural); whether all reasonable precautions were taken to minimise any interference; and the type of damage suffered.
This exercise involves weighing the respective rights of the parties in the use of their land to make a value judgment as to whether the interference is unreasonable. Although the "fault" of the defendant may be a relevant consideration in an assessment of whether the interference with the claimant's enjoyment of land is unreasonable, the duty not to expose one's neighbour to nuisance is not necessarily discharged by the exercise of reasonable care. Liability in nuisance is strict. Once a prima facie case has been established, it is for the defendant to prove its defence". [62]
"[t]his requirement is satisfied for private nuisance by establishing the undue interference with the use and enjoyment of the land. That includes physical damage to the land itself and damage to buildings or vegetation growing on the land. But commonly there will be an undue interference with the use and enjoyment of land - as by impact of noise or smell or smoke or vibrations or, as in Fearn, being overlooked - even though there is no physical damage to the land or buildings or vegetation".[63]
"The lower proprietor: he may recover damages from, or in appropriate cases obtain an injunction against, the proprietor of the higher land who is, for any of the reasons given above, liable to an action because he has concentrated or altered the natural flow".[64]
"[The higher proprietor] is not liable merely because surface water flows naturally from his land on to the lower land.
He may be liable if such water is caused to flow in a more concentrated form than it naturally would.
It flows in a more concentrated form than it naturally would if, by the discernible work of man, the levels or conformations of land have been altered, and as a result the flow of surface water is increased at any particular point".[65]
"In a rural community, particularly on a flood plain, the normal operation and management of a farm has the potential to adversely affect a neighbour's enjoyment of his or her property. In accordance with the principles of law discussed earlier, the fact that something on or done on one property has an effect on an adjoining property does not necessarily give rise to a cause of action.
Putting it broadly, any interference with the Nolans' enjoyment of Corella resulting from the levee bank in its degraded state is within the range of those matters which in a rural community one neighbour ought be expected to tolerate from another. I am, of course, referring to the impact of the degraded levee bank at times after the Nolans gave notice that its presence was unacceptable to them and after Mrs Warne had had a reasonable time within which to consider the complaint and take action if necessary".[72]
Have the defendants established that the Temporary Levee caused a substantial and unreasonable interference with the defendants' use and enjoyment of Mikandra?
(a) The evidence of the first defendant does not establish a substantial interference with Mikandra.
(b) The evidence of Dr Markar:
(i) taken at its highest, does no more than establish that the Temporary Levee caused increases in both velocities and peak flood levels; and
(ii) is subject to question in respect of its precision on those issues.
(a) The Temporary Levee does block waterflow.
(b) There is no purpose for the Temporary Levee to be there other than to block water, particularly where the arable land on Riverview is reduced as a result of the Temporary Levee.
(c) The expert evidence in the Third Markar Report [DEF.014.001.0004] shows that the Temporary Levee causes water to back up onto Mikandra and damage crops.[74]
(d) The Temporary Levee creates increases in velocity along the southern side of the Temporary Levee.
(e) The Temporary Levee is perpendicular to and directly in the path of Barambah Creek water flows which pass through the Lagoon and gully onto Riverview.
(f) The Temporary Levee has the effect of blocking water unless and until it is overtopped.
(a) Dr Markar. He was an objective, careful and considered expert who gave his opinions in a measured and persuasive manner. He was able to explain his methodology and approach. The fact that there were various iterations and refinements of his modelling is not something that impacts on his credibility. If anything, this strengthens his credibility as he was open to making adjustments as the issues unfolded and developed, but also was able to provide an explanation for doing so.
(b) Professor Bennett.
"[79] It is incredible for the [plaintiffs] to submit,[75] as they do, that the changes which Dr Markar models in his Third Report [DEF.014.001.0004][76] over a broad area which includes farmed land do not constitute a nuisance when the [plaintiffs] maintained until the very last moment that an increase in water flows at RP1 (and only that point of non-farmed land on the border of Riverview) of very small amounts, and on parts of Riverview as low as 0.05m/s,[77] constituted a nuisance which entitled them to injunctive relief and damages.
[80] Equally, it is rich for the [plaintiffs] to submit, as they do ... that the erosion threshold velocity could fall within a broad range, such that it can be of no assistance to the [defendants] in their Counterclaim. That is the precise opposite of the case which the [plaintiffs] propounded for several years, which relied entirely on a specific erosion threshold velocity being accepted at all locations and in all food events over 23 years".[78]
(a) The First Affidavit of the first defendant [DEF.014.001.0013] deals with the March 2017 rain event (which is relevantly after the construction of the Temporary Levee) at [402] to [404]. In summary, this evidence establishes that the water was banking up from the Temporary Levee onto Mikandra and there was damage to Blocks 1 and 2 on Mikandra in the nature of siltation on cotton and siltation in drains.
(b) The First Affidavit of the first defendant [DEF.014.001.0013] deals with the First and Second November 2021 flood events at [408] to [409]. In summary, this evidence establishes that the water was banking up from the Temporary Levee onto Mikandra during those flood events. The first defendant's evidence at [408(c)] relevantly is that:
"... once the water passed through the Lagoon it met with the Temporary Levee on Riverview. The Temporary Levee prevented the water from travelling in the normal flow path and instead water began back filling and pooling on Block 1 and Block 2 on Mikandra".
(c) The series of photographs exhibited to the First Affidavit show the progression of the flood events. These include:
(i) Still photographs showing water backed up into the cotton cropping rows on Mikandra, with the Temporary Levee located between Mikandra and Riverview: [DEF.010.001.1198], [DEF.010.001.1202] and [DEF.010.001.1219].
(ii) Drone photographs taken later on the same day showing water backed up on Mikandra: [DEF.010.001.1244] and [DEF.010.001.1246]. The defendants submit that these photographs also show that the water level in the Below Ground Waterway is at the same level as the water level on Mikandra. It is submitted that this is understandable as the Temporary Levee constrains the Below Ground Waterway.
(iii) Images from the opposing angle showing the same effect: [DEF.010.001.1215] and [DEF.010.001.1253].
(iv) Further images from an angle more directly above the backed up water on Mikandra: [DEF.010.001.1282] and [DEF.010.001.1134].
(d) The photographs are consistent with the evidence of the first defendant.
(e) The First Affidavit of the first defendant [DEF.014.001.0013] deals with the January 2022 flood event at [410] to [418]. The first defendant's evidence [412(c)] relevantly is that:
"... once the water passed through the Lagoon it met with the Temporary Levee on Riverview. The Temporary Levee initially prevented the water from travelling in the normal flow path and instead the water began back filling and pooling on Block 1 and Block 2 on Mikandra; however, the Temporary Levee then failed and overtopped".
(f) The series of photographs exhibited to the First Affidavit show the progression of the flood event. These include:
(i) A photograph from a drone which shows a significant volume of water present at or around the time that the Temporary Levee was overtopped: [DEF.010.001.0672]. The first defendant's evidence is that the water shown in this photograph backed up behind the Temporary Levee about 250 metres into Block 2 and 200 metres into Block 1 on Mikandra. The first defendant estimated the distances based on him stepping out the distances after the water had receded.
(ii) The defendants submit that this photograph also shows the direction of the flow - in effect in a straight line - from Barambah Creek, through the Lagoon, over Riverview and beyond. That is, once the water level had reached the top of the Temporary Levee and overflowed the Temporary Levee, the water returned to the natural flow path. Up until that point, the water had been redirected back onto and pooled on Mikandra.
(iii) Photographs taken on 9 January 2022 showing the water overtopping the Temporary Levee and the water flows during the progression of the flood event: [DEF.006.001.0165], [DEF.006.001.0167], [DEF.006.001.0165], [DEF.010.001.0064], [DEF.010.001.0646], [DEF.010.001.0649], [DEF.010.001.0650], [DEF.010.001.0652], [DEF.010.001.0654], [DEF.010.001.0662], [DEF.010.001.0677], [DEF.010.001.0680], [DEF.010.001.0683], [DEF.010.001.0786], [DEF.010.001.0692], [[DEF.010.001.0693], [DEF.010.001.0700], [DEF.010.001.0725], [DEF.010.001.0731], [DEF.010.001.0777] and [DEF.010.001.0753].
(iv) Photographs taken on 14 January 2022, which show the damage on Mikandra, including the absence of foliage on crops on Mikandra which were destroyed by water backed up onto Mikandra: [DEF.010.001.0515], [DEF.010.001.0518] and [DEF.010.001.0521] by way of example.
(g) The photographs are consistent with the evidence of the first defendant, including the further evidence by the first defendant as to what can be seen in the photographs.
(h) In cross-examination in respect of the photograph taken on 14 January 2022 [DEF.010.001.0555], the first defendant explained that in the photographs the backed-up water was not visible at all points under the crop and he gave evidence of the area where the silt was dropped. Further in re-examination, the first defendant explained how he estimated the extent of the backing up of the water by walking the affected area.
(a) Dr Markar's opinion is that the modelling shows that the effect of the Temporary Levee on Mikandra is significant.
(b) I accept the evidence of Dr Markar in each of the First Markar Report [DEF.012.001.1502], the Second Markar Report [DEF.012.001.1503], the Third Markar Report [DEF.014.001.0004], the Fourth Markar Report [DEF.020.001.0022] and the Fifth Markar Report [DEF.998.001.0001]. As explained above, it is necessary to have regard to all of the reports to understand the development of the modelling and also the evolution of the issues being addressed. In respect of the various reports and modelling, the "post-works" conditions reflect the "on the ground" actual conditions of Mikandra.[80]
(c) In respect of the Third Markar Report:
(i) At [215], Dr Markar expresses his opinion that:
"The Riverview flood mitigation embankment has significantly altered predicted peak water levels and velocities on both Mikandra and Riverview and has caused significant adverse flood impacts on Mikandra:
(ii) At [215], Dr Markar states his further opinion in respect of the February 2022 flood event that:
"... the predicted adverse impacts on Riverview at its southwest corner ... are in fact due to the Riverview flood mitigation embankment".[81]
This shows that the Temporary Levee has an adverse impact on Riverview as well as Mikandra.
(iii) Dr Markar calculated the "change in peak velocities" on Mikandra to analyse the effect of the Temporary Levee. This analysis is shown in several Figures in the Third Markar Report, including:
- (A) Figure 6-3: Predicted change in peak velocities and flood levels under post-works conditions, with and without the Riverview flood mitigation embankment, December 2010 flood event.
- (B) Figure 6-6: Predicted change in peak velocities and flood levels under post-works conditions, with and without the Riverview flood mitigation embankment, January 2011 flood event.
- (C) Figure 6-9: Predicted change in peak velocities and flood levels under post-works conditions, with and without the Riverview flood mitigation embankment, January 2013 flood event.
- (D) Figure 6-12: Predicted change in peak velocities and flood levels under post-works conditions, with and without the Riverview flood mitigation embankment, February 2013 flood event.
- (E) Figure 6-15: Predicted change in peak velocities under post-works conditions, with and without the Riverview flood mitigation embankment, January 2022 flood event.
- (F) Figure 6-19: Predicted change in peak velocities under post-works conditions, with and without the Riverview flood mitigation embankment, February 2022 flood event.
(iv) In respect of the impacts of the Temporary Levee, Dr Markar states:
"[223] For the six historical flood events investigated in this report, Mikandra Works had no material adverse flood velocity, discharge or level impacts on Riverview in the absence of the Riverview flood mitigation embankment. However, unlike the Mikandra works, the Riverview flood mitigation embankment has an adverse impact on predicted flood levels and velocities on Mikandra.
[224] The 2022a LiDAR data shows that since the February 2022 event, the Riverview flood mitigation embankment has been further raised, by up to about 1 meter in places. In my opinion, these additional works will result in further adverse flood impacts on Mikandra beyond what are shown in the updated Markar modelling results."
"[300] The previous Markar Reports found that for the above four historical flood events, Mikandra Works would have no adverse flood discharge or level impacts on Riverview in the absence of the Riverview flood mitigation embankment. However, the flood mitigation embankment on Riverview would have a material impact on peak flood levels in the northern portion of Mikandra due to the flow obstruction caused by the Riverview flood mitigation embankment for moderate flood events similar to December 2010 and February 2013. This impact would diminish for large flood events similar to the January 2011 and January 2013 events when the Riverview flood mitigation embankment is overtopped.
[301] The previous Markar Reports also found that the flood mitigation levee constructed in Riverview would cause adverse flooding impacts on Mikandra during future moderate flood events similar to the December 2010 and February 2013 events. During future large flood events similar to the January 2011 and January 2013 events, these adverse impacts would diminish with increasing flood discharges when the Riverview flood mitigation levee is overtopped."
(vi) In addition, Dr Markar updated the hydraulic modelling taking into account additional information and concluded to a similar effect as outlined above:
"[310] The updated Markar model shows that, for the six historical flood events investigated in this report, Mikandra Works had no material impacts on flood velocity, discharge or level on Riverview in the absence of the Riverview flood mitigation embankment. However, unlike the Mikandra works, the Riverview flood mitigation embankment has an adverse impact on predicted flood levels and velocities in Mikandra.
[311] The 2022a LiDAR data shows that since the February 2022 event, the Riverview flood mitigation embankment has been further raised, by up to about 1 meter in places. In my opinion, these additional works will result in further adverse flood impacts on Mikandra beyond what are shown in the updated Markar modelling results."
(vii) Dr Markar also expressly models the change in peak velocity caused by the Temporary Levee, the result of which can be seen in the Figures in the Third Report, including:
- (A) Figure B-36: Predicted change in peak velocities and flood levels under post-works conditions, with and without Riverview flood mitigation embankment, December 2010 event.
- (B) Figure B-43: Predicted change in peak velocities and flood levels, post-works conditions, with and without Riverview flood mitigation embankment, January 2011 event.
- (C) Figure B-50: Predicted change in peak velocities and flood levels, post-works conditions, with and without Riverview flood mitigation embankment, January 2013 event.
- (D) Figure B-57: Predicted change in peak velocities and flood levels, post-works conditions, with and without Riverview flood mitigation embankment, February 2013 event.
- (E) Figure B-63: Predicted change in peak velocities, post-works conditions, with and without Riverview flood mitigation embankment, January 2022 event.
- (F) Figure B-64: Predicted change in peak flood levels, post-works conditions, with and without Riverview flood mitigation embankment, January 2022 event.
- (G) Figure B-70: Predicted change in peak velocities, post-works conditions, with and without Riverview flood mitigation embankment, February 2022 event.
- (H) Figure B-71: Predicted change in peak flood levels, post-works conditions, with and without Riverview flood mitigation embankment, February 2022 event.
(viii) In respect of the impacts of the Temporary Levee, Dr Markar concludes:
"[596] The model results show that, unlike the Mikandra Works, the Riverview flood mitigation embankment has a significant impact on predicted flood levels and velocities on both Mikandra and Riverview.
[597] Consistent with the findings of the original Markar modelling, model results show that the Riverview flood mitigation embankment has significant adverse impacts on flooding at Mikandra Blocks.
[598] The 2022a LiDAR data shows that since the February 2022 event, the Riverview flood mitigation embankment has been further raised, by up to about 1 meter in places. In my opinion, these additional works will result in further adverse impacts to flooding on Mikandra beyond what the updated Markar modelling results show."
(d) Dr Markar also gave oral evidence consistent with the opinions expressed in his reports, including in cross-examination as follows:
(i) " ... is it correct to say that you can think of the levee having an effect in terms of backing up water whist the water level remains below the top surface of the levee, but once the water gets above the top surface of the levee, you will have the same amount of water backing up into Mikandra whether or not the levee is there? Correct. Yes.
Is that correct? Yeah. It's not only the backing up of water. It is also the redistribution, re - redirecting of water away from the western part of - sorry, eastern part of Riverview and into the western part of Riverview through where the gully is. So there are two impacts: one is the levee would back up and slow down and redirect water the other way, and ... once it's overwhelmed, that impact dissipates."[82]
(ii) As to the effect of blocking and redirecting water:
"So that's heading west over into - ... towards the western boundary of Riverview; is that right? ‑‑Yeah. ....
And - all right. I understand that?-‑‑So you're basically blocking it here and forcing it to go - - - All right. But if you were to continue that path, am I correct to say that it will continue over towards the west into that next property above the other part of Mikandra; is that right? ...As I understand it - correct me if I'm wrong - you're saying that apart from the effect that the temporary bank has in pushing the water back, it also has an effect in redirecting the water; correct?‑‑‑Yeah. ... And you're representing, with the yellow line, where the water is redirected -Yep. - - - by the temporary bank; correct?‑‑‑That - that is, very roughly. After that, once it gets here, it will find its own way depending on the lay of the land.
All right?‑‑‑So ... some of it will go that way, that way, sort of. And once it's - comes here, they will also join and go in the same - same direction, so north-west, one body of water. Understood.
HER HONOUR: So can I ask you: so the yellow line, you're saying it pushes it to the west?‑‑‑Yeah. But once it overtops the levee it might go towards that more central line that you've got on the - it will go ... wherever depending ... on the lay of the land. Yeah."[83]
"Now, sir, it's correct to say, then, that on this modelling, you also showed that the Riverview levee would not cause a significant adverse impact on Mikandra during a large future flood event, similar to the January 2013 event. Can I ask you this, when you talk about impacts, what do you mean?‑‑‑I have spoken about the imp - in here, the impact on peak water level - peak flood level. And then also the peak velocities. ...
Now, you say they are based on the hydraulic model results for the February 2013 flood event, .... The adverse impacts that you identify there are, first of all, peak flood levels and extents; correct?‑‑‑Correct.
And by extent, you mean the area under flood water; is that right?‑‑‑No. The extent - I mean there is the area where it's been im - extent of the area impacted. In other words, if the flood level was at X, it's gone to Y. It's a difference between with and without the mitigation - - -
Yeah? ... So you're saying that's a larger area which has been impacted. Where - the area which has a higher flood level - higher peak flood level due to the mitigation levee.
Let me just see if I can understand that. Is it correct to say that when you talk about the peak increasing, the extent also increases because as the water level rises, it extends - the water covers a greater area in the field; is that - - -?‑‑‑Correct."[84]
(a) Professor Bennett in cross-examination gave evidence that in his opinion the Temporary Levee altered the flow of water and blocked the natural water course:
"And your view, as I understand it, in your report, is that you can't find any structures on Mikandra or Riverview that really alter the flow of water very much at all; correct?‑‑‑There's structures on Riverview that certainly alter the flow of water.
By that - I should be more careful. We use a lot of different labels for the same thing in this case. ... Just looking at that map, you're referring to - you can see the southwest corner of the red property, block 9? You see that?‑‑‑Yes.
And is that the locality where you're talking about a structure on Riverview?‑‑‑Insofar as a structure, I mean that's one of the structures that unsuccessfully attempts to - - - All right?‑‑‑ - - - you now, move - protect the land from water. But, no. I'm more specifically referring to the diversion of the channel around 1993.
.... And you said a moment ago that there aren't any structures on Riverview that alter the water course at all. Is that your opinion? Sorry, in Mikandra, I mean?‑‑‑My opinion is that the flow-line through which the water moves is natural. That's my opinion."[85]
(b) Further, Professor Bennett gave evidence in respect of the potential for erosion given the nature of the soils and that they may "detach" at low velocities.[86]
(c) Professor Bennett annotated a map showing the watercourse in the February 2022 flood event which shows the Temporary Levee in the flow path of the water [EXH.002.001.0001].
Have the defendants established that the Temporary Levee as modified by the 2023 Works caused a substantial and unreasonable interference with the defendants use and enjoyment of Mikandra?
(a) The evidence of Dr Markar in the Fifth Markar Report [DEF.998.001.0001] in respect of the changes to the Temporary Levee, including relevantly:
(i) Between 2022 and 2024 as illustrated in Figure 3-6: Difference grid, 2024 LiDAR - 2022a Lidar.
(ii) Between 2012 and 2024 survey data as illustrated in Figure 3-4: Difference grid, 2024 LiDAR - 2012 Survey.
(iii) Figure 3-7: Cross-section at A0, which graphs the changes at this point over the various datasets.
(iv) Figure 3-12: Cross-section E1, which also graphs this point over time over the various datasets. I note that this point corresponds with "RP1" which was the subject of considerable analysis in respect of the plaintiffs' original claim.[90]
(v) His opinion in respect of the potential impacts of the current Temporary Levee on Mikandra:
"[25] Due to time constraints, I have not undertaken any new hydraulic modelling to assess the potential impact of the current configuration of the Riverview Flood Mitigation Embankment on flooding at Mikandra. Therefore, the opinions expressed below are based on results and findings from the modelling undertaken and presented in the Third Markar Report (Markar, 2023).
[26] Markar (2023) modelling showed that the 2020 configuration of the Riverview Flood Mitigation Embankment had an adverse impact on flood levels and velocities on Mikandra, mainly in Block 1 and Block 2, and that these impacts are greater for more regular and smaller flood events.
[27] The comparison of the current (2024) topographic configuration of the Riverview Flood Mitigation Embankment and the surrounding area with the 2020 configuration shows that the eastern end of the 2024 embankment is slightly (up to 0.2 m) higher than the 2020 embankment assessed in Markar (2023).
[28] Based on the previous modelling results, I believe the small increase in the embankment height in 2024 when compared to 2020 is likely to slightly increase the adverse impact on flood levels and velocities on Mikandra predicted in Markar (2023). It is not possible to estimate the magnitude of this incremental impact without undertaking hydraulic modelling for the current embankment configuration."
(b) The evidence of Dr Markar in cross-examination was that the further work done in 2023 did not in any appreciable way change the impact of the Temporary Levee:
"Do you remain of the opinion today, with the structure of a mitigation bank as it is today, of the opinion that that will be the general direction in which water is redirected from it?‑‑‑Based on the latest survey data I received a few weeks ago - that's the - that data shows that the mitigation [levee] has been raised compared to 2020. So, therefore, the impact for the smaller floods that doesn't over top is prob - it - impact will be there for a bigger flood than what was there before.
All right. Just pausing there, the question I asked you was about redirection of the water?‑‑‑Yeah. It's the same principle.
Yes. So, really, what you're saying is that redirection is likely to be a factor in those circumstances for a much larger flood peak than before; is that right?‑‑‑Correct.
But we're not talking about the direction being changed in any appreciable way because of the modifications to the temporary bank, or the mitigation bank?‑‑‑No."[91]
(c) The evidence of Alistair Byrom, in particular the Fourth Byrom Report [DEF.998.001.0073] dated 25 March 2024 which considered the works undertaken in 2023 in respect of the Temporary Levee and analysed the available survey data.
(a) That soil had been placed behind (to the north of) the eastern part of the Temporary Levee. However, the areas in front of and behind the western part of the Temporary Levee had been lowered.
(b) The main body of the Temporary Levee seemed to have retained the same height, but the bank had been built up and strengthened (at approximately the point previously identified as RP1).
(c) The area around RP1 appeared to be higher and further to the north.
(a) In 2023 the plaintiffs undertook further works that altered to some extent the Temporary Levee, including raising, lowering, and broadening the structure in different areas.
(b) The changes made in 2023 did not "dramatically" change the Temporary Levee.
(c) The impacts on Mikandra that result from the Temporary Levee being an elevated structure in the flow path of the break out water from Barambah Creek are not diminished or lessened as a result of the works done by the plaintiffs in 2023.
If so, should an injunction be granted requiring the plaintiffs to remove the Temporary Levee?
(a) There is no farming or irrigation reason for the plaintiffs to retain the Temporary Levee.
(b) There is evidence that the Temporary Levee is detrimental to Riverview.
(c) No rational reason for the maintenance of the Temporary Levee has been identified.
[1] Lots 1, 3, 4 and 6 on RP27650 and Lot 69 and 72 on RP27647.
[2] Lots 25, 26, 35, 36 and 47 on RP27645, as trustee under various trust investments.
[3] The defendants put potential non-parties on notice.
[4] Particulars omitted. Consistent with the particulars to [94(e)] above.
[6] At [48(f)], [53(f)], [53A(c)], [59(b)(iii)], [59A(a)] and [94(e)(ii)] of the Amended Defence and Counterclaim.
[7] At [87] of the Amended Defence and Counterclaim.
[8] "Irrigation Infrastructure" is defined at [6(a)] of the Amended Defence and Counterclaim, which is the admitted works undertaken on Mikandra.
[9] At [94(d)(i)] of the Amended Defence and Counterclaim.
[10] See [99] and [107] onwards of the Amended Defence and Counterclaim.
[11] The Fifth Markar Report identifies this as the "Area of Interest": [DEF.998.001.0001].
[13] The plaintiffs' plea is linked back to the "Works" which is all of the works that the plaintiffs allege were done by the defendants on Mikandra. As a result of the abandonment of the plaintiffs' claim, it is no longer alleged that these "Works" were done.
[14] The reference was [77(a)] but in oral submissions it was conceded the reference should be to [75(a)]: T27 - 29 line 12 - 15.
[15] T27 - 29 line 49 to T27 - 30 line 14.
[17] [DEF.014.001.0004] at [.0055] to [.0082].
[18] Referred to in the submissions as the Protection Bank.
[22] [1962] HCA 27; (1962) 108 CLR 12 at 49.
[23] [2013] NSWCA 382; (2013) 85 NSWLR 514 at [133] to [136] (Emmett JA, Leeming JA and Sackville AJA agreeing).
[24] T27-23 line 43 and 48 to T27 - 24 line 1-46.
[25] [13(c)] of the Amended Defence and Counterclaim.
[26] [13(e)] of the Amended Defence and Counterclaim.
[27] [13A(a)] of the Amended Defence and Counterclaim.
[28] [13A(b)] of the Amended Defence and Counterclaim.
[29] [13A(c)] of the Amended Defence and Counterclaim.
[30] [13A(d)] of the Amended Defence and Counterclaim.
[31] Sanrus Pty Ltd v Monto Coal 2 Pty Ltd (No 5) [2019] QSC 210 at [46]- [49].
[34] Ibid 475 (per Barwick CJ, McTiernan and Kitto JJ agreeing).
[35] [1962] HCA 27; (1962) 108 CLR 12, at 47-48.
[36] (1828) 3 Bligh NS 414 (4 ER 1387) at [418].
[39] [1962] HCA 27; (1962) 108 CLR 12, at 49. Dixon CJ agreeing.
[40] [1962] HCA 27; (1962) 108 CLR 12, at 49.
[41] At [21] of the Plaintiffs' Written Submissions in Reply dated 3 September 2024.
[42] [2013] NSWCA 382; (2013) 85 NSWLR 514 at [136]. Leeming JA and Sackville AJA agreeing.
[43] Nor evidence of "mitigation" justifying the continuation of the Temporary Levee.
[44] The defendants referred to the Court of Appeal decision in Nolan v Warne [2001] QCA 537 as an example of where circumstances change and a levee was ultimately removed, but there was no allegation that the removal was past a point such that it was malicious.
[45] The email was not admitted in evidence as truth of its contents. It is evidence that the plaintiffs were told and that is relevant to their state of mind.
[46] (1971) 1 SASR 359 at 364.
[47] [1962] HCA 27; (1962) 108 CLR 12 at 46.
[49] Although the email from FSA is not admissible for the proof of its contents.
[50] On this last point, see further discussion under the next heading.
[52] Gartner v Kidman [1962] HCA 27; (1962) 108 CLR 12 at 47.
[53] The alleged harm to Mikandra is considered further below.
[54] This is discussed further below in relation to nuisance.
[56] Carolyn Sappideen and Prue Vines, Fleming's The Law of Torts (Thomson Reuters, 10th ed, 2011) at p 500.
[58] [2023] UKSC 4; [2024] AC 1 at [22].
[59] [2001] QSC 53 at [89].
[60] [2013] NSWCA 382; (2013) 85 NSWLR 514 at [138] (Leeming JA and Sackville AJA agreeing).
[61] Carolyn Sappideen and Prue Vines, Fleming's The Law of Torts (Thomson Reuters, 10th ed, 2011) at p 500.
[62] [2012] WASCA 79; (2012) 42 WAR 287 at [118] to [119].
[63] [2024] AC 595 at 608 [3].
[64] [1962] HCA 27; (1962) 108 CLR 12 at 49.
[66] Muir J at first instance: [2001] QSC 53. On appeal Nolan v Warne [2001] QCA 537, McPherson JA, Mackenzie and Mullins JJ agreeing.
[67] [2001] QSC 53 at [64].
[68] Sedeleigh-Denfield v O'Callaghan [1940] UKHL 2; [1940] AC 880 at 904-5.
[70] Warne v Nolan [2001] QSC 53 at [94].
[75] Paragraphs 8(b) and 9 of the plaintiff's submissions [PLF.008.019.0001].
[76] See paragraphs [215], Figure 6-19, paragraph [233] and Figure B-36, B-43, B-50, B-57, B-63 and B-70.
[77] See from paragraph [364] of the plaintiffs' written submissions [PLF.008.019.0001].
[78] Defendants' Reply Submissions [DEF.997.001.0045].
[79] T19-29 line 30 - 49 to T19-30 line 1 - 9.
[81] The "flood mitigation embankment" being the Temporary Levee.
[82] T21-60 line 21 - 48, irrelevant parts omitted
[83] T21-62 line 11 to T21-63 line 1, irrelevant parts omitted.
[84] T21-64 line 30 to T21-65 line 9, irrelevant parts omitted.
[85] T16-99 lines 1 to 26, irrelevant parts omitted.
[86] T16-108 lines 15 - 17 and T16 -101 lines 26 - 31.
[87] Being both Mr Giles and Dr Markar.
[88] At [41] and [70] of the plaintiffs' closing written submissions [PLF.008.019.0001].
[89] T3-59 line 45 - 50; T3-60 line 2; T3-60 line 16; T3-60 line 22 - 29; T3-60 line 35 - 47; T3-61 line 8; T14-51 line 15 - 18; T14-51 line 16.
[90] "RP1" was pleaded by the plaintiffs in the 4FASOC as a reference point in the modelling undertaken by Mr Giles. "RP1" was central to Mr Giles' comparison of the "Pre-Works" and "Post-Works" water behaviours. While this case has now been abandoned, "RP1" remains a reference point in the other admissible evidence. "RP1" is on the boundary of Mikandra and Riverview where the "Channel" meets the "Below Ground Waterway".
Enkelmann & Ors
Stewart & Anor [2025] QSC 77
(2013) 85 NSWLR 514
(1962) 108 CLR 12
(1968) 118 CLR 468
(1971) 1 SASR 359
(2012) 42 WAR 287
(c) Mikandra and Riverview are located in the larger catchment that generally feeds downstream to the alluvial floodplain northwest of Murgon, which is variously described as the "Byee/Wheatlands floodplain", the "Byee-Wheatlands-Mondure floodplain" or the "Byee floodplain" as shown in [DEF.001.001.0052], [DEF.004.001.0655_0008] and [DEF.004.002.0043_0006].
(d) The topography of Barambah Creek and the surrounding area affects the "behaviour" of the floodplain. See [DEF.004.002.0043_0006] and [DEF.001.001.0052_0007-0010].
(e) Further, the floodplain drains generally north along both of the banks of Barambah Creek, through what are described as gullies and levee backswamps. See [DEF.004.002.0043_0028].
(f) The Lagoon referred to on the pleadings is a natural lagoon which is the confluence of two gullies, with local runoff and floodplain flows converging. It is located on the west bank of Barambah Creek.
(g) The Lagoon constricts the flow path, which concentrates and intensifies waterflows. See [DEF.014.001.0005_0010, 0014, 0015, 0017, 0025, 0030, 0037]. This is also shown in the GHD Report at [DEF.004.001.0655_0057,0060, 0063].
(h) I accept the evidence of Professor Bennett, in his report [DEF.014.001.0005] and his evidence at trial. In particular:
(i) The floodwater flows through the Lagoon, through Mikandra and into Riverview.
(ii) The historical flow path is a corridor being an extension of Barambah Creek and its tributary gullies. The tributaries feed into and form part of the creek.
(iii) The analysis of the aerial photographs and Professor Bennett's annotations of the aerial photographs in his oral evidence at trial in respect of the flow of water from the upstream reaches of Barambah Creek.
(i) I accept the evidence of Mr Byrom, including the evidence contained in his report [DEF.012.001.1504] and his depiction of the gullies and stream network in the area of Mikandra and Riverview at [DEF.012.001.1504_0049] and the topography of Mikandra in [DEF.014.001.0027].
(ii) At the same time as building the Temporary Levee, a drain was built as part of the mitigation. The drain was built to "help draw the water down the below Ground Waterway on the southern side" of the Temporary Levee.
(iii) The Temporary Levee was designed "to allow water to feed around behind it and then to overtop the [Temporary Levee] in larger flows of floodwater, with the effect of spreading and slowing the water flow".
(c) The affidavit of Steven Hanlon [PLF.139.001.0008]:
(i) Mr Hanlon suggested that the plaintiffs build "a temporary protection bank" to try to "prevent the worst of the effects of future floods".
(ii) He suggested that it be built in the same location as "the old, raised strip ... about one metre above the natural surface with an extended base and a flatter batter at the northern side".
(iii) The Temporary Levee was "not designed to be a permanent fix to stop all future damage likely to result from the flood waters coming from Mikandra ... it was designed by [him] to head off the worst of the effects of future flood waters until such time as a better and more permanent solution could be reached about controlling flood waters in the area".
(iv) Mr Hanlon was not well at the time and recommended that the plaintiffs approach Peter Watts at FSA Consulting Engineers to assist them "further with any farm design work".
(v) Mr Hanlon visited "in the years since 2013" and saw the Temporary Levee had been built but he was "not involved in its construction".
(i) Paragraph [413] of the First Affidavit of the first defendant [DEF.014.001.0013] identifies the damage suffered in the January 2022 flood event including:
(i) loss of topsoil;
(ii) erosion on the eastern boundary of Block 1 and the western boundary of Block 2;
(iii) "the tail drains on Block 1 and Block 2 were eroded and silted up";
(iv) "the water backed up into the cotton and we lost 24 hectares of cotton on Block 2 and 10 hectares of cotton on Block 1 which went under water";
(v) "the remaining cotton was silted up to approximately ¾ of the way up the plant the ground (sic) which caused siltation of the cotton and the bolls to be unpickable";
(vi) some reduction in the quality of the cotton; and
(vii) deposits of rubbish in Block 2 which flattened the cotton in that area.
(j) The First Affidavit of the first defendant [DEF.014.001.0013] deals with the February 2022 flood event at [421]. The evidence of the first defendant is that Mikandra suffered damage due to the February 2022 flood event, including:
(i) loss of topsoil;
(ii) erosion on the eastern boundary of Block 1 and the western boundary of Block 2;
(iii) "the tail drains on Block 1 and Block 2 were eroded and silted up";
(iv) "the water backed up into the cotton and we lost 24 hectares of cotton on Block 2 and 10 hectares of cotton on Block 1 which went under water"; and
(v) "the remaining cotton was silted up to ...approximately 15 nodes from the ground in Block 2 and up to approximately 12 nodes from the ground which caused us to lose those cotton bulbs due to boll rot".
(k) The damage suffered in the February 2022 flood event was similar to the damage suffered in the January 2022 flood event.