The applicant must submit to the Certifying Authority BASIX Certificate 213473M with any application for a Construction Certificate.
Note: Where there is any proposed change in the BASIX commitments the applicant must submit of a new BASIX Certificate to the Certifying Authority and Council. If any proposed change in the BASIX commitments are inconsistent with development consent (See: Clauses 145 and 146 of the Regulation) the applicant will be required to submit an amended development application to Council pursuant to section 96 of the Act.
All commitments in the BASIX Certificate must be shown on the Construction Certificate plans and specifications prior to the issue of any Construction Certificate.
Note: Clause 145(1)(a1) of the Environmental Planning & Assessment Regulation 2000 provides: "A certifying authority must not issue a construction certificate for building work unless it is satisfied of the following matters: (a1) that the plans and specifications for the building include such matters as each relevant BASIX certificate requires," Standard Condition: C7
C.14 Waste Storage - Residential Units (up to 4 units)
The Construction Certificate plans and specifications required by clause 139 of the Regulation, must make provision for:
a. the storage of waste and recycling bins behind the building line or within non-habitable areas of the building as close as possible to the service road collection point, b. a path for wheeling bins between the waste and recycling storage area and the collection point free of steps and kerbs and having a maximum grade of 1:8. Standard Condition: C16
C.15 Water and waste water - Section 73 Developers Certificate & Upgrading of existing system (Clause 25(1) WLEP 1995)
A developer compliance certificate under Part 6, Division 9 of the Sydney Water Act 1994 must have been issued by the Sydney Water Corporation prior to the issue of any Construction Certificate. The effect of this certificate is that adequate provision has been made or is available for the provision of potable water to and the removal of waste water from the development.
Note: Following application to Sydney Water, a 'Notice of Requirements' will detail water and sewer extensions to be built and charges to be paid. Please make early contact with Sydney Water's authorised Coordinator, since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design.
Note: Further information can be obtained from the Sydney Water Corporation on or telephone 13 20 92 or by visiting their web site: http://www.sydneywater.com.au/html/yourHome/edeveloper/urban_dev_qa.cfm.
The Construction Certificate plans and specifications, required to be submitted to the Certifying Authority pursuant to clause 139 of the Regulation, must detail the replacement of all private sewer pipes between all sanitary fixtures and Sydney Waters sewer main where they are not found by inspection to be Sewer grade UPVC or copper with continuously welded joints.
Note: This condition has been imposed to ensure that where private sewer pipes are old, may leak or may be subject to root invasion (whether from existing or proposed private or public landscaping) that existing cast iron, concrete, earthenware or terracotta systems are replaced with new UPVC or copper continuously welded pipes between all sanitary fixtures and Sydney Waters sewer main as part of the development, such that clause 25(1) of WLEP 1995 be satisfied. Further, leaking sewer pipes are a potential source of water pollution, unsafe and unhealthy conditions which must be remedied in the public interest. See: http://www.sydneywater.com.au/Publications/Factsheets/SewerfixLookingAfterYourSewerPipes.pdf Standard Condition: C22
C.16 Sound Attenuation of the Swimming Pool Plant Equipment
The Construction Certificate plans and specification required to be submitted pursuant to clause 139 of the Regulation must detail the sound attenuation works required to the swimming pool plant equipment to ensure that noise from the swimming pool plant equipment does not to exceed the background noise level when measured at any boundary of the site.
Note: Further information including lists of Acoustic Engineers can be obtained from:
The Construction Certificate plans and specifications required by clause 139 of the Regulation must demonstrate compliance (by showing the proposed location of all child-resistant barriers and the resuscitation sign) with the provisions of the Swimming Pools Act 1992.
Note: A statement to the effect that isolation swimming pool fencing complying with AS1926 will be installed does not satisfy this condition. The location of the required barriers and the sign must be detailed upon the Construction Certificate plans. Standard Condition: C55
The Construction Certificate plans and specification required to be submitted pursuant to clause 139 of the Regulation must detail the connection of backwash to Sydney Waters sewer in compliance with clause 10.9 (Figure 10.2) of AS/NZS 3500.2.2:1996.
Note: The plans must show the location of Sydney Waters sewer, the yard gully or any new connection to the sewer system including a detailed cross section of the connection complying with clause 10.9 (Figure 10.2) of AS/NZS 3500.2.2:1996.
Note: The discharge of backwash water to any stormwater system is water pollution and an offence under the Protection of the Environment Operations Act 1997. The connection of any backwash pipe to any stormwater system is an offence under the Protection of the Environment Operations Act 1997. Standard Condition: C56
D. Conditions which must be satisfied prior to the commencement of any development work
Dilapidation surveys must be conducted and dilapidation reports prepared by a professional engineer (structural) of all buildings on land whose title boundary abuts the site and of such further buildings located within the likely "zone of influence" of any excavation, dewatering and/or construction induced vibration.
These properties must include (but is not limited to):
The dilapidation reports must be completed and submitted to Council with the Notice of Commencement prior to the commencement of any development work.
Where excavation of the site will extend below the level of any immediately adjoining building the principal contractor or owner builder must give the adjoining building owner(s) a copy of the dilapidation report for their building(s) and a copy of the notice of commencement required by s81A(2) of the Act not less than two (2) days prior to the commencement of any work. Standard Condition: D4
D.2 Adjoining buildings founded on loose foundation materials
The principal contractor must ensure that a professional engineer determines the possibility of any adjoining buildings founded on loose foundation materials being affected by piling, piers or excavation. The professional engineer (geotechnical consultant) must assess the requirements for underpinning any adjoining or adjacent buildings founded on such soil on a case by case basis and the principal contractor must comply with any reasonable direction of the professional engineer.
Note: A failure by contractors to adequately assess and seek professional engineering (geotechnical) advice to ensure that appropriate underpinning and support to adjoining land is maintained prior to commencement may result in damage to adjoining land and buildings. Such contractors are likely to be held responsible for any damages arising from the removal of any support to supported land as defined by section 177 of the Conveyancing Act 1919. Standard Condition: D6
D.3 Construction Management Plan As a result of the site constraints, limited space and access a Construction Management Plan is to be submitted to Council. Due to the lack of on-street parking availability a Work Zone may be required from Council during construction. A construction management plan must be submitted and approved by Council's Development Engineer. The plan must:-
a. describe the anticipated impact of the construction works on: o local traffic routes o pedestrian circulation adjacent to the building site o and on-street parking in the local area, and; b. describe the means proposed to: o manage construction works to minimise such impacts, o provide for the standing of vehicles during construction, o provide for the movement of trucks to and from the site, and deliveries to the site, and; c. show the location of: o any site sheds and any anticipated use of cranes and concrete pumps, o any areas of Council property on which it is proposed to install a Works Zone (Construction Zone), o structures to be erected such as hoardings, scaffolding or shoring, o any excavation. d. describe the excavation impact on the area including o Number and types of trucks to be used o Time frame o Streets to be used o Routes to be taken o Directions of travel o Truck storage areas o It is recommended that vehicle routes be shared o Excavation is to only be carried out outside peak and school hours between 9.30am to 2.30pm week days o The CMP is to include both demolition and excavation works. e. show the location of all Tree Protection (Exclusion) Zones as required within the conditions of this development consent.
The Plan must make provision for all materials, plant, etc. to be stored within the development site at all times during construction. Structures or works on Council property such as hoardings, scaffolding, shoring or excavation need separate approval from Council. Standing of cranes and concrete pumps on Council property will need approval on each occasion.
Note: A minimum of eight weeks will be required for assessment. Work must not commence until the Construction Management Plan is approved. Failure to comply with this condition may result in fines and proceedings to stop work. Standard Condition: D9 (Autotext: DD9)
D.4 Work (Construction) Zone - Approval & Implementation
A work zone is required for this development. The principal contractor or owner must apply for, obtained approval for, pay all fees for and implemented the required work zone before commencement of any work.
The principal contractor must pay all fees associated with the application and occupation and use of the road as a work zone. All Work Zone signs must have been erected by Council to permit enforcement of the work zone by Rangers and Police before commencement of any work. Signs are not erected until full payment of work zone fees.
Note: The principal contractor or owner must allow not less than four weeks (for routine applications) from the date of making an application to the Traffic Committee (Woollahra Local Traffic Committee) constituted under the Clause 22 of the Transport Administration (General) Regulation 2000 to exercise those functions delegated by the Roads and Traffic Authority under Section 50 of the Transport Administration Act 1988.
Note: The enforcement of the work zone is at the discretion of Council's Rangers and the NSW Police Service. The principal contractor must report any breach of the work zone to either Council or the NSW Police Service. Standard Condition: D10
D.5 Security Fencing, Hoarding and Overhead Protection
Security fencing must be provided around the perimeter of the development site, including any additional precautionary measures taken to prevent unauthorised entry to the site at all times during the demolition, excavation and construction period. Security fencing must be the equivalent 1.8m high chain wire as specified in AS 1725.
Where the development site adjoins a public thoroughfare, the common boundary between them must be fenced for its full length with a hoarding, unless the least horizontal distance between the common boundary and the nearest parts of the structure is greater than twice the height of the structure. The hoarding must be constructed of solid materials (chain wire or the like is not acceptable) to a height of not less than 1.8 m adjacent to the thoroughfare.
Where a development site adjoins a public thoroughfare with a footpath alongside the common boundary then, in addition to the hoarding required above, the footpath must be covered by an overhead protective structure and the facing facade protected by heavy-duty scaffolding, unless either
a. the vertical height above footpath level of the structure being demolished is less than 4.0 m; or b. the least horizontal distance between footpath and the nearest part of the structure is greater than half the height of the structure.
The overhead structure must consist of a horizontal platform of solid construction and vertical supports, and the platform must
a. extend from the common boundary to 200mm from the edge of the carriageway for the full length of the boundary; b. have a clear height above the footpath of not less than 2.1 m; terminate 200mm from the edge of the carriageway (clearance to be left to prevent impact from passing vehicles) with a continuous solid upstand projecting not less than 0.5 m above the platform surface; and c. together with its supports, be designed for a uniformly distributed live load of not less than 7 kPa.
The principal contractor or owner builder must pay all fees associated with the application and occupation and use of the road (footway) for required hoarding or overhead protection.
The principal contractor or owner builder must ensure that Overhead Protective Structures are installed and maintained in accordance with WorkCover NSW Code of Practice - Overhead Protective Structures, gazetted 16 December 1994, as commenced 20 March 1995. This can be downloaded from: http://www.workcover.nsw.gov.au/Publications/LawAndPolicy/CodesofPractice/oheadprotstructs.htm.
Security fencing, hoarding and overhead protective structure must not obstruct access to utilities services including but not limited to man holes, pits, stop valves, fire hydrants or the like.
Note: The principal contractor or owner must allow not less than two (2) weeks from the date of making a hoarding application for determination. Any approval for a hoarding or overhead protection under the Roads Act 1993 will be subject to its own conditions and fees. Standard Condition: D11
The principal contractor or owner builder must install and maintain water pollution, erosion and sedimentation controls in accordance with:
a. The Soil and Water Management Plan if required under this consent; b. "Do it Right On Site, Soil and Water Management for the Construction Industry" published by the Southern Sydney Regional Organisation of Councils, 2001; and c. "Managing Urban Stormwater - Soils and Construction" published by the NSW Department of Housing 4th Edition" ('The Blue Book').
Where there is any conflict The Blue Book takes precedence.
Note: The International Erosion Control Association - Australasia (http://www.austieca.com.au/) lists consultant experts who can assist in ensuring compliance with this condition. Where Soil and Water Management Plan is required for larger projects it is recommended that this be produced by a member of the International Erosion Control Association - Australasia.
Note: The "Do it Right On Site, Soil and Water Management for the Construction Industry" publications can be down loaded free of charge from www.woollahra.nsw.gov.au.
Note: A failure to comply with this condition may result in penalty infringement notices, prosecution, notices and orders under the Act and/or the Protection of the Environment Operations Act 1997 without any further warning. It is a criminal offence to cause, permit or allow pollution.
Note: Section 257 of the Protection of the Environment Operations Act 1997 provides inter alia that "the occupier of premises at or from which any pollution occurs is taken to have caused the pollution" Warning, irrespective of this condition any person occupying the site may be subject to proceedings under the Protection of the Environment Operations Act 1997 where pollution is caused, permitted or allowed as the result of their occupation of the land being developed. Standard Condition: D14
D.7 Compliance with Building Code of Australia and insurance requirements under the Home Building Act 1989
For the purposes of section 80A (11) of the Act, the following conditions are prescribed in relation to a development consent for development that involves any building work:
a. that the work must be carried out in accordance with the requirements of the Building Code of Australia, b. in the case of residential building work for which the Home Building Act 1989 requires there to be a contract of insurance in force in accordance with Part 6 of that Act, that such a contract of insurance is in force before any building work authorised to be carried out by the consent commences.
a. to the extent to which an exemption is in force under clause 187 or 188, subject to the terms of any condition or requirement referred to in clause 187 (6) or 188 (4), or
In this condition, a reference to the BCA is a reference to that code as in force on the date the application for the relevant construction certificate is made.
Note: This condition must be satisfied prior to commencement of any work in relation to the contract of insurance under the Home Building Act 1989. This condition also has effect during the carrying out of all building work with respect to compliance with the Building Code of Australia. Standard Condition: D1
The Principal Contractor or owner builder must ensure that the sign required by clauses 98A and 227A of the Regulation is erected and maintained at all times. "Erection of signs
a. showing the name, address and telephone number of the principal certifying authority for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the work site is prohibited.
Note: PCA and principal contractors must also ensure that signs required by this clause are erected and maintained (see clause 227A which imposes a penalty exceeding $1,000).
Note: If Council is appointed as the PCA it will provide the sign to the principal contractor or owner builder who must ensure that the sign is erected and maintained as required by Clause 98A of the Regulation. Standard Condition: D12
Toilet facilities are to be provided, at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out, at the rate of one toilet for every 20 persons or part of 20 persons employed at the site.
a. must be a standard flushing toilet, and b. must be connected to a public sewer, or c. if connection to a public sewer is not practicable, to an accredited sewage management facility approved by the council, or d. if connection to a public sewer or an accredited sewage management facility is not practicable, to some other sewage management facility approved by the council.
The provision of toilet facilities in accordance with this condition must be completed before any other work is commenced.
accredited sewage management facility means a sewage management facility to which Division 4A of Part 3 of the Local Government (Approvals) Regulation 1993 applies, being a sewage management facility that is installed or constructed to a design or plan the subject of a certificate of accreditation referred to in clause 95B of the Local Government (Approvals) Regulation 1993.
approved by the council means the subject of an approval in force under Division 1 of Part 3 of the Local Government (Approvals) Regulation 1993.
public sewer has the same meaning as it has in the Local Government (Approvals) Regulation 1993.
sewage management facility has the same meaning as it has in the Local Government (Approvals) Regulation 1993.
Note: This condition does not set aside the requirement to comply with Workcover NSW requirements. Standard Condition: D13
D.10 Building - Construction Certificate, Appointment of Principal Certifying Authority, Appointment of Principal Contractor and Notice of Commencement (s81A(2) of the Act)
The erection of the building in accordance with this development consent must not be commenced until:
a. a construction certificate for the building work has been issued by the consent authority, the council (if the council is not the consent authority) or an accredited Certifier, and
b. the person having the benefit of the development consent has: i. appointed a principal certifying authority for the building work, and ii. notified the principal certifying authority that the person will carry out the building work as an owner-builder, if that is the case, and
b1. the principal certifying authority has, no later than 2 days before the building work commences: i. notified the consent authority and the council (if the council is not the consent authority) of his or her appointment, and ii. notified the person having the benefit of the development consent of any critical stage inspections and other inspections that are to be carried out in respect of the building work, and
b2. the person having the benefit of the development consent, if not carrying out the work as an owner-builder, has: i. appointed a principal contractor for the building work who must be the holder of a contractor licence if any residential building work is involved, and ii. notified the principal certifying authority of any such appointment, and iii. unless that person is the principal contractor, notified the principal contractor of any critical stage inspections and other inspections that are to be carried out in respect of the building work, and iv. given at least 2 days' notice to the council of the person's intention to commence the erection of the building.
Note: building has the same meaning as in section 4 of the Act and includes part of a building and any structure or part of a structure.
Note: new building has the same meaning as in section 109H of the Act and includes an altered portion of, or an extension to, an existing building.
Note: The commencement of demolition works associated with an altered portion of, or an extension to, an existing building is considered to be the commencement of building work requiring compliance with section 82A(2) of the Act (including the need for a Construction Certificate) prior to any demolition work. See: Over our Dead Body Society Inc v Byron Bay Community Association Inc [2001] NSWLEC 125.
Note: Construction Certificate Application, PCA Service Agreement and Notice of Commencement forms can be downloaded from Council's website www.woollahra.nsw.gov.au .
Note: It is an offence for any person to carry out the erection of a building in breach of this condition and in breach of section 81A(2) of the Act.Standard Condition: D15
D.11 Notification of Home Building Act 1989 requirements
a. For the purposes of section 80A (11) of the Act, the requirements of this condition are prescribed as conditions of a development consent for development that involves any residential building work within the meaning of the Home Building Act 1989.
b. Residential building work within the meaning of the Home Building Act 1989 must not be carried out unless the principal certifying authority for the development to which the work relates (not being the council) has given the council written notice of the following information: i. in the case of work for which a principal contractor is required to be appointed: * the name and licence number of the principal contractor, and * the name of the insurer by which the work is insured under Part 6 of that Act, ii. in the case of work to be done by an owner-builder: * the name of the owner-builder, and * if the owner-builder is required to hold an owner-builder permit under that Act, the number of the owner-builder permit. c. If arrangements for doing the residential building work are changed while the work is in progress so that the information notified under subclause (2) becomes out of date, further work must not be carried out unless the principal certifying authority for the development to which the work relates (not being the council) has given the council written notice of the updated information.
d. This clause does not apply in relation to Crown building work that is certified, in accordance with section 116G of the Act, to comply with the technical provisions of the State's building laws. Standard Condition: D17
D.12 Establishment of boundary location, building location and datum
Prior to the commencement of any work the principal contractor or owner builder must ensure that a surveyor registered under the Surveying Act 2002 sets out:
a. the boundaries of the site by permanent marks (including permanent recovery points); b. the location and level of foundation excavations, footings, walls and slabs by permanent marks, pegs or profiles relative to the boundaries of the land and relative to Australian Height Datum ("AHD") in compliance with the approved plans; c. establishes a permanent datum point (bench mark) within the boundaries of the site relative to AHD; and d. provides a copy of a survey report by the registered surveyor detailing, the title boundaries, pegs/profiles, recovery points and bench mark locations as established pursuant to this condition to the PCA.
Note: Where the principal contractor or owner builder notes any discrepancy between the approved development consent and the Construction Certificate, especially in relation to the height, location or external configuration of the building (but not limited to these issues) the principal contractor or owner builder should not proceed until satisfied that the variations as shown are consistent with the consent. Failure to do so may result in a breach of development consent.
Note: On larger developments, or where boundary redefinition is required, the placement of new State Survey Marks as permanent marks should be considered by the registered surveyor. Standard Condition: D18
E. Conditions which must be satisfied during any development work
E.1 Maintenance of Vehicular and Pedestrian Safety and Access
The principal contractor or owner builder and any other person acting with the benefit of this consent must:
a. Not erect or maintain any gate or fence swing out or encroaching upon the road or the footway. b. Not use the road or footway for the storage of any article, material, matter, waste or thing. c. Not use the road or footway for any work. d. Keep the road and footway in good repair free of any trip hazard or obstruction. e. Not stand any plant and equipment upon the road or footway.
This condition does not apply to the extent that a permit or approval exists under the section 73 of the Road Transport (Safety and Traffic Management) Act 1999, section 138 of the Roads Act 1993 or section 94 of the Local Government Act 1993 except that at all time compliance is required with:
a. Australian Standard AS 1742 (Set) Manual of uniform traffic control devices and all relevant parts of this set of standards. b. Australian Road Rules to the extent they are adopted under the Road Transport (Safety and Traffic Management) (Road Rules) Regulation 1999.
Note: Section 73 of the Road Transport (Safety and Traffic Management) Act 1999 allows the Police to close any road or road related area to traffic during any temporary obstruction or danger to traffic or for any temporary purpose. Any road closure requires Police approval.
Note: Section 138 of the Roads Act 1993 provides that a person must not: (a) erect a structure or carry out a work in, on or over a public road, or (b) dig up or disturb the surface of a public road, or (c) remove or interfere with a structure, work or tree on a public road, or (d) pump water into a public road from any land adjoining the road, or (e) connect a road (whether public or private) to a classified road, otherwise than with the consent of the appropriate roads authority.
Note: Section 68 of the Local Government Act 1993 provides that a person may carry out certain activities only with the prior approval of the council including:
Part C Management of Waste: "1. For fee or reward, transport waste over or under a public place 2. Place waste in a public place 3. Place a waste storage container in a public place."
Part E Public roads: "1. Swing or hoist goods across or over any part of a public road by means of a lift, hoist or tackle projecting over the footway 2. Expose or allow to be exposed (whether for sale or otherwise) any article in or on or so as to overhang any part of the road or outside a shop window or doorway abutting the road, or hang an article beneath an awning over the road."
Any work in, on or over the Road or Footway requires Council Approval and in the case of classified roads the NSW Roads and Traffic Authority. Road includes that portion of the road uses as a footway. Standard Condition: E7
The principal contractor or owner builder must ensure that the following monitoring, measures and controls are maintained:
a) Erosion and sediment controls, b) Dust controls, c) Dewatering discharges, d) Noise controls; e) Vibration monitoring and controls; f) Ablutions;
Note 1: See http://www.epa.nsw.gov.au/small_business/builders.htm for additional information. Standard Condition: E11
E.3 Compliance with Geotechnical/Hydrogeological Monitoring Program
Excavation must be undertaken in accordance with the recommendations of the Geotechnical / Hydrogeological Monitoring Program and any oral or written direction of the supervising professional engineer.
The principal contractor and any sub-contractor must strictly follow the Geotechnical / Hydrogeological Monitoring Program for the development including, but not limited to;
a) the location and type of monitoring systems to be utilised; b) recommended hold points to allow for inspection and certification of geotechnical and hydrogeological measures by the professional engineer; and c) the contingency plan.
Note: The consent authority cannot require that the author of the geotechnical/hydrogeological report submitted with the Development Application to be appointed as the professional engineer supervising the work however, it is the Council's recommendation that the author of the report be retained during the construction stage. Standard Condition: E12
A person must not to do anything on or in relation to the site (the supporting land) that removes the support provided by the supporting land to any other land (the supported land) or building (the supported building).
For the purposes of this condition, supporting land includes the natural surface of the site, the subsoil of the site, any water beneath the site, and any part of the site that has been reclaimed.
Note: This condition does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public. Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is considered necessary upon any adjoining or supported land by any person the principal contractor or owner builder must obtain: a) the consent of the owners of such adjoining or supported land to trespass or encroach, or b) an access order under the Access to Neighbouring Land Act 2000, or c) an easement under section 88K of the Conveyancing Act 1919, or d) an easement under section 40 of the Land & Environment Court Act 1979 as appropriate.
Note: Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land. Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).
Note: Clause 20 of the Roads (General) Regulation 2000 prohibits excavation in the vicinity of roads as follows: "Excavations adjacent to road - A person must not excavate land in the vicinity of a road if the excavation is capable of causing damage to the road (such as by way of subsidence) or to any work or structure on the road." Separate approval is required under the Roads Act 1993 for any underpinning, shoring, soil anchoring (temporary)) or the like within or under any road. Council will not give approval to permanent underpinning, shoring, soil anchoring within or under any road.
Note: The encroachment of work or the like is a civil matter of trespass or encroachment and Council does not adjudicate or regulate such trespasses or encroachments except in relation to encroachments upon any road, public place, crown land under Council's care control or management, or any community or operational land as defined by the Local Government Act 1993. Standard Condition: E13
The principal contractor or owner builder must maintain water pollution, erosion and sedimentation controls in accordance with:
a) The Soil and Water Management Plan required under this consent; b) "Do it Right On Site, Soil and Water Management for the Construction Industry" published by the Southern Sydney Regional Organisation of Councils, 2001; and c) "Managing Urban Stormwater - Soils and Construction" published by the NSW Department of Housing 4th Edition ("The Blue Book").
Where there is any conflict The Blue Book takes precedence.
Note 1: A failure to comply with this condition may result in penalty infringement notices, prosecution, notices and orders under the Act and/or the Protection of the Environment Operations Act 1997 without any further warning. It is a criminal offence to cause, permit or allow pollution.
Note 2: Section 257 of the Protection of the Environment Operations Act 1997 provides that "the occupier of premises at or from which any pollution occurs is taken to have caused the pollution". Warning, irrespective of this condition any person occupying the site may be subject to proceedings under the Protection of the Environment Operations Act 1997 where pollution is caused, permitted or allowed as the result of the occupation of the land being developed whether or not they actually cause the pollution. Standard Condition: E15
The principal contractor or owner builder must ensure:
a) Prior to pumping any water into the road or public stormwater system that approval is obtained from Council under section 138(1)(d) of the Roads Act 1993; b) That water pollution, as defined by the Protection of the Environment Operations Act 1997, does not occur as the result of the discharge to the road, public stormwater system or other place or any site water; c) That stormwater from any roof or other impervious areas is linked, via temporary downpipes and stormwater pipes, to a Council approved stormwater disposal system immediately upon completion of the roof installation or work creating other impervious areas.
Note: This condition has been imposed to ensure that adjoining and neighbouring land is not adversely affected by unreasonable overland flows of stormwater and that site water does not concentrate water such that they cause erosion and water pollution. Standard Condition: E17
E.7 Check Surveys - boundary location, building location, building height and stormwater drainage system relative to Australian Height Datum
The Principal Contractor or Owner Builder must ensure that a surveyor registered under the Surveying Act 2002 carries out check surveys and provides survey certificates confirming the location of the building(s), ancillary works, flood protection works and the stormwater drainage system relative to the boundaries of the site and that the height of buildings, ancillary works, flood protection works and the stormwater drainage system relative to Australian Height Datum complies with this consent at the following critical stages.
The Principal Contractor or Owner Builder must ensure that work must not proceed beyond each of the following critical stages until compliance has been demonstrated to the PCA's satisfaction:
a. Upon the completion of foundation walls prior to the laying of any floor or the pouring of any floor slab and generally at damp proof course level; b. Upon the completion of formwork for floor slabs prior to the laying of any floor or the pouring of any concrete and generally at each storey; c. Upon the completion of formwork or framework for the roof(s) prior to the laying of any roofing or the pouring of any concrete roof; d. Upon the completion of formwork and steel fixing prior to pouring of any concrete for any ancillary structure, flood protection work, swimming pool or spa pool or the like; e. Upon the completion of formwork and steel fixing prior to pouring of any concrete for driveways showing transitions and crest thresholds confirming that driveway levels match Council approved driveway crossing levels and minimum flood levels.; f. Stormwater Drainage Systems prior to back filling over pipes confirming location, height and capacity of works.
Note: This condition has been imposed to ensure that development occurs in the location and at the height approved under this consent. This is critical to ensure that building are constructed to minimum heights for flood protection and maximum heights to protect views and the amenity of neighbours. Standard Condition: E20 (Autotext EE20)
Compliance with Council's Specification for Roadworks, Drainage and Miscellaneous Works Road works and work within the Road and Footway
All work carried out on assets which are under Council ownership or will revert to the ownership, care, control or management of Council in connection with the development to which this consent relates must comply with Council's Specification for Roadworks, Drainage and Miscellaneous Works dated January 2003.
The owner, principal contractor or owner builder must meet all costs associated with such works. This condition does not set aside the need to obtain relevant approvals under the Roads Act 1993 or Local Government Act 1993 for works within Roads and other public places.
Note: A copy of Council's "Specification for Roadworks, Drainage and Miscellaneous Works" can be down loaded free of charge from Council's website www.woollahra.nsw.gov.au Standard Condition: E24
All development activities and traffic movements must be carried out in accordance with the approved construction management plan.
All controls in the Plan must be maintained at all times. A copy of the Plan must be kept on-site at all times and made available to the PCA or Council on request.
Note: Irrespective of the provisions of the Construction Management Plan the provisions of traffic and parking legislation prevails. Standard Condition: E3
All persons must comply with Council's Tree Preservation Order ("the TPO"), other than where varied by this consent. The order applies to any tree, with a height greater than 5 metres or a diameter spread of branches greater than 3 metres, is subject to Council's Tree Preservation Order unless, exempted by specific provisions. Works to be carried out within a 5 metre radius of any tree, subject to the Tree Preservation Order, require the prior written consent of Council.
a) There must be no excavation or work within the required Tree Protection Zone(s). The Tree Protection Zone(s) must be maintained during all development work. b) Where excavation encounters tree roots with a diameter exceeding 50mm excavation must cease. The principal contractor must procure an inspection of the tree roots exposed by a qualified arborist. Excavation must only recommence with the implementation of the recommendations of the qualified arborist or where specific instructions are given by Council's Tree Management Officer in strict accordance with such Council instructions. c) Where there is damage to any part of a tree the principal contractor must procure an inspection of the tree by a qualified arborist immediately. The principal contractor must immediately implement treatment as directed by the qualified arborist or where specific instructions are given by Council's Tree Management Officer in strict accordance with such Council instructions.
Note: Trees must be pruned in accordance with Australian Standard AS 4373 - 2007 "Pruning of Amenity Trees" and Workcover NSW Code of Practice Amenity Tree Industry 1998. Standard Condition: E8 E.11 Tree Preservation & Approved Landscaping Works
All landscape works must be undertaken in accordance with the approved landscape plan, arborist report, tree management plan and transplant method statement as applicable.
Council Reference No: Species Location Dimension (Metres) Tree Value 1 Lophostemon confertus (Brushbox) Council nature strip- front of number 45 Spencer street 9 x 7 metres $2,600 2 Lophostemon confertus (Brushbox) Council nature strip- between number 47 & 49 Spencer Street 9 x 7 metres $2,600
Note: The tree trees required to be retained should appear coloured green on the construction certificate plans.
b) The following trees may be removed: Council Reference No: Species Location Dimension (Metres) 3 Syagrus romanzoffianum (Cocos Palm) Front yard of 47 Spencer Street 6 x 2 metres 4 Syagrus romanzoffianum (Cocos Palm) Front yard of 47 Spencer Street 7 x 2 metres 5 Cinnamomum camphora (Camphor laurel) Rear yard of 45 Spencer Street 7 x 4 metres
Note: The tree trees that may be removed should appear coloured red on the construction certificate plans.
E.12 Compliance with Building Code of Australia and insurance requirements under the Home Building Act 1989
For the purposes of section 80A (11) of the Act, the following condition is prescribed in relation to a development consent for development that involves any building work:
a. that the work must be carried out in accordance with the requirements of the Building Code of Australia, b. in the case of residential building work for which the Home Building Act 1989 requires there to be a contract of insurance in force in accordance with Part 6 of that Act, that such a contract of insurance is in force before any building work authorised to be carried out by the consent commences.
a. to the extent to which an exemption is in force under clause 187 or 188, subject to the terms of any condition or requirement referred to in clause 187 (6) or 188 (4) of the Regulation, or b. to the erection of a temporary building.
In this clause, a reference to the BCA is a reference to that Code as in force on the date the application for the relevant construction certificate is made. Standard Condition: E1 E.13 Compliance with Australian Standard for Demolition
Demolition of buildings and structures must comply with Australian Standard AS 2601 - 1991: The Demolition of Structures, published by Standards Australia, and as in force at 1 July 1993. Standard Condition: E2
Any new information which comes to light during remediation, demolition or construction works which has the potential to alter previous conclusions about site contamination, heritage significance, threatened species or other relevant matters must be immediately notified to Council and the Principal Certifying Authority. Standard Condition: E4
Critical stage inspections must be called for by the principal contractor or owner builder as required by the PCA, any PCA service agreement, the Act and the Regulation.
Work must not proceed beyond each critical stage until the PCA is satisfied that work is proceeding in accordance with this consent, the Construction Certificate(s) and the Act. critical stage inspections means the inspections prescribed by the Regulations for the purposes of section 109E(3)(d) of the Act or as required by the PCA and any PCA Service Agreement.
Note: The PCA may require inspections beyond mandatory critical stage inspections in order that the PCA be satisfied that work is proceeding in accordance with this consent.
Note: The PCA may, in addition to inspections, require the submission of Compliance Certificates, survey reports or evidence of suitability in accordance with Part A2.2 of the BCA in relation to any matter relevant to the development. Standard Condition: E5
a. No work must take place on any Sunday or public holiday, b. No work must take place before 7am or after 5pm any weekday, c. No work must take place before 7am or after 1pm any Saturday, and d. No piling, piering, cutting, boring, drilling, rock breaking, rock sawing, jack hammering or bulk excavation of land or loading of material to or from trucks must take place before 9am or after 4pm any weekday, or before 9am or after 1pm any Saturday. e. No rock excavation being cutting, boring, drilling, breaking, sawing, jack hammering or bulk excavation of rock, must occur without a 15 minute break every hour.
This condition has been imposed to mitigate the impact of work upon the amenity of the neighbourhood. Impact of work includes, but is not limited to, noise, vibration, dust, odour, traffic and parking impacts.
Note: The use of noise and vibration generating plant and equipment and vehicular traffic, including trucks in particular, significantly degrade the amenity of neighbourhoods and more onerous restrictions apply to these activities. This more invasive work generally occurs during the foundation and bulk excavation stages of development. If you are in doubt as to whether or not a particular activity is considered to be subject to the more onerous requirement (9am to 4pm weekdays and 9am to 1pm Saturdays) please consult with Council.
Note: Each and every breach of this condition by any person may be subject to separate penalty infringement notice or prosecution. Note: The delivery and removal of plant, equipment and machinery associated with wide loads subject to RTA and Police restrictions on their movement out side the approved hours of work will be considered on a case by case basis.
Note: Compliance with these hours of work does not affect the rights of any person to seek a remedy to offensive noise as defined by the Protection of the Environment Operations Act 1997, the Protection of the Environment Operations (Noise Control) Regulation 2000.
Note: EPA Guidelines can be down loaded from http://www.epa.nsw.gov.au/noise/nglg.htm .
Note: see http://www.epa.nsw.gov.au/resources/ci_build_sheet7.pdf Standard Condition: E6
Site Crane(s) and hoist(s) may be erected within the boundary of the land being developed subject to compliance with Australian Standards AS 1418, AS 2549 and AS 2550 and all relevant parts to these standards.
Cranes must not swing or hoist over any public place unless the principal contractor or owner builder have the relevant approval under the Local Government Act 1993, Crown Lands Act 1989 or Roads Act 1993.
The crane must not be illuminated outside approved working hours other than in relation to safety beacons required by the Civil Aviation Safety Authority under the Civil Aviation Act 1988 (Cth).
No illuminated sign(s) must be erected upon or displayed upon any site crane.
Note: Where it is proposed to swing a crane over a public place the principal contractor or owner builder must make a separate application to Council under section 68 of the Local Government Act 1993 and obtain activity approval from Council prior to swinging or hoisting over the public place.
Note: Where it is proposed to swing a crane over private land the consent of the owner of that private land is required. Alternatively, the principal contractor or owner builder must obtain an access order under the Access to Neighbouring Land Act 2000 or easement under section 88K of the Conveyancing Act 1919 or section 40 of the Land & Environment Court Act 1979 as appropriate. The encroachment of cranes or the like is a civil matter of trespass and encroachment. Council does not adjudicate or regulate such trespasses or encroachments. Standard Condition: E19
The principal contractor or owner builder must ensure that all waste storage containers, including but not limited to skip bins, must be stored within the site unless:
a) Activity Approval has been issued by Council under section 94 of the Local Government Act 1993 to place the waste storage container in a public place, and b) Where located on the road it is located only in a positions where a vehicle may lawfully park in accordance with the Australian Road Rules to the extent they are adopted under the Road Transport (Safety and Traffic Management) (Road Rules) Regulation 1999.
Note: Waste storage containers must not be located on the footpath without a site specific activity approval. Where such site specific activity approval is granted a 1.5m wide clear path of travel is maintained free of any trip hazards. Standard Condition: E21
Dust mitigation must be implemented in accordance with "Dust Control - Do it right on site" published by the Southern Sydney Regional Organisation of Councils.
a) Dust screens to all hoardings and site fences. b) All stockpiles or loose materials to be covered when not being used. c) All equipment, where capable, being fitted with dust catchers. d) All loose materials being placed bags before placing into waste or skip bins. e) All waste and skip bins being kept covered when not being filled or emptied. f) The surface of excavation work being kept wet to minimise dust. g) Landscaping incorporating trees, dense shrubs and grass being implemented as soon as practically possible to minimise dust.
Note 1: "Dust Control - Do it right on site" can be down loaded free of charge from Council's web site www.woollahra.nsw.gov.au or obtained from Council's office.
Note 2: Special precautions must be taken when removing asbestos or lead materials from development sites. Additional information can be obtained from www.workcover.nsw.gov.au and www.epa.nsw.gov.au . Other specific condition and advice may apply.
Note 3: Demolition and construction activities may affect local air quality and contribute to urban air pollution. The causes are dust, smoke and fumes coming from equipment or activities, and airborne chemicals when spraying for pest management. Precautions must be taken to prevent air pollution. Standard Condition: E23
E.20 Swimming and Spa Pools - Temporary Child Resistant Barriers and other matters
Temporary child-resistant barriers must be installed in compliance with the Swimming Pools Act 1992 where any swimming pool or spa pool as defined by the Swimming Pools Act 1992 contains more than 300mm in depth of water at any time. Permanent child-resistant barriers must be installed in compliance with the Swimming Pools Act 1992 as soon as practical.
Backwash and any temporary dewatering from any swimming pool or spa pool as defined by the Swimming Pools Act 1992 must be discharged to the sewer in compliance with clause 10.9 (Figure 10.2) of AS/NZS 3500.2.2:1996.
Note: This condition does not prevent Council from issuing an order pursuant to section 23 of the Swimming Pool Act 1992 or taking such further action as necessary for a breach of this condition or the Swimming Pools Act 1992. Standard Condition: E26
F. Conditions which must be satisfied prior to any occupation or use of the building (Part 4A of the Act and Part 8 Division 3 of the Regulation)
F.1 Commissioning and Certification of Systems and Works
The principal contractor or owner builder must submit to the satisfaction of the PCA works-as-executed ("WAE") plans, Compliance Certificates and evidence of suitability in accordance with Part A2.2 of the BCA confirming that the works, as executed and as detailed, comply with the requirement of this consent, the Act, the Regulations, any relevant construction certificate, the BCA and relevant Australian Standards.
Works-as-executed ("WAE") plans, Compliance Certificates and evidence of suitability in accordance with Part A2.2 of the BCA must including but may not be limited to:
a. Certification from the supervising professional engineer that the requirement of the Geotechnical / Hydrogeological conditions and report recommendations were implemented and satisfied during development work. b. All flood protection measures. c. All garage/car park/basement car park, driveways and access ramps comply with Australian Standard AS 2890.1 - "Off-Street car parking." d. All stormwater drainage systems. e. All mechanical ventilation systems. f. All hydraulic systems. g. All structural work. h. All acoustic attenuation work. i. All waterproofing. j. Such further matters as the Principal Certifying Authority may require.
Note: This condition has been imposed to ensure that systems and works as completed meet development standards as defined by the Act, comply with the BCA, comply with this consent and so that a public record of works as execute is maintained.
Note: The PCA may require any number of WAE plans, certificates, or other evidence of suitability as necessary to confirm compliance with the Act, Regulation, Development Standards, BCA, and relevant Australia Standards. As a minimum WAE plans and certification is required for stormwater drainage and detention, mechanical ventilation work, hydraulic services (including but not limited to fire services).
Note: The PCA must submit to Council, with any Occupation Certificate, copies of works-as-executed ("WAE") plans, Compliance Certificates and evidence of suitability in accordance with Part A2.2 of the BCA upon which the PCA has relied in issuing any Occupation Certificate. Standard Condition: F7
The owner or principal contractor must install all approved amenity landscaping (screen planting, soil stabilisation planting, etc.) prior to any occupation or use of the site.
Note: This condition has been imposed to ensure that the environmental impacts of the development are mitigated by approved landscaping prior to any occupation of the development. Standard Condition: F6
F.3 Occupation Certificate (section 109M of the Act)
A person must not commence occupation or use of the whole or any part of a new building (within the meaning of section 109H (4) of the Act) unless an occupation certificate has been issued in relation to the building or part.
Note: New building includes an altered portion of, or an extension to, an existing building. Standard Condition: F1
All letter boxes must be constructed and located in accordance with AS/NZS 4253:1994 Mailboxes and to Australia Post's satisfaction.
Note: This condition has been imposed to ensure that mail can be delivered to occupiers of the site. Standard Condition: F12 F.5 Swimming and Spa Pools - Permanent Child Resistant Barriers and other matters
Prior to any occupation or use of the development and prior to filling any swimming pool as defined by the Swimming Pool Act 1992:
a. Permanent child-resistant barriers must be installed in compliance with the Swimming Pools Act 1992. b. The Principal Contractor or owner must apply for and obtain a Compliance Certificate under section 24 of the Swimming Pools Act 1992. c. Public Pools must comply with the NSW Health Public Swimming Pool and Spa Pool Guidelines in force at that time and private pools are encouraged to comply with the same standards as applicable. d. Water recirculation and filtration systems must be installed in compliance with AS 1926.3-2003: Swimming pool safety - Water recirculation and filtration systems.
Backwash must be discharged to the sewer in compliance with clause 10.9 (Figure 10.2) of AS/NZS 3500.2.2:1996.
e. Water recirculation and filtration systems must be connected to the electricity supply by a timer that limits the systems operation such that it does not operate: f. before 8 am or after 8 pm on any Sunday or public holiday, or before 7 am or after 8 pm on any other day.
Note: The NSW Health Public Swimming Pool and Spa Pool Guidelines can be down loaded free from: http://www.health.nsw.gov.au/public-health/ehb/general/pools/poolguidelines.pdf Standard Condition: F13
G. Conditions which must be satisfied prior to the issue of any Subdivision Certificate
H. Conditions which must be satisfied prior to the issue of a Final Occupation Certificate (s109C(1)(c))
The following works must be completed to the satisfaction of Council, in compliance with Council's "Specification for Roadworks, Drainage and Miscellaneous Works" dated January 2003 unless expressly provided otherwise by these conditions at the principal contractor's or owner's expense:
a. stormwater pipes, pits and connections to public stormwater systems within the road; b. driveways and vehicular crossings within the road; c. removal of redundant driveways and vehicular crossings; d. new footpaths within the road; e. new or replacement street trees; f. new footway verges, where a grass verge exists, the balance of the area between the footpath and the kerb or site boundary over the full frontage of the proposed development must be turfed. The grass verge must be constructed to contain a uniform minimum 75mm of friable growing medium and have a total cover of turf predominant within the street. g. new or reinstated kerb and guttering within the road; and h. new or reinstated road surface pavement within the road.
Note: Security held by Council pursuant to section 80A(6) of the Act will not be release by Council until compliance has been achieved with this condition. An application for refund of security must be submitted with the Final Occupation Certificate to Council. This form can be downloaded from Council's website www.woollahra.nsw.gov.au or obtained from Council's customer service centre. Standard Condition: H13
H.2 Positive Covenant & Works-As-Executed certification of stormwater systems
On completion of construction work, stormwater drainage works are to be certified by a professional engineer with Works-As-Executed drawings supplied to the PCA detailing:
a. compliance with conditions of development consent relating to stormwater; b. the structural adequacy of the On-Site Detention system (OSD); c. that the works have been constructed in accordance with the approved design and will provide the detention storage volume and attenuation in accordance with the submitted calculations; d. Pipe invert levels and surface levels to Australian Height Datum; and e. Contours indicating the direction in which water will flow over land should the capacity of the pit be exceeded in a storm event exceeding design limits. f. A positive covenant pursuant to Section 88E of the Conveyancing Act 1919 must be created on the title of the subject property, providing for the indemnification of Council from any claims or actions and for the on-going maintenance of the on-site-detention system and/or absorption trenches, including any pumps and sumps incorporated in the development. The wording of the Instrument must be in accordance with Council's standard format and the Instrument must be registered at the Land Titles Office.
Note: The required wording of the Instrument can be downloaded from Council's web site www.woollahra.nsw.gov.au. The PCA must supply a copy of the WAE Plans to Council together with the Final Occupation Certificate. The Final Occupation Certificate must not be issued until this condition has been satisfied. Standard Condition: H20
All landscape work including all planting must be completed by the principal contractor or owner in compliance with the approved landscape plan, arborist report, transplant method statement and tree management plan. The principal contractor or owner must provide to PCA a works-as-executed landscape plan and certification from a qualified landscape architect/designer, horticulturist and/or arborist as applicable to the effect that the works as completed comply with this consent.
Note: This condition has been imposed to ensure that all Landscaping work is completed prior to the issue of the Final Occupation Certificate. Standard Condition: H9
H.4 Fulfillment of BASIX commitments - Clause 154B of the Regulation
All BASIX commitments must be effected in accordance with the BASIX Certificate 213473M.
Note: Clause 154B(2) of the Environmental Planning & Assessment Regulation 2000 provides: "A certifying authority must not issue a final occupation certificate for a BASIX affected building to which this clause applies unless it is satisfied that each of the commitments whose fulfilment it is required to monitor has been fulfilled." Standard Condition: H7
The principal contractor or owner must remove from the land and any adjoining public place:
a. The site sign; b. Ablutions; c. Hoarding; d. Scaffolding; and e. Waste materials, matter, article or thing.
Note: This condition has been imposed to ensure that all ancillary matter is removed prior to the issue of the Final Occupation Certificate. Standard Condition: H12
I. Conditions which must be satisfied during the ongoing use of the development
I.1 On-going maintenance of the on-site-detention system
The Owner(s) must in accordance with this condition and any positive covenant:
a. permit stormwater to be temporarily detained by the system; b. keep the system clean and free of silt rubbish and debris; c. if the car park is used as a detention basin, a weather resistant sign must be maintained in a prominent position in the car park warning residents that periodic inundation of the car park may occur during heavy rain; d. maintain renew and repair as reasonably required from time to time the whole or part of the system so that it functions in a safe and efficient manner and in doing so complete the same within the time and in the manner reasonably specified in written notice issued by the Council; e. carry out the matters referred to in paragraphs (b) and (c) at the Owners expense; f. not make any alterations to the system or elements thereof without prior consent in writing of the Council and not interfere with the system or by its act or omission cause it to be interfered with so that it does not function or operate properly; g. permit the Council or its authorised agents from time to time upon giving reasonable notice (but at anytime and without notice in the case of an emergency) to enter and inspect the land with regard to compliance with the requirements of this covenant; h. comply with the terms of any written notice issued by Council in respect to the requirements of this clause within the time reasonably stated in the notice; i. where the Owner fails to comply with the Owner's obligations under this covenant, permit the Council or its agents at all times and on reasonable notice at the Owner's cost to enter the land with equipment, machinery or otherwise to carry out the works required by those obligations; j. indemnify the Council against all claims or actions and costs arising from those claims or actions which Council may suffer or incur in respect of the system and caused by an act or omission by the Owners in respect of the Owner's obligations under this condition.
Reason: This condition has been imposed to ensure that owners are aware of require maintenance requirements for their stormwater systems.
Note: This condition is supplementary to the owner(s) obligations and Council's rights under any positive covenant. Standard Condition: I12
All landscaping must be maintained in general accordance with this consent.
This condition does not prohibit the planting of additional trees or shrubs subject that they are native species endemic to the immediate locality.
Reason: This condition has been imposed to ensure that the landscaping design intent is not eroded over time by the removal of landscaping or inappropriate exotic planting.
Note: This condition also acknowledges that development consent is not required to plant vegetation and that over time additional vegetation may be planted to replace vegetation or enhance the amenity of the locality. Owners should have regard to the amenity impact of trees upon the site and neighbouring land. Further, drought proof vegetation being native species endemic to the immediate locality is encouraged. Suggested native species endemic to the immediate locality are listed in the Brochure Titled "Local Native Plants for Sydney's Eastern Suburbs" published by Woollahra, Waverley, Randwick and Botany Bay Councils. Standard Condition: I8
All BASIX commitments must be maintained in accordance with the BASIX Certificate 213473M.
Note: This condition affects successors in title with the intent that environmental sustainability measures must be maintained for the life of development under this consent. Standard Condition: I7
No clothes, linen or the like must be hung from any balcony, terrace or veranda such that they are visible from any public place.
Reason: This condition has been imposed to ensure that the visual amenity of the neighbourhood is not detrimentally affected by a proliferation of such practices. Standard Condition: I9
a. in compliance with the Swimming Pools Act 1992 with regard to the provision of child-resistant barriers and resuscitation signs; b. in compliance with the NSW Health "Public Swimming Pool and Spa Pool Guidelines" in force at that time. Private pools are encouraged to comply with the same standards as applicable; c. in compliance with AS 1926.3-2003:Swimming pool safety - Water recirculation and filtration systems ; d. with backwash being discharged to the sewer in compliance with clause 10.9 (Figure 10.2) of AS/NZS 3500.2.2:1996, and e. with a timer that limits the recirculation and filtration systems operation such that it does not emit noise that can be heard within a habitable room in any other residential premises (regardless of whether any door or window to that room is open): o before 8 am or after 8 pm on any Sunday or public holiday, or o before 7 am or after 8 pm on any other day. Note: Child-resistant barriers, resuscitation signs, recirculation and filtration systems and controls systems require regular maintenance to ensure that life safety, health and amenity standards are maintained.
Note: The NSW Health Public Swimming Pool and Spa Pool Guidelines can be down loaded free from: http://www.health.nsw.gov.au/public-health/ehb/general/pools/poolguidelines.pdf Standard Condition: I13
Outdoor lighting must comply with AS 4282-1997: Control of the obtrusive effects of outdoor lighting. The maximum luminous intensity from each luminare must not exceed the level 1 control relevant under table 2.2 of AS 4282. The maximum illuminance and the threshold limits must be in accordance with table 2.1 of AS 4282.
Reason: This condition has been imposed to protect the amenity of neighbours and limit the obtrusive effects of outdoor lighting in public places.
Note: This condition has been imposed to control the obtrusive effects of outdoor lighting. Standard Condition: I42
Noise from the operation of mechanical plant and equipment must not exceed background noise when measured at the nearest lot boundary of the site. Where noise sensitive receivers are located within the site, noise from the operation of mechanical plant and equipment must not exceed background noise when measured at the nearest strata, stratum or community title boundary.
Reason: This condition has been imposed to protect the amenity of the neighbourhood.
Note: Words in this condition have the same meaning as in the: NSW Industrial Noise Policy ( http://www.environment.nsw.gov.au/resources/ind_noise.pdf ) ISBN 0 7313 2715 2, dated January 2000, and Noise Guide for Local Government ( http://www.environment.nsw.gov.au/noise/nglg.htm ) ISBN 1741370671, dated December 2004. Standard Condition: I53
J S Murrell
Commissioner of the Court
ljr
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated.
CSA Architects Pty Limited
Woollahra Council
CITATION : CSA Architects Pty Limited v Woollahra Council [2009] NSWLEC 1054
CASES CITED: Winten Property Group Limited v North Sydney Council [2001] NSWLEC 46 Wehbe v Pittwater Council [2007] NSWLEC 827
32 The applicant also referred to the fourth test, or fourth method I should call it, in the judgment of Wehbe v Pittwater Council [2007] NSWLEC 827, a judgment of the Chief Judge of this Court in December 2007. At paragraph 43: "The rationale is that development standards are not ends in themselves but means of achieving ends. The ends are environmental or planning objectives. Compliance with the development standard is fixed as the usual means by which the relevant environmental planning objective is able to be achieved. However, if the proposed development proffers an alternative means of achieving the objective, strict compliance with the standard would be unnecessary, it is achieved anyway, and unreasonable, no purpose would be served. The fourth way is to establish the development standard has been virtually abandoned or destroyed by the council's own actions in granting consents departing from the standard and hence compliance with the standard is unnecessary and unreasonable". 33 The respondent states that the council has not abandoned the control as such and that this is not an appropriate way to assess the application. While not determinative the evidence to the Court would appear to suggest that the FSR has been flexibly implemented in this portion of the street for approved developments. However in my assessment this in itself is not a reason to uphold the SEPP 1 objection in this case and it is not a matter that I make comment on as to whether it has been virtually abandoned.