[2012] VCAT 308
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2012-03-29
Original judgment source is linked above.
(Note: Not all named advocates appeared on all listed hearing days.)
Simon Molesworth QC and David Deller of counsel, instructed by Corrs Chambers Westgarth.
The EPA also tendered a report by James Nancarrow, EPA, on acoustic issues but (by agreement) he was not called to give evidence.
Stuart Morris QC and Barnaby Chessell of counsel, instructed by Maddocks.
Dual Gas also tendered a report by Dr Norm Broner, SKM, on acoustic issues but (by agreement) he was not called to give evidence.
Environment Victoria and Locals Into Victoria's Environment Inc.
Adrian Finanzio, Rupert Watters and Emma Peppler of counsel, and Felicity Milner, solicitor, instructed by the Environment Defenders Office.
Matthew Townsend and Jane Treleaven of counsel, instructed by Maurice Blackburn.
Air Quality Control Region (established under the SEPP(AQM))
Climate Change Act 2010 (Vic)
Contract for Closure - proposed Australian government initiative to close up to 2,000 MW of high GEI generation capacity by 2020
Carbon dioxide equivalent -used to express all GHG gas emissions as the equivalent amount of concentration of carbon dioxide in terms of its greenhouse effect.
Greenhouse gas emissions intensity, generally expressed as tonnes of CO2-e per MWh (sometimes also referred to as GGI)
Integrated Drying and Gasification Combined Cycle technology
Integrated Gasification and Combined Cycle technology used to produce syngas, but without integrated drying within the process
Levelised Cost of Electricity - adopted as being equivalent to the long run marginal cost of producing electricity.
Megawatt hour. For power generation, a MWh is usually expressed as either 'as sent out' or 'as generated'
Noise from Industry in Regional Victoria Guidelines, EPA Publication 1411 (October 2011)
Oxides of nitrogen, including nitrogen-dioxide (NO2)
State Environment Protection Policy (Ambient Air Quality)
State Environment Protection Policy (Air Quality Management)
Synthetic gas (or synthesis gas) derived from the gasification of coal.
Challenge to Mr Shield's Ground of Review under s 33B(2)(a)
Greenhouse Gas Emissions - Is the DGDP 'Best Practice' in the Management of GHG emissions?
Greenhouse Gas Emissions - Is the DGDP consistent with the Aims, Principles and Intent of the SEPP(AQM)?
Should the DGDP approval be for 300 MWe or 600 MWe?
NOX, particulates, and other air quality indicators
Postscript: Response to Review of the Climate Change Act 2010
PART 1: INTRODUCTION**
(2) An application for review under subsection 1(a) is to be based on either or both of the following grounds -
(a) that if the works are completed in accordance with the works approval, the use of the works will result in -
(i) a discharge, emission or deposit of waste to the environment;
(b) that if the works are completed in accordance with the works approval, the use of the works will result in -
(i) a discharge, emission or deposit of waste to the environment;
... Parliament did not intend that those standards could be replaced or raised or otherwise modified by the environmental standards of any person or entity who or which might choose to become an applicant for review.
On a review under this Part the Tribunal, by order, may -
(a) direct that a works approval shall or shall not be issued or transferred or be subject to a specified condition;
In determining an application for review or a declaration under this Part the Tribunal must -
(a) take into account any relevant planning scheme; and
(b) where appropriate, have regard to any planning scheme or amendment adopted by a planning authority under the Planning and Environment Act 1987 but not, as at the date the application is determined, approved by the Minister or the planning authority; and
(c) take account of, and give effect to, any relevant State environment protection policy or waste management policy; and
(d) where appropriate, have regard to any agreement made under section 173 of the Planning and Environment Act 1987 affecting land the subject of the application.
Dual Gas Pty Ltd proposes to develop a new 600 MWe power station to generate base load power whilst demonstrating the IDGCC technology at commercial scale at a site in Morwell, Victoria.
The design of the plant is such that the steam generated from the two HRSG's and the two char burners are supplied to a single steam turbine.[23]
The nature of the gasification process and power generation
The DGDP is then expected to operate as a full commercial power station with a program life of some 30 years, but may operate longer.
Comparisons with other power stations, fuel sources & technology
PART 4: CHALLENGE TO OBJECTOR STANDING
a person whose interests are affected by the decision (other than the applicant or licence holder) may apply to the Tribunal, within 21 days after the decision is made, for review of the decision.
5 When are a person's interests affected by a decision?
If an enabling enactment provides that a person whose interests are affected by a decision may apply to the Tribunal for review of the decision -
(a) interests means interests of any kind and is not limited to proprietary, economic or financial interests;
(b) the person may apply to the Tribunal whether the person's interests are directly or indirectly affected by the decision and whether or not any other person's interests are also affected by the decision.
Clause 27 deals with persons who may make application to this tribunal. It sets out the standing provisions. The intention is to provide access to as broad a range of persons who wish to participate in the proceeding as is compatible with the requirements of the jurisdiction and the interests of justice. The question of standing before courts or tribunals is one that has been the subject of much debate and, in many people's eyes, the current law regarding standing is quite restrictive. The intention of this clause is to provide access to persons who not only have the traditional kinds of association with the decision involved - whether proprietorial or economic - but also have a concern that places them beyond the category of a member of the general public or in the words of the cases, a "mere busybody". That concern does not need to result from interference with a specific legal right but may arise, for example, from a genuinely held and articulated intellectual or aesthetic concern in the subject-matter of the decision[44].
Although this second reading speech was made some time ago, it is still a relevant extrinsic aid to the interpretation of Parliament's intent for tribunal standing, in terms of the relatively wide meaning that may be given to a person's 'interests' that may be affected by a reviewable decision. It nonetheless falls short of giving open standing to any person. There is seemingly the need for a genuine connection with the subject matter of the decision to be demonstrated, in a manner compatible with the context of the Tribunal's relevant jurisdiction under an enabling enactment.
The scope of the expression "a person whose interests are affected by the decision" in s 33B is not unlimited, although it awaits definitive judicial consideration.
That proceeding did not arise from an objector application under s 33B.
If that view be correct (which I need not and do not decide), then the word "interests" in s 33B(1) has a very wide meaning[51].
... I note at the outset that the word "interests" has many senses and shades of meaning and that it is used in s 33B in two quite different contexts - standing to appeal and grounds of appeal[54].
The 1998 legislation should not be interpreted as having altered, by a side wind, the established, clear (narrow) meaning of "interests" in s 33B(2)[57].
In the Act with which we are concerned, it may be said that the busybody is allowed full sway for one of the grounds of appeal, upon which an appellant before the Board may rely, has nothing to do directly with the personal position of the appellant or of any other party. I refer to the ground in para. (b) which is concerned with provisions of a licence or resulting conditions which are inconsistent with State environment protection policy. It is difficult to see how a person whose pecuniary or other direct interests in the narrow sense are said to be affected would seek to rely on this ground rather than upon the grounds under paras. (a) or (c). Thus the ground in para. (b) must contemplate that some other objector who feels aggrieved should have a right of appeal.[58]
Application of principles to objector standing in this proceeding
... the subject matter of the EP Act is the amorphous mass of air and water the real concern of all members of the public. I refer to what I have already said as to its essential concern, a social one of the widest import to members of the public throughout the State...[63]
Whilst some provisions and processes under the EP Act have changed over time, this sentiment as to the wide scope of the Act (and the potential impacts of decisions under the EP Act on the community at large) remains applicable. The EP Act establishes a broad framework for protection of the environment in Victoria, having regard to principles of environmental protection set out in the Act[64]. The purposes of the EP Act are clearly relevant to standing, and we disagree with the approach adopted by Dual Gas in attempting to 'cherry-pick' particular provisions of the EP Act to support a narrower view.
PART 5: CHALLENGE TO MR SHIELD'S GROUND UNDER S 33B(2)(A)
(a) that if the works are completed in accordance with the works approval, the use of the works will result in -
(i) a discharge, emission or deposit of waste to the environment;
... in my opinion, s 33B(2)(a) should be interpreted as referring to the financial, physical or other like personal interests of the particular applicant as an individual or as a corporation, as the case may be. In my view, it is only interests of that kind which can intelligibly be said to be capable of being "unreasonably and adversely affected" by the "use" of proposed works. By contrast, one would not normally speak of an intellectual, philosophical or emotional interest in the protection of the environment as being something capable of being unreasonably and adversely affected by the use of proposed works, even works to which the person or corporation was opposed on environmental grounds. It would be at least odd to refer to such use as being apt to unreasonably and adversely affect the objects or concerns of the person or corporation.
Further, the provisions of s 33B(2) as a whole indicate very strongly that intellectual, philosophical or emotional concerns about the protection of the environment cannot constitute "interests" for the purposes of s 33B(2)(a). In my view, Parliament has made exhaustive provision in paragraph (b) of s 33B(2) as to the grounds able to be relied upon by a party with no personal stake in the outcome.
Moreover, I am probably bound to adopt a confined view of "interests" in s 33B(2)(a) because of the judgment of the Full Court in Australian Conservation Foundation v Environment Protection Appeal Board.
PART 6: GREENHOUSE GAS EMISSIONS - IS THE DGDP PROPOSAL 'BEST PRACTICE' IN THE MANAGEMENT OF GHG EMISSIONS?
How does the issue of 'best practice' arise in this proceeding?
(c) apply best practice to the management of their emissions ...
(1) A generator of a new or substantially modified source of emissions must apply best practice to the management of those emissions. ...
(1) Generators of emissions of greenhouse gases must manage their emissions in accordance with the provisions of Clauses 18 and 19. ...
'best practice' means the best combination of eco-efficient techniques, methods, processes or technology used in an industry sector or activity that demonstrably minimises the environmental impact of a generator of emissions in that industry sector or activity.
Is the DGDP best practice when considered holistically?
'eco-efficient' means producing more goods with less energy and fewer natural resources, resulting is less waste or pollution.
PART 7: GREENHOUSE GAS EMISSIONS - IS THE DGDP INCONSISTENT WITH THE AIMS, PRINCIPLES AND INTENT OF THE SEPP(AQM)?
How does the issue of inconsistency with policy arise in this proceeding?
(a) manage their activities and emissions in accordance with the aims, principles and intent of the policy. ...
(1) Generators of emissions of greenhouse gases must manage their emissions in accordance with the provisions of Clauses 18 and 19 ...
Preliminary issue - does cl 18(3) apply in this proceeding?
(a) ensure that the environmental quality objectives of the State Environment Protection Policy (Ambient Air Quality) are met;
(b) drive continuous improvement in air quality and achieve the cleanest air possible having regard to the social and economic development of Victoria; and
(c) support Victorian and national measures to address the enhanced greenhouse effect and depletion of the ozone layer.
However, these are additional and complementary measures within an overall package (rather than competing alternatives), and none of the other measures we were taken to expressly seek to prohibit or restrict the use of lower emissions brown coal electricity generation in the future, nor the development of technology to support this.
The policy is guided by the following principles of environment protection:
(1) Integration of Economic, Social and Environmental Considerations
(a) Sound environmental practices and procedures should be adopted as a basis for ecologically sustainable development for the benefit of all human beings and the environment.
(b) This requires the effective integration of economic, social and environmental considerations in decision making processes with the need to improve community well-being and the benefit of future generations.
(c) The measures adopted should be cost-effective and in proportion to the significance of the environmental problems being addressed.
(a) If there are threats of serious or irreversible environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation.
(i) a careful evaluation to avoid serious or irreversible damage to the environment wherever practicable; and
(ii) an assessment of the risk-weighted consequences of various options.
The present generation should ensure that the health, diversity and productivity of the environment is maintained or enhanced for the benefit of future generations.
Integration of Economic, Social and Environmental Considerations (the Integration Principle)
Emissions to the air environment will be managed so that the beneficial uses of the air environment are protected, Victoria's air quality goals and objectives are met, our air quality continues to improve and we achieve the cleanest air possible, having regard to the State's social and economic development. ...
The Parliament of Victoria recognises on behalf of the people of Victoria the overwhelming scientific consensus that human activity is causing climate change.
Climate change is a common concern of humankind and responding to climate change is a responsibility shared by all levels of government, industry, communities and the people of Victoria.
Early action to reduce greenhouse gas emissions will ease the task of long-term transition to an environmentally sustainable economy.
(1) The Minister must ensure that, by the year 2020, the amount of Victoria's greenhouse gas emissions is 20% below the amount of Victoria's greenhouse gas emissions for the year 2000.
This assessment agrees that the additional emissions from the DGDP will make it more difficult for Victoria to achieve the 2020 target, although a range of other measures could be used to achieve the reduction, including the closure of existing plant.
If successful, the IDGCC technology might also result in the accelerated replacement of traditional brown coal-fired power stations with this technology, both in Victoria and other parts of the world. Such replacement of older power stations in Victoria may assist in meeting the target[118].
(2) A person making a decision or taking an action referred to in subsection (1) must have regard to -
(a) the potential impacts of climate change relevant to the decision or action; and
(b) the potential contribution to Victoria's greenhouse gas emissions of the decision or action ...
(3) In having regard to the potential impacts of climate change, the relevant considerations for a person making a decision or taking an action are potential -
(b) long and short term economic, environmental, health and other social impacts;
(4) In having regard to the potential contribution to Victoria's greenhouse gas emissions, the relevant considerations for a person making a decision or taking an action are potential -
(c) increases and decreases in greenhouse gas emissions;
(d) cumulative impacts of greenhouse gas emissions.
Integrated assessment of aims, principles and intent of SEPP(AQM)
PART 8: SHOULD THE DGDP BE APPROVED AT 300 MW OR 600 MW?
Is there a need for the generating capacity that the DGDP will provide?
Potential for the DGDP to link to a demonstration of CCS
The operation of an E class gas turbine with syngas is best practice because no higher grade turbine is currently available from manufacturers/suppliers for use with this fuel[143].
The risks posed by climate change have been expressly recognised by the Victorian Parliament. Specific legislative measures, including an emissions reduction target, have been implemented with a view to managing that risk (taking into account other societal goals). For those reasons already discussed at length above, not only will the DGDP not compromise the achievement of that target, it also has the potential to contribute toward its achievement. Indeed, as acknowledged by Professor Karoly, if the DGDP does ultimately replace (or indeed displace) existing brown coal fired-power stations operating within the Latrobe Valley, there will be a reduction in the level of climate change risk by "a small but important amount"[150].
It is clearly not the case, however, that the achievement of this target would be compromised by the operation of the DGDP in and of itself. Put differently, the fact that the DGDP will emit greenhouse gases into the atmosphere at the rates and volumes proposed, does not mean that the emissions reduction target will not be met. To the contrary, it is submitted that the capacity for the DGDP to inter alia replace and displace other (more greenhouse gas emissions intensive) sources of electricity production, means that the proposal should be considered wholly consistent with the achievement of the emissions reduction target[151].
Will the DGDP displace or replace higher GEI electricity generation?
In relation to the Commonwealth Government's Contract for Closure (CFC) program, there is the potential for this to result in base-load plant being removed in the period 2016-2020. Having enough supply to meet demand will be reliant on private investment to replace this plant as well as meeting demand growth. Again, it is up to investors to assess the risks and profit margins of the technology they propose to use, and to consider their likely competitive position in the national context.[162]
You heard not only from Dr Washusen but also from Mr Walton that the levelised cost of electricity of the proposed DGDP is such that it simply would not be viable unless there is a closure of an existing brown coal power station, or a reduction in the use of an existing brown coal power station. We call that replace or displace. There is no prospect on the evidence that Dual Gas will be able to build and operate its proposed power station if all the existing brown coal power stations continue to operate at their current capacity[164].
Conclusions on whether DGDP should be 300 MWe or 600 MWe
Condition linking DGDP to replacement of higher GEI generation
... the implementation of carbon pricing is an opportunity to ensure that no further market-distorting non-complementary interventions are made and that current measures are reviewed against the Council of Australian Governments (COAG) complementarity principles for climate change mitigation measures.
In this context, the Australian Government has decided not to proceed with the introduction of an emissions standard or carbon capture and storage standard for future coal-fired generation investment. An emissions standard is unnecessary in the presence of carbon pricing. Similarly, a carbon capture and storage standard would impose unnecessary regulatory and administrative costs and would be difficult to implement until a greater understanding of carbon capture and storage requirements is available. The government also considers such regulatory interventions to be inconsistent with a market-based approach to reducing greenhouse gas emissions. [168]
How does the issue of SO2 arise in this proceeding?
Assessment of SO2 emissions in comparison to existing emissions
Is the proposal 'best practice' in terms of SO2 emissions?
'best practice' means the best combination of eco-efficient techniques, methods, processes or technology used in an industry sector or activity that demonstrably minimises the environmental impact of a generator of emissions in that industry sector or activity.
Is it enough to meet the test of 'best practice' for SO2 emissions?
20C(3A) Despite anything to the contrary in subsection (2) or (4)[199], in issuing ... an authorisation[200], the Authority may impose conditions in relation to the authorisation that require the observance of standards that are more stringent than would be required by the applicable policy if the Authority is satisfied that -
(a) local environment conditions require a higher level of protection than would otherwise be provided; or
(b) the pollution control technology or noise control technology required to achieve more stringent standards is commonly available in the industry.
(1) For the purpose of improving or maintaining regional air quality within an Air Quality Control Region, the Authority may:
(a) require emission generators to reduce their emissions to a greater extent than required by clauses 18 and 19; and
(b) refuse to issue a works approval for a large new source of emissions unless emission reductions for other sources are able to offset the impacts of the proposed emissions.
At face value, cl 30 empowers the EPA to require a greater reduction of SO2 emissions than required by 'best practice' under cls 18 and 19.
Is there commonly available pollution control technology in the industry?
Are there local (air quality) environment conditions that require a higher level of protection?
Is a further reduction of SO2 emissions warranted to improve or maintain air quality in the Latrobe Valley AQCR?
Exercise of discretion under s 20C(3A) of the EP Act and cl 30(1) of the SEPP(AQM)
The measures adopted should be cost-effective and in proportion to the significance of the environmental problems being addressed.
...drive continuous improvement in air quality and achieve the cleanest air possible having regard to the social and economic development of Victoria[213].
...improving air quality in places where the greatest number of people are likely to be exposed [to the pollutant(s)], rather than reducing high concentrations...in small localised areas. This exposure reduction framework takes into account the fact that no lower threshold for effect has been identified and that any reduction in exposure is likely to result in a health benefit to the population.[217]
PART 10: NOX, PARTICULATES, AND OTHER AIR QUALITY INDICATORS
...it is not possible to have a situation whereby there are no health effects related to these pollutants [where health effects are observed at very low levels] as this would mean zero emissions from all sources.[228]
(7A) If a planning scheme requires a permit to be obtained under the Planning and Environment Act 1987 for the proposed works and a permit has not been issued, any works approval issued by the Authority for the proposed works must be issued subject to a condition that the approval does not take effect until a copy of the permit is served on the Authority by the applicant.
(7B) Any works approval issued in contravention of ...ss (7A) is void.
Consideration of town planning issues under s 37A EP Act
37A In determining an application for review or a declaration under this Part the Tribunal must -
(a) take into account any relevant planning scheme ...[244]
...[248] 4. Taken as a whole, we consider there is nothing in the planning scheme that directly militates against the issue of a works approval for the DGDP, and indeed some broad planning policy support for a project in the nature of the DGDP. We have considered these matters (as required by s 37A of the EP Act) and, given our comments above, we have found it unnecessary to refer expressly to planning scheme issues elsewhere in these reasons.
PART 14: POSTSCRIPT - RESPONSE TO REVIEW OF THE CLIMATE CHANGE ACT 2010
Issued under Section 19B of the Environment Protection Act 1970
This works approval allows the occupier to construct works at the premises subject to the attached conditions.
OCCUPIER: DUAL GAS PTY LTD (A.C.N. 117 102 244)
REGISTERED ADDRESS: UNIT 9, LEVEL 1, 677 SPRINGVALE RD,
PREMISES ADDRESS: COMMERCIAL RD, MORWELL VIC 3840
DATE OF RE-ISSUE FOLLOWING DETERMINATION OF VCAT APPLICATIONS FOR REVIEW: [insert date prior to re-issue]
......................................................................
This approval allows the construction at the premises of works and associated equipment for an integrated drying, gasification combined cycle power station with a maximum "sent out" electricity generating capacity of 600 MWe, where electricity is generated using a combination of "syngas" (derived from brown coal) and natural gas.
Subject to an exemption under clause 22 of the State Environment Protection Policy (Air Quality Management) in relation to Schedule E oxides of nitrogen emissions for as long as the plant operates as a syngas plant, the works approval holder shall adopt the following objectives for the protection of the environment:
1.2 This works approval allows the construction of the following works and associated equipment -
- with a 'sent out' electricity capacity of not more than 600 MWe.
1.3 The works as specified in condition 1.2 must be constructed in accordance with the relevant parts of the works approval application accepted on 2 September 2010 ("the application") as augmented or amended by:
a) additional information supplied to EPA by the occupier between the date
of acceptance of the application and 20 May 2011 ("the information'). [Note:Where information supersedes the information previously provided in relation to the same subject, the most recent information applies for the purpose of this condition.]
d) the Plan of the Works specified in condition 3.1 as approved by the EPA-
-except that, in the event of any inconsistency arising between the amended
application, the reports, the conditions of this works approval, the conditions of this works approval and the content of the reports shall apply.
1.4 This works approval will not take effect until any planning permit which is
required under the Planning and Environment Act 1987 has been issued by the Responsible Authority.
1.5 Construction of the works approved by this works approval must not commence until such time as the Australian Government has entered into contracts under its 'Contracts for Closure' program (or through any similar program or commercial agreement) which provide for the closure by 2020 of at least 600 MWe of coal-fired electricity generation in Victoria.
2.1 The plant must be designed in a manner which enables it to operate at
Greenhouse Gas Emissions Intensity (GEI) of 0.8tCO2-e/MWh 'as generated' to the satisfaction of EPA.
2.2 Construction may not commence until EPA has given the occupier written approval of the reports and plans specified in conditions 3.1, 3.2 and 3.3.
2.3 The occupier must construct all exhaust stacks to discharge wastes so that:
b) the outlet of each stack will allow free vertical discharge of wastes;
c) each stack is clearly labelled with a unique number; and
d) provisions for sampling are included in accordance with EPA Publication
No. 440.1, A Guide to the Sampling and Analysis of Air Emissions and
2.4 The occupier must install on the main process exhaust stack a device capable of continuously and accurately measuring and recording the concentration and mass emission rate of:
2.5 The occupier must install all equipment and containers in which oil products and oil-containing wastes are used or stored in a bunded area or areas, each of which must be constructed in accordance with EPA Publication No. TG 347/92, Bunding Guidelines, and so that:
i) impervious to all chemicals to be stored or used within the area;
b) each bunded area is not connected to the stormwater drainage system;
c) the surface of each base is graded with a slope of at least 1% towards a
d) each sump is fitted with a manually operated isolation valve.
2.6 The noise design targets for the purpose of condition 3.2 are specified in Table 2 and are to be assessed in accordance with State Environment Protection Policy (Control of Noise from Commerce Industry and Trade) No. N-1.
2.7 A detailed hazard and operability analysis must be undertaken prior to the
completion of final plant design and any necessary corrective measures must be included in the constructed works to the satisfaction of the EPA.
2.8 Provision must be made for the future installation of Dry Low NOx technology in the event that the plant ceases to operate as a syngas plant.
3.1 Before commencing construction, the occupier must submit to EPA for written approval a Plan of Works that includes detailed plans and specifications for the works specified in condition 1.2, including the dimensions of the main buildings, equipment and facilities.
3.2 The Plan of Works under condition 3.1 must be accompanied by a report, including details of:
b) noise sources with specifications, locations and attenuation equipment
that is demonstrated by acoustic modelling to achieve the noise design
c) provision for the future installation of carbon capture equipment,
demonstrating that there is sufficient space, as determined by design studies, for the carbon capture equipment, construction activities and the effective handling of environmental and safety issues; and
d) provision for the future installation of Dry Low NOx technology in the
event that the plant ceases to operate as a syngas plant.
3.3 Before commencing construction, the occupier must submit to the EPA for written approval a construction environmental management plan which addresses identified risks and includes:
b) the management of stormwater runoff (including provision of a
stormwater retention basin and sediment flocculation pond upstream of
c) the management of hazardous materials uncovered during site
d) an incident notification protocol whereby the occupier will immediately
advise EPA of any incident at the premises that may result in off-site
3.4 Before commissioning can occur, a commissioning plan must be submitted to and approved by EPA.
**[**insert plan prior to re-issue, as per existing plan of premises]
[1] Dual Gas Closing Submissions at [139].
[2] Blatchford evidence, Tribunal Book at DGA.200.072
[5] For convenience and consistency, the plural term is used throughout these reasons, although any questions of law have been decided by Dwyer DP alone. Having said that, there is no disagreement between the three Tribunal members on any determinative issue, including questions of law.
[6] Following the principle in cases such as Domus Design Pty Ltd v Cardinia SC [2009] VCAT 283
[7] Schedule 1 of the Environment Protection (Schedule Premises and Exemptions) Regulations 2007.
[8] Schedule 1 of the Climate Change Act 2010
[9] See, for example, the EPA Closing Submissions at [11]-[29] and the discussion therein.
[10] e.g. EV at Tribunal Book EVL.360.040
[11] e.g. DEA at Tribunal Book DEA 460.014, Shield at Tribunal Book MSH.560.021
[12] [2009] VSC 53 at [13] per Cavanough J. This case is discussed in more detail later in these reasons.
[14] see also Thirteenth Beach at [41]
[15] see for example Minister for Aboriginal Affairs v Peko Wallsend Ltd [1986] HCA 40; (1985) 162 CLR 24
[16] HRL is the parent company of Dual Gas
[17] Mr Walton indicated he was employed on a contract basis by Dual Gas, and had a broader consulting role with Dual Gas beyond his 'title' role as CFO. See Transcript at p 1212.
[18] reported at [2011] VCAT 2432, per Judge Ginnane VP and Member Martin, and at [2011] VCAT 1920 per Judge Bowman VP and Member Code.
[19] Washusen evidence, Transcript at p 1492
[20] Based on State and Territories Greenhouse Gas Inventories 2009, Department of Climate Change and Energy Efficiency, Commonwealth of Australia, 2011, Tribunal Book EPA.050.731
[21] Blatchford evidence, Tribunal Book DGA.200.067 at p 24
[26] The IDGCC process is set out in more detail in diagrammatic form in Figure 1 in Blatchford's evidence, Tribunal Book DGA.200.067 at p 3.
[27] i.e. two gas turbines linked to one steam turbine.
[28] 'SKM Greenhouse Gas Assessment', Appendix D to works approval Application, at pp 55-61.
[29] Blatchford evidence when recalled, see for example Transcript at p 1739
[30] These comparisons are taken primarily from the Part 2 of the Dual Gas Closing Submissions. Those submissions, in turn, reference the primary source documents.
[31] Blatchford evidence at Transcript p 727.
[32] Blatchford evidence, Tribunal book DGA.200.067 at p 26
[33] Dual Gas Closing Submissions at [94]. We were told this figure did not include fugitive emissions from coal-seam gas.
[35] created through the production and construction of infrastructure (e.g. wind turbines or solar cells)
[36] s 5 of the Climate Change Act 2010 . We discuss this later in these reasons.
[37] Securing a Clean Energy Future - the Australian Government's Climate Change Plan, Commonwealth of Australia 2011, Tribunal book EPA.050.1126 at pp 14-15
[38] E.g. in reporting to the former Australian Greenhouse Office
[39] e.g. ALP Media Release: Tough new emissions standards for new coal fired power stations, 23 July 2010 (Exhibit O-3). See also ALP Release: A Cleaner Future for Power Stations (undated) (Exhibit D1); and Working Together for a Clean Energy Future, Dept of Resources, Energy and Tourism, Australian Government, July 2011 (part of Exhibit O-7)
[40] Taking Action for Victoria's Future : Victoria's Climate Change White Paper - The Action Plan, Victorian Government, July 2010 [Tribunal Book EPA.050.340] at p 13.
[41] statutory declaration of Adam Morton dated 16 January 2012 (Exhibit O-16)
[42] The Victorian Liberal National Coalition Plan for Energy and Resources (Exhibit E-5) at p15
[43] See for example Murragong Nominees Pty Ltd v MMBW (1985) 60 LGRA 210, referred to in Brambles Australia Ltd v Power Marketing Pty Ltd (1999) 16 VAR 143 at [24]
[44] Hansard, Legislative Assembly, 20 September 1984 at pp 665-6
[45] [1980] HCA 53; (1980) 146 CLR 493 (High Court), in particular per Gibbs J.
[46] [1981] HCA 50; (1981) 149 CLR 27 (High Court)
[47] [1994] FCA 1556; (1994) 55 FCR 492 (Federal Court), per Sackville J.
[48] [2010] VSC 335 (Supreme Court) per Osborn J.
[52] [2006] SASC 114 at [10]- [13]
[55] Thirteenth Beach at [15] and following
[56] ACF v EPAB [1983] VicRp 34; [1983] 1 VR 385 (Full Court), not to be confused with the High Court decision in ACF v Commonwealth referred to earlier.
[58] ACF v EPAB at p395 per Young CJ. See also p402-3 per Marks J
[59] Thirteenth Beach at [13] and [16].
[61] [2009] VCAT 970. For the record, we note that the Tribunal in Paul was constituted by two of the members sitting in this proceeding (Dwyer DP and Potts M).
[62] See also, for example, Allan v Transurban City Link Ltd (2001) 208 CLR 167 at 174 and 184; and at a Tribunal level, Brambles Australia Ltd v Power Marketing Pty Ltd (1999) 16 VAR 143 at [29] et seq. In Brambles, the Tribunal found that a wide interpretation of s 5 of the VCAT Act was consistent with the general scheme of review under the EP Act
[63] [1983] VicRp 34; [1983] 1 VR 385 at 403
[65] see, for example, One Steel Manufacturing Pty Ltd v Whyalla Red Dust Action Group Inc. [2006] SASC 114 at [14]- [15] per Debelle J. This principle applies equally to the statutory test for standing under the VCAT Act.
[66] SEPP(AQM) at cl 33-34 in the section "Management of Global Issues"
[67] affirmed 17 October 2011 and filed in the proceeding.
[68] affirmed 20 October 2011 ad filed in the proceeding.
[69] sworn 10 October 2011 and filed in the proceeding.
[70] affirmed 18 October 2011 and filed in the proceeding.
[71] Thirteenth Beach at [12]-[15]
[72] Direct support for this proposition is also found in Thirteenth Beach at [13]
[73] EV Closing Submissions at [54] and following.
[74] e.g. Shield at Tribunal Book MSH.560.023 at para 2.1 c).
[75] Dual Gas Closing Submissions at [62]
[77] Blatchford witness statement at p 8 (Table 2). We were advised there were 6 IGCC (i.e. gasification without integrated drying) plants in the world using coal as a fuel, with 4 more under construction, and a further 11 plants using other fuel sources such as petroleum or biomass. None use the IDG process.
[78] McIntosh witness statement at [77]-[78]. We note that the EPA's other witness Mr Tsesmelis did not consider himself able to express a view on gasifier best practice given the limited technical material available to him.
[79] Dual Gas Closing Submissions at [75] and following. We note however that, despite the submissions of Dual Gas' counsel, the 'SKM Greenhouse Gas Assessment' prepared for Dual Gas itself makes a comparison to 'worlds best practice' - see Appendix D to works approval Application, at p 44
[80] cf Pacific Seven Pty Ltd v City of Sandringham [192] VR 157 at 162-163 per Marks J., where a similar view was taken to the consideration and application of definitions in planning schemes.
[81] Professor van der Burgt's partially redacted report is at Tribunal Book [EPA.010.172R-174R]. Our comments above generally endorse a summary of this material in the Dual Gas Closing Submissions at [106].
[82] We have earlier noted savings of 75% to 80% in water use, compared with a conventional coal-fired power station.
[83] see EV Closing Submissions at [8] referring to Oxford and Macquarie Dictionary definitions.
[84] see also Western Region Environment Centre Inc & ACF v EPA and SITA Australia Pty Ltd [2003] 13 VPR 221, particularly at [18]-[19]
[85] These and other related document are included in the Tribunal Book, particularly in Folder 3. In particular, Securing a Clean Energy Future - the Australian Government's Climate Change Plan, Commonwealth of Australia 2011 appears at Tribunal book EPA.050.1126
[88] some of these are included in Folder 3 of the Tribunal Book, or as exhibits, including Exhibits O-7, D-7, D-16 and D-17
[92] see, for example, Victoria's Energy Future (2010) at p 16, Tribunal Book EPA.050.626
[93] Tribunal Book EPA.050.361 at p23-25
[95] Blatchford evidence, Tribunal Book at DGA.200.072
[96] Securing a Clean Energy Future - the Australian Government's Climate Change Plan, Commonwealth of Australia 2011 at chapter 2, Tribunal Book EPA.050.1126 at pp 14-15
[99] e.g. Electricity Statement of Opportunities, AEMO, 31 August 2011, and its update on the scope of generation investment in Victoria (Exhibit D-30)
[100] [2006] NSWLEC 133; (2006) 67 NSWLR 256, at 266 per Preston CJ, in part through adopting Principle 4 of the Rio Declaration on Environment and Development.
[101] following Gerry Bates_, Environmental Law in Australia_ (7th ed, 2010) at p215, referenced in EV's Closing Submissions at [20].
[102] Dey evidence, Tribunal Book EVL.600.642 at p 6.
[103] [2010] VSC 335 (Supreme Court), particularly at [188] and [203]-[211]
[104] Telstra Corporation Ltd v Hornsby Shire Council [2006] NSWLEC 133; (2006) 67 NSWLR 256
[105] Telstra, at 269, following N de Sadeleer, Environmental Principles: From Political Slogans to Legal Rules (OUP, 2005)
[110] Dual Gas Closing Submissions at [191]
[111] Karoly evidence, Transcript at p 1198
[112] EV Closing Submissions at [26]
[113] Telstra, at 276, following N de Sadeleer, Environmental Principles: From Political Slogans to Legal Rules (OUP, 2005)
[114] [2007] NSWLEC 59; (2000) 161 LGERA 1, particularly at [73] per Preston CJ.
[115] Media release by the Victorian Minister for Environment and Climate Change dated 22 October 2011 (Exhibit E-1)
[116] This is based on halving the 2.5% increase estimated from the 600 MWe plant.
[117] The Victorian Greenhouse Gas Inventory indicates Victoria's GHG emissions were approximately 118 Mt CO2-e in 2000 and 122 Mt CO2-e in 2009. See also the State and Territories Greenhouse Gas Inventories 2009, Department of Climate Change and Energy Efficiency, Commonwealth of Australia, 2011, Tribunal Book EPA.050.731
[119] 'SKM Greenhouse Gas Assessment', Appendix D to works approval Application at p 50
[120] Based on the Victorian Greenhouse Gas Inventory figures for 2000 and 2009 provided to us.
[121] Dual Gas Closing Submissions at [193] and [132], referred to in more detail later in these reasons.
[122] adopting the comments in BT Goldsmith Planning Services Pty Ltd v Blacktown CC [2005] NSWLEC 210 at [90] per Pain J, and also her Honour's follow-up comments in Gray v Minister for Planning (NSW) [2006] NSWLEC 720, particularly at [122] and [138]
[123] [2008] VSC 185 at [34] per Cavanough J.
[124] EPA works approval Assessment at p 22-23
[125] see Dual Gas Opening Submissions at [77]-[82]
[126] see Macedon Ranges SC v Romsey Hotel Pty Ltd [2008] VSCA 45 at [37] (Court of Appeal), following McDonald v Guardianship & Administration Board [1993] VicRp 36; [1993] 1 VR 521 at 528 (Full Court)
[127] Washusen evidence, Transcript at p1305
[128] In its Triple Bottom Line report on behalf of Dual Gas, SKM had indicated an estimated project cost of $1.2 billion, and we understand Dr Washusen used this figure in his modelling. Mr Walton's evidence was that the capital cost of a 600 MWe DGDP would be more in the order of, but materially below, $1.74 billion - see Walton powerpoint presentation at p 15; Transcript at p 1240 Lines 1-17 and p 2413 Line 21
[129] Washusen evidence, Tribunal Book EPA 100.301, at [196]-[198]
[130] Walton evidence, Transcript at p 1422
[131] Dual Gas Opening Submissions at [82]
[132] Washusen evidence at [199]-[201]
[133] Washusen evidence at [150]-[152]
[134] Washusen evidence at [152] and [204]
[135] Washusen evidence at [153] and [205]
[136] e.g. Climate Change White Paper (The Implementation Plan), Victoria, at p 22-23 (Tribunal Book EPA.050.384-385)
[137] Blatchford at Transcript p 742, Tsesmelis at Transcript p 967, McIntosh at Transcript p1069
[138] Blatchford evidence at Transcript p 727, with the basis for calculation explained at Transcript p 742.
[139] McIntosh evidence at Transcript pp 1069-1070
[140] Media releases. Exhibits D-28 and D-29
[141] Washusen evidence at Transcript p 1457-1459. See also the International Energy Agency Clean Energy Progress Report, April 2011, quoted by Dr Outhred in his witness statement at Tribunal Book EVL.300.614-616
[142] CCS Ready Policy: Considerations and Recommended Practices for Policy Makers, Global CCS Institute, 17 February 2010 (Exhibit D-24) at p 4.
[144] McIntosh witness statement at [79]-[80].
[145] e.g. Blatchford, powerpoint presentation to Tribunal at p 36
[146] We understand the Puertollano plant derives syngas from a gasification process that does not include IDG, and the GT operates with a different frequency cycle. There was evidence that this is the only IGCC plant using an 'F class' GT, which has operated since 1998 (Tsesmelis witness statement at p17), but that this GT has been beset by numerous problems (Blatchford evidence at Transcript p 732-3)
[148] EPA works approval assessment at p 23
[149] Cf Telstra Corporation Ltd v Hornsby Shire Council [2006] NSWLEC 133; (2006) 67 NSWLR 256 at 276, discussed earlier
[150] Dual Gas Closing Submissions at [193]
[151] Dual Gas Closing Submissions at [132]
[152] see, for example, Dual Gas Closing Submissions at [143], [132] and [193]. Excerpts from the last two paragraphs are quoted earlier in these reasons.
[153] see slide 19 of Walton's powerpoint presentation to the Tribunal, dated 11 November 2011.
[154] The graph at slide 20 of Walton's presentation, and Dual Gas' Closing Submissions at [149], both suggest the DGDP may still be competitive at a carbon price of slightly greater than $21/t, but this does not clearly follow from the more detailed assessment on slide 19.
[156] For the record, we note that the Morwell/Energy Brix power station is owned by HRL, the parent company of Dual Gas.
[157] Contract for Closure program, administrative arrangements, September 2011 (Exhibit D-15) at p 3.
[158] Washusen evidence, transcript p 1503
[159] Washusen evidence, transcript p 1446
[160] Electricity Statement of Opportunities, AEMO, 31 August 2011 at p 2-7, referred to in the evidence of Dr Washusen at [153].
[161] Contract for Closure program, administrative arrangements, September 2011 (Exhibit D-15) at p 2.
[162] Generation Investment Advice, AEMO, 10 February 2012 (Exhibit D30). The EPA and EV objected to the tendering of this document by Dual Gas during closing submissions, and after the close of formal evidence. However, the document was produced on the hearing day immediately following its publication by AEMO, and we consider it of some relevance.
[163] Dual Gas Closing Submissions at [139], referring to Blatchford evidence at Transcript p 722.
[166] [1973] VicRp 1; [1973] VR 1 (Supreme Court) per Stephen J
[167] S 22(1)(b) of the then Town and Country Planning Act 1961
[168] Draft Energy White Paper: Strengthening the Foundations for Australia's Energy Future, Commonwealth of Australia, December 2011 (Exhibit D23). The quote appears in the Executive Summary at pp xx - xxi
[171] see Working Together for a Clean Energy Future, Dept of Resources, Energy and Tourism, Australian Government, July 2011 (part of Exhibit O-7). See also the extracts from the Carbon Pollution Reduction Scheme Green Paper, June 2008, at pp 383-5, and the Carbon Pollution Reduction Scheme White Paper, December 2008, at pp 13-22 - 13-23, (both also part of Exhibit O-7).
[173] in particular, the relevant part of the integration principle in cl 7(1)(c) of the SEPP(AQM) that any measures adopted should be cost-effective and in proportion to the significance of the environmental problem being addressed.
[176] Ross evidence (witness statement of October 2011) at p 11, Tribunal book EPA.100.113; CAMM Report 9/11, p 52, Tribunal book EPA.100.243-245: Transcript at p 1527 lines 6-13 and pp 1550 line 30 to 1551 line 2.
[177] comprising four existing power stations and the Australian Paper Mill.
[178] Ross evidence (Oct 2011) at pp 7 and 17-19, Tribunal book EPA.100.109 and 119-121; CAMM Report 9/11 pp 7-62, Tribunal book EPA.100.199-254.
[180] which are independent of the grid manipulations that are disputed between Dr Ross and the Dual Gas commissioned assessments. Evidence about the use of grid size was given in Dr Ross' statement at pp 6 and 20, Tribunal book EPA.100.108 and 116; Transcript at pp 1527 line 30 to 1528 line 3; The independence of discrete receptors from the grid size was given orally -Transcript at p 1547 lines 4-18.
[181] CAMM Report 9/11 pp 7 -62 , Tribunal book EPA.100.199 - 254
[182] CAMM Report 9/11 p 32 , Tribunal book EPA.100.244
[183] The range being location dependant. Comparisons are made between Morwell East and the location near Loy Yang power station; CAMM Report 55/10 at pages 22- 23 and CAMM Report 9/11 at pages 32-33 , Tribunal book EPA.100.155-156 and EPA.100.224-225
[184] ibid, Tribunal book references EPA.100.156 and EPA.100.225, Transcript at pp 1530 line 24 to 1531 line 14 and pp 1547 - 1549.
[185] The plots of the 99.9 percentile levels are a spatial distribution of these levels that are independent of the time at which the concentration may occur. Put another way, the plotted 9th highest concentration contours included in Dr Ross' evidence show the areal extent of these high concentrations but not when they occur. It is important to understand therefore that these contours do not represent a snap shot in time of the worst extent of a sulphur dioxide plume: See Transcript at p 1529 lines 27-31 and pp 1545 line 19 to 1546 line 26.
[187] The highest recorded level has been 0.17ppm in 2008 compared to the criteria of 0.2ppm, Tribunal book EPA.010.133-R.
[188] in accordance with cls 16 and 28 of the SEPP(AQM).
[189] Blatchford's overhead presentation at page 42; Tribunal Court Book DGA.200.097.
[190] Blatchford evidence at p 30, Tribunal book DGA.200.096; Exhibit D-11, and Transcript at p 1725 to 1731.
[191] Transcript at pp 1725 to 1731 and pp 1738 to 1746.
[193] See cross examination of Dr Denison at Transcript pp 1631 line 1 to 1633 line 11.
[194] McIntosh's evidence at p14; Tribunal book EPA.100.432-R; Transcript at pp 1052 - 1053.
[195] equating electricity generation with the production of goods, as discussed earlier in these reasons.
[196] the IDG process reduces reliance on additional natural gas or other forms of energy
[197] EPA Closing Submissions at [147].
[198] McIntosh evidence at p 22, Tribunal book EPA.100.440-R. Transcript at pp 1052 - 1053.
[199] ss (2) and (4) relate to consistency with policy, or a policy as varied.
[200] An 'authorisation' is defined in s 20C(1) to include a works approval.
[201] Dr Denison's values were expressed in millions of kg/yr. For consistency with other evidence and the values we have expressed in these reasons we have converted these values to tonnes/year.
[202] Denison witness statement at [43], Tribunal book EPA.100.376; and Transcript at p 1582
[203] e.g. see 271 William Street Pty Ltd v City of Melbourne [1975] VicRp 15; [1975] VR 156 at pp 162-163; Protean (Holdings) Ltd v E.P.A. [1977] VicRp 5; [1977] VR 51 pages 58 to 60_; Melbourne Water Corporation v Domus Design Pty Ltd and Another_ [2007] VSC 114; (2007) 16 VR 539 at [44] - [82]; and Casey City Council v Seventh Day Adventist Church (Victorian Conference) Ltd [2010] VSC 625 at [58].
[204] e.g. $90m in Blatchford reply statement (Tribunal book DGA.200.220), $100m in Dual Gas further and better particulars (Tribunal book DGA.260.031), and $120m in Walton evidence (Tribunal book DGA.200.124)
[205] Walton evidence at Tribunal book DGA.200.124
[208] Walton powerpoint presentation at p 13; Transcript at 1266 to 1267.
[209] Transcript at p 788 Lines 10-12. The difference between the energy loss and efficiency loss being due to an ability to recover some efficiencies through greater heat exchange and generating more steam due to the absence of sulphur in the syngas stream (Blatchford powerpoint presentation at p 44; Transcript at p 762. There is also a consequential lessening of coal input into the process if sulphur reduction plant is operated (Transcript at p 763).
[211] Dual Gas Closing Submissions at [283] and footnote 282; Transcript at page 2445, lines 29-30.
[212] SEPP(AQM) at cl 7 and EP Act at ss 1B - 1L
[213] SEPP(AQM) at cl 6(b). See also the policy intent at cl 8.
[214] National Environment Protection Council.
[215] National Environmental Protection (Ambient Air Quality) Measure Review. Review Report. Prepared for the National Environmental Protection Council. May 2011 (Exhibit O-19).
[216] We further note that this data particularly highlights the vulnerability of those in the population with pre-existing comprised health condition or an increased vulnerability due to age.
[217] NEPC Review Report, op cit, at p 29.
[218] Blatchford powerpoint presentation at p 43; Transcript at p 757 lines 1-10.
[219] EPA works approval assessment at p 26; Tribunal Book EPA.010.133-R.
[221] There is some question in the way the table at Schedule E sets out these limits and which criteria apply to each category of turbine. We have applied what appears to be the commonly accepted limits for the gas turbines and as adopted in the DEA submission.
[222] Tribunal book EPA.020.298 and EPA.020.305.
[223] We have ignored for present purposes the air-preheating and the pre-drying stack emissions. Dual Gas application material (Tribunal book EPA.020.482) indicates these two sources to be inconsequential.
[224] EPA works approval Assessment Report; Tribunal book EPA.010.134-R.
[225] DEA Closing Submissions at [68] and [70] - [71].
[226] NEPC Review Report, op cit, at p 17
[228] Tribunal book EPA.100.381 at [85].
[230] Blatchford evidence at p 34 (Tribunal book DGA.200.100); powerpoint presentation at p 41; Transcript at p753, lines 15 to 23.
[231] At pages 22 and 23 of the DEA's closing submissions.
[233] EPA Closing submissions at page 162, [876] to [877].
[234] DEA closing submission at pages 22 and 23; Transcript 2120 line 19 to 2121, line 10.
[235] EPA works approval Review, Tribunal book EPA.010.136-R; HRL Technology Assessment report June 2010, Tribunal book EPA.020.629 to 660; and HRL Technology Briefing note for Mercury, November 2010, Tribunal book EPA.010.027-R to 033-R.
[236] May 2011 review report at pp 154-155; Tribunal book EPA.010.157-R at EPA.010.166-R to167-R.
[237] EPA Publication 1411, October 2011. In the works approval assessment phase, these guidelines did not apply, rather the Interim Guidelines for Control of Noise from Industry in Country Victoria (N3/89) were applied. The change in guidelines does not affect the proposed noise limits or the position of EPA or Dual Gas.
[239] Part 1 Overview, NIRV October 2011; Tribunal book reference EPA.050.1467.
[240] Transcript at page 1270 Lines 8-21.
[242] most acoustic experts generally advise that a 3dB(A) to 5dB(A) increase is barely detectable
[243] see statement of evidence prepared for Dual Gas by Marco Negri, town planner with Contour Consultants, dated September 2011. This statement had been filed during the interlocutory phase of the proceedings when the town planning issues were first raised, and Mr Negri was not called as a witness.
[244] Section 37A of the EP Act also requires the Tribunal to take into account, where appropriate, any adopted planning scheme amendment or any s 173 agreement. There are none affecting this proceeding.
[245] Latrobe Planning Scheme, Schedule 1 to cl 42.01
[248] decision of Minister for Planning dated 23 November 2009, noted in DGDP works approval Application at p 26
[251] Review of the Climate Change Act 2010, Department of Premier & Cabinet, December 2011, and the Victorian Government response to the Climate Change Act Review, Victorian Government, March 2012, both sourced by the Tribunal from www.climatechange.vic.gov.au
[252] Media release from Minister for Energy and Resources :'Victoria adopts Commonwealth position to reject new emissions intensity restrictions', 27 March 2012.
Dual Gas Pty Ltd & Ors
Environment Protection Authority
Dual Gas initially challenged the standing of all four objectors. The decision includes a detailed examination of the legislative framework and case law in relation to objector standing under s 33B(1) of the Environment Protection Act 1970. Given the wide definition to be given to "a person whose interests are affected" under s 5 of the VCAT Act, the Tribunal found that three of the four objectors had standing having regard to the context of the EP Act, the nature of the reviewable decision affecting a substantive global issue, and their genuine interest in the subject matter of the decision as opposed to a broader and more general environmental concern. The Tribunal disagreed with and chose not to follow the narrower approach adopted in Linaker v Greater Geelong CC [2011] VCAT 1806.
(1985) 162 CLR 24
(1980) 146 CLR 493
(1981) 149 CLR 27
(1994) 55 FCR 492
(2001) 208 CLR 167
(2006) 67 NSWLR 256
(2000) 161 LGERA 1
(2007) 16 VR 539