[2024] VCAT 149
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2024-02-21
Original judgment source is linked above.
VCAT REFERENCE NOS. P38/2023 & P101/2023 PERMIT APPLICATION NO. 321/22
Planning and Environment Act 1987 ss 80 & 82; Stonnington Planning Scheme; Activity Centre Zone; Chapel Street Activity Centre; Precinct 1 (Forrest Hill); Sub-Precinct FH-2; 20-storey mixed use development; Repeat appeal; Maximum building height; Review exemptions; Jurisdiction; Whether Melbourne High School building roofline is 'confused'; Whether development has an 'overbearing presence on Melbourne High School building; Whether 'significant community benefit' can be achieved
GFM Investment Group Pty Limited in its capacity as trustee of the GFM BTS Trust Subtrust No.1
GFM Investment Group Pty Limited in its capacity as trustee of the GFM BTS Trust Subtrust No.1
671 Chapel Street & Part 1 Forrest Hill SOUTH YARRA VIC 3141
10, 11, 12, 13, 16 & 17 October 2023; 17 & 21 November 2023
Box v Stonnington CC [2024] VCAT 149
671 Chapel Street plus part 1 Forrest Hill, South Yarra
Use for dwellings, office and a community facility under clause 37.08-2 of the Stonnington Planning Scheme
671 Chapel Street plus part 1 Forrest Hill, South Yarra
For Dianna Box, Anja Wiersing, Charles Williams & Rebecca Jones
Tiphanie Acreman of Counsel, instructed by Gadens Lawyers
For GFM Investment Group Pty Limited in its capacity as trustee of the GFM BTS Trust Subtrust No.1
Nick Tweedie SC and Robert Forrester of Counsel, instructed by Rigby Cooke Lawyers
They tendered a statement of evidence dated 22 September 2023 regarding visual amenity prepared by Christopher Goss of Orbit Pty Ltd. Neither the other parties nor the Tribunal required attendance for examination.
At the start of the hearing on 10 October 2023, Julian Anderson, architect, Bates Smart Pty Ltd gave a 'design presentation' of the amended plans in the permit application.
As stated in these reasons, GFM withdrew the filed statement of lay evidence prepared by Anthony Mordini dated 21 September 2023.
Rebecca Jones (10, 11, 12, 13, 16 & 17 October 2023; 17 November 2023); In person (21 November 2023)
No appearance (10, 11 & 13 October 2023; 17 & 21 November 2023); In person (12, 16 & 17 October 2023)
Salim Bahloul (10 & 11 October 2023 & part of 17 October 2023); In person (12, 13 & 16 October 2023 & part of 17 October 2023; 17 & 21 November 2023)
Application under section 82 of the Planning and Environment Act 1987 (Vic) - to review the decision to grant a permit
Application under section 80 of the Planning and Environment Act 1987 (Vic) - to review conditions 1(b), 1(d), 1(e), 1(w), 1(x), 1(y), 1(z), 3(a), 10(a), 10(d), 10(e) & 11(a) contained in the notice of decision to grant a permit
Activity Centre Zone Schedule 1 (Chapel Street Activity Centre) ('ACZ1')
Development Contributions Plan Overlay Schedule 1 ('DCPO1')
Clause 37.08-2 (use in ACZ1 for office and dwellings if ground floor frontage exceeds two metres)
Clause 37.08-2 (use in ACZ1 for a 'community facility)
Clause 37.08-5 (construction of a building and construction or carrying out of works in ACZ1)
Clause 37.08-6 (construction of a building and construction or carrying out of works in ACZ1 which are 'not in accordance with any design and development requirement in the schedule unless the schedule to this zone specifies otherwise)
Clause 52.06-3 (to reduce the statutory requirement of 178 car parking spaces for 130 dwellings to 161 and to reduce the statutory requirement of 46 car parking spaces for office and food and drink premises to 4)
Clause 52.29-2 (to create or alter access to a road in Transport Zone 2) (being Chapel Street)
Clauses 11, 15, 16, 17, 18, 19, 37.08, 45.03, 45.06, 52.06, 52.29, 52.34, 53.18, 58, 65 and 71.02
The subject land is on the west side of Chapel Street, about 100 metres south of Alexandra Avenue. It comprises 671 Chapel Street and (abutting to its north) part of 1 Forrest Hill.
Source: Alistair Campbell, statement of evidence, p 3
671 Chapel Street is largely rectangular in shape with a frontage of 38.4 metres, a depth of 53.9 metres and an area of 2,070 square metres. Forrest Hill is the address of the land occupied by Melbourne High School ('MHS'). This land is located to the rear of 671 Chapel Street, which extends from Alexandra Avenue (to the north) to Yarra Street (to the west) to Claremont Street (to the southwest) and to Forrest Hill/Daly Street (to the southeast) ('the MHS site').
1 Forrest Hill is the address of a four-storey 21-metre maximum height building used primarily as a MHS sports centre ('the gymnasium'). It fronts Chapel Street and abuts 671 Chapel Street to its north. It is accessed from both Chapel Street and the MHS site to the rear.
The part of 1 Forrest Hill that is part of the subject land is an 'L' shaped ground-level piece at the front of the gymnasium facing Chapel Street and along the gymnasium's south boundary ('part 1 Forrest Hill'). This part has dimensions of about 3 metres depth and about 46 metres wide (fronting Chapel Street) and between about 3.4 metres and 4.4 metres wide and 53.9 metres long (along the southern boundary of the gymnasium).
671 Chapel Street is currently developed with a two-storey commercial building. Part 1 Forrest Hill is an open paved area containing a few ground level car parking spaces (facing Chapel Street) and an open paved area providing emergency access between the MHS site and Chapel Street. It provides pedestrian access to existing doors and external stairs along the gymnasium southern boundary.
In the past, 671 Chapel Street was excavated to create a generally flat site for the existing building. It now falls a relatively gentle 1.6 metres towards the northwest corner. At the northwest corner of 671 Chapel Street the land is about 6.7 metres below a steep embankment located on the MHS site.
Abutting the land to the south at 669 Chapel Street is a recently-built four-storey building occupied by the Centre for Higher Education Studies ('CHES') and used by MHS (and other) students. It is on a narrower site (about 18 metres wide) and it is built to both its north side boundary (that abuts 671 Chapel Street) and south side boundary (abutting 663-665 Chapel Street).
671 Chapel Street is encumbered by two easements - a 2.29 metres wide drainage and sewerage easement along the north boundary and a 1.83 metres wide drainage easement along the western boundary.
The subject land is located in the Forrest Hill precinct of the Chapel Street Activity Centre which is part of the Prahran/South Yarra Major Activity Centre.
The MHS site (ie neither the subject land, nor the gymnasium and CHES) is listed on the Victorian Heritage Register (VHR H1636) and is included in Heritage Overlay HO2.
On 15 November 2023 I inspected the subject land from the public realm in Chapel Street, Alexandra Avenue, Yarra Street and Claremont Street unaccompanied by the parties. This inspection included views from each of seven viewing points in photomontages prepared by Mr Goss. I had planned to conduct that inspection shortly after the hearing on 17 October 2023 but I then delayed that inspection pending determination of Dr Kirkham's reconstitution application.
On the final hearing day, I told the parties that I would be assisted by inspecting the subject land from MHS (especially in the vicinity of the boundary with the subject land and including the CHES building) and from apartment 701 at 663-665 Chapel Street, which directly faces the subject land across and above the CHES roof. The parties agreed these inspections could be unaccompanied, if the relevant representatives providing access to MHS and apartment 701 observed the Tribunal's normal inspection protocols. Those undertakings were given and observed. Those inspections took place on 6 December 2023.
The [part 1 Forrest Hill] land is owned by the Department of Education and Training and forms part of a public school (MHS). The Planning Scheme is not binding on the use or development of land carried out by or on behalf of the Minister for Education.
Figure 1: Entry to level 1 from MHS site. Source: Julian Anderson, 'design presentation', 'West Podium - Community Hub Entre - Artist's impression only', p 39.
[T]he Applicant proposes to explore opportunities [for the community asset to] be used by ... other educational, training providers and not-for-profit organisations consistent with the Department of Education & Training's Schools as Community Facilities - Policy Framework and Guidelines.
(a) MHS use of the community facility is opposed by, and will not be permitted by, either the Minister for Education or Department of Education.[15] Although Ms Box did not expressly refer to 'futility', Ms Box's inference was that granting permission to use the subject land for a community facility was futile because MHS would not obtain the necessary permission.
(b) It is unclear how MHS would lease or own the community facility and how it would fund the fit out of the facility for education purposes.
(c) The design of the community facility is unsuitable for use by groups other than MHS, primarily through poor access from Chapel Street.
(a) the new application has not materially changed from the application rejected by the previous Tribunal or does not respond to shortcomings identified by the previous Tribunal, and
(b) there are no changes to relevant circumstances that might explain why a similar application should now be favourably considered such as a change in the physical context or a change in the relevant planning scheme.
The Tribunal, in exercising its review jurisdiction exercises the functions of the responsible authority as the decision maker.[34]
Any contractual or other arrangements between [MHS] and [GFM] (and any of its associated entities that may be internationally based) are irrelevant to [the proceeding]. The identity of [GFM] or arrangements it enters into are not relevant matters for the Tribunal nor is it open to the Tribunal to consider them.[37]
There is no question of federal jurisdiction genuinely raised by these submissions.[38]
(a) the proposal's privacy, disability and amenity impacts that will be visited upon many people;
(b) the Tribunal's failure to offer an online hearing format and therefore restricting participation in the proceeding; and
(c) the Council's failure to respect privacy.
The preferred maximum building height may be exceeded in some circumstances if:
... [W]e do not agree with Ms Peterson that the provision of the space for any community activity would necessarily be appropriate and result in significant community benefit.
I therefore accept that MHS is part of the relevant community even if some or most students and staff reside outside the Stonnington municipal district. If the primary user is MHS or others allowed by MHS for school or educational related activities, the primary use is use by the community. It does not defeat the concept of benefit to the community if secondary use by others is not identified and detailed in an applicant's proposal.
Third, the Council's contention does not give sufficient weight to other conditions relevant to use of the community facility that GFM does not challenge.
Condition 11 requires the owner to prepare a Community Facility Management Plan (a 'CFMP') to the Council's satisfaction before the use commences.[49] It must provide 'operational details'. These details can be as fulsome as the Council considers are necessary to ensure the benefit is significant. When approved, the community facility must operate in accordance with the CFMP. If it not operated in that way, there may be a breach of the permit and the permit could be enforced by the Council.
Condition 11(b) states these details may include 'the proposed hours in which the Facility will be available to the public for community use'. The word 'public' suggests that the Council intended that to mean available to users other than MHS, although it may be said that students and staff of MHS are part of the 'public'.
In any event, the condition allows the Council to determine (as part of the CFMP) the hours in which use by MHS and others may occur. This allows the Council to ensure MHS use does not unreasonably limit times for other use, as well as ensuring overall hours are an acceptable planning outcome, and compatible with condition 11(f) regarding 'managing noise and amenity complaints'.
Other conditions strengthen arrangements for non-MHS use of the community facility. For example, condition 10(c) requires a registered agreement to be entered into before the development starts that provides for allowing 'public access free of charge' to the community facility. In other words, MHS could not manage the community facility in such a way as to deter non-MHS use by fees and charges.
Fourth, the community facility is not the only element of the proposal that is a benefit. While I do not need to make a finding about whether each and every feature of the proposal is a benefit or a community benefit and to what extent, I am content to find the proposal will be a benefit in helping to achieve the objectives for the AC.
(a) The proposal's maximum height is 65.5 metres[51] and exceeds the preferred maximum height of 38 metres.
(b) The proposal's street setback is three metres, which is the preferred setback.
(c) The proposal's street wall height is 12.2 metres and exceeds the preferred maximum height of 12 metres.
(d) The proposal's setback above the street wall is between three metres and six metres and is less than the preferred setback of 12 metres.
(e) The proposal's setback from side and rear boundaries above the podium is six metres from the northern boundary of 671 Chapel Street, between 4.8 metres and 7.4 metres from the rear boundary, and six metres from the southern boundary. The preferred setback is six metres.
(f) The proposal's upper level setback between towers above the street wall is about 24 metres (to the towers to the south at 661 & 663-665 Chapel Street) and the preferred setback is 12 metres.
To provide tall, slender building forms rather than bulky, monolithic buildings in order to minimise visual bulk.[57]
Figure 2: View of proposal from Yarra Street. Source: Chris Goss, statement of evidence, photomontage 06.04.
Figure 3: View of proposal from Chapel Street. Source: Chris Goss, statement of evidence, photomontage 04.03.
Ensure new buildings do not confuse the [MHS] building roofline as viewed from Yarra Street, at a point directly perpendicular to the midpoint of the main hall.[60]
Figure 4: Existing view from Yarra Street. Source: Chris Goss, statement of evidence, photomontage 06.01.
Figure 5: Existing and proposed views from Alexandra Avenue. Source: Chris Goss, statement of evidence, photomontages 07.01 and 07.02 showing existing (left) and proposed (right) views from Alexandra Avenue.
Avoid buildings having an overbearing presence on the [MHS] building.[62]
(a) the gymnasium;
(b) the substation, which is located about three metres from the southern part of the rear boundary of the subject land; and
(c) the more recent (non-heritage significant) classroom building behind the southern wing of the 1920s building, which is located about six metres from the northern part of the rear boundary of the subject land, and which is oriented away from the rear boundary.
Figure 6: Images of proposed building in previous decision. Source: Chris Goss, statement of evidence in previous decision, photomontages 2 and 3 from Yarra Street (left) and from Alexandra Avenue (right).
The preferred maximum building height may be exceeded in some circumstances if:
For sites ... adjoining a Heritage Overlay, appropriately respond to the heritage significance of the heritage place.[68]
Where built form has a sensitive interface [or] is ... adjoining land in the Heritage Overlay, setbacks greater than the preferred minimum setbacks at Clause 5 should be provided'.[69]
Ensure an appropriate setting and context for heritage places is maintained or enhanced.[70]
Figure 7: Massing of MHS central tower and the proposal. Source: Julian Anderson, Design Presentation p 17.
(a) MHS is not a party to the proceeding, or
(b) the community facility cannot be satisfactorily adapted for MHS use on the withdrawal of Dr Mordini's written statement.
(a) the value of the streetscape upgrades;
(b) the value of the community facility to non-MHS users based on an assumed availability for 50% of the time over the course of a year; and
(c) a cash contribution of $500,000 offered by GFM and included by way of requirement in condition 10(a),
'to represent a significant community benefit to satisfactorily offset the proposed increase sought by the application' (i.e. as sought in the decision plans).[83]
MHS use is unlawful and is based on public misconduct
(a) MHS use of the community facilities was unlawful, was not supported by and could not obtain the necessary support of either the Authority, the Department or the Minister for Education.
(b) Dr Mordini's role in securing the agreement with GFM amounted to public misconduct.
The only matters which the Tribunal can legitimately take into account are those which are set out in section 84B of the P&E Act. The alleged arrangements between Melbourne High School and the permit applicant do not fall within any of the categories set out in section 84B. Again, the matters raised by Dr Kirkham are not capable of legal argument in the context of a planning review. Moreover, the Tribunal would fall into error if it were to consider extraneous matters such as those urged upon it by Dr Kirkham.[84]
(a) the facility was at the rear of the subject land (being a significant distance from Chapel Street) and therefore would be difficult to find;
(b) access along the walkway on the north side of the ground floor residential lobby was not wide enough for wheelchair traffic (or other people with other mobility needs);[85] and
(c) the single lift access, albeit designed for disability access, was not sufficient for use by a significant number of people with disabilities.
Prior to the occupation of the development, make a monetary contribution to Council for the amount of $500,000 for the purpose of Council's Chapel Street Transformation Project (or similar) in exchange for the agreed building height.
Further fund the streetscape and public realm works in front of the site and in front of the adjoining site to the north at 1 Forrest Hill as shown on the endorsed plans.
The responsible authority must not include in a permit a condition requiring a person to pay an amount for or provide works, services or facilities except -
(a) in accordance with subsection (5), section 46N(1) or 46GV(7);
...
In deciding to grant a permit, the responsible authority may:
(b) include a condition requiring specified works, services or facilities to be provided or paid for in accordance with an agreement under section 173; or
...
... includes a number of initiatives relating to improving the public realm and open space of the Chapel Street Activity Centre and has informed several public realm and open space projects listed within the DCP.[91]
To ensure the built form, design and layout of development does not generate unacceptable wind impact within the site or on surrounding land.[97]
To reduce wind turbulence at ground or podium level through using appropriate building forms and articulation of the building mass.[98]
(a) Condition 12 in the notice of decision, which requires further analysis to the Council's satisfaction in confirming 'that all measures specified in the [2022] report have been implemented in accordance with the approved plans'.
(b) Condition 1(a) in the notice of decision, which requires modifications to some apartment balconies in the northwest corner of the building and some other mitigation measures in the wind analysis to achieve the comfortable conditions standards in clause 58.
... effectively decrease the volume of redirected wind towards the lower levels [and the] reduction [in height] will significantly contribute to improving overall wind conditions.[99]
Provision of a continuous canopy along the building frontage for weather protection.
(a) The Council's acceptance that the tower setback from the rear boundary is a satisfactory response to the previous decision and the guidelines.
(b) MHS's view as to whether the proposal would remove opportunities for equitable development opportunities. Having received notice of GFM's permit application and not objecting to the Council, having prepared a short statement in support of the proposal, and not participating in this proceeding, MHS's acceptance may be implied.
(c) Although the MHS site has heritage constraints that would restrict construction of buildings west of the 1920s main building, the MHS site is large and there are opportunities for new buildings to the west and south-west of the subject land, even if some demolition (e.g. of the electrical substation) might be involved.
(a) It is policy to achieve building design and siting outcomes that support environmentally sustainable development.[112] The policy sets out strategies around energy performance, resource recovery, use of recycled materials, water efficiency, stormwater and landscaping.[113]
(b) It is a policy objective to 'achieve best practice in environmentally sustainable development from the design stage through to construction and operation'.[114]
(c) It is a policy strategy to 'facilitate development that minimises environmental impacts' and to encourage environmentally sustainable development that 'adopts best practice through a combination of methods, processes and locally available technology that demonstrably minimise environmental impacts', particularly in the areas of energy performance, integrated water management, indoor environment quality, transport, waste management, and urban ecology.[115]
(d) For a 'mixed use' development (such as the proposal), it is policy to 'consider, as relevant' various specified tools such as Built Environment Scorecard ('BESS'), Green Star, the Nationwide House Energy Rating Scheme ('NatHERS') and Model for Urban Stormwater Improvement Conceptualisation ('MUSIC') to support a sustainability management plan ('a SMP').[116]
The building has generally been designed with the intent of meeting the objectives of Council's ESD Policy at Clause 22.05 and Stormwater Management (WSUD) Policy at Clause 22.18, as outlined in the submitted Sustainability Management Plan (SMP). The development incorporates a number of good ESD commitments including:
Council's ESD Officer is supportive of the proposal, subject to conditions of permit which seek to ensure that the development will achieve an appropriate sustainable design outcome. These conditions are included within the recommendation.
(a) Updated daylight modelling, inclusive of but not limited to levels 3, 7, 12, 13 and 20, demonstrating that a minimum of 80% of the living rooms and bedrooms in the development meet the BESS (Built Environment Sustainability Scorecard) Best Practice Standard for daylight. > > (b) External shading devices to north and west facing glazing. > > (c) Preliminary NatHERS certificates provided for one apartment on each level assessed (apartment L12-05-2D, L19-01-3A and L21-01-3E). > > (d) Provision of Carbon Monoxide (CO) monitoring to the basement carpark. > > (e) A brief statement outlining construction measures to prevent litter, sediments and pollution entering the stormwater system. The statement should include the types of measures required to be implemented on site (such as adoption of 'Keeping our stormwater clean' guide by Melbourne Water and typical measures suggested). > > (f) A brief statement outlining operational and maintenance measures to check the effective operation of all stormwater systems. > > (g) Demonstrate how Best Practice measures from each of the 10 key Sustainable Design Categories of Stonnington Council's Sustainable Design Assessment in the Planning Process (SDAPP) have been addressed. > > (h) Identify relevant statutory obligations, strategic or other documented sustainability targets or performance standards. > > (i) Document the means by which the appropriate target or performance is to be achieved. > > (j) Identify responsibilities and a schedule for implementation, and ongoing management, maintenance and monitoring. > > (k) Demonstrate that the design elements, technologies and operational practices that comprise the SMP can be maintained over time.
All works must be undertaken in accordance with the endorsed Sustainability Management Plan to the satisfaction of the Responsible Authority. No alterations to the Sustainable Management Plan may occur without the written consent of the Responsible Authority.
(a) proceeded on the basis that the planning scheme identified the Green Star tool as acceptable in determining what is best practice having regard to industry practice;
(b) was based on a thorough consideration of all current relevant factors in a proposal to be assessed under the tool;[129] and
(c) reasonably concluded that the proposal could achieve a Green Star rating that exceeded 'best practice' for buildings.
On an overall development basis, the proposal development complies with BESS daylight performance standards as:
14 rooms (Apartments 302, 306, 307, 308, 406, 407, 408, 506, 507, 508, 1008, 1108, 1206 & 1207 kitchen/living areas) have minor daylight constraints with more than 60% of each room exceeding the threshold 1% daylight factor.
Based on these results, in my opinion, the daylight levels within all habitable rooms will be satisfactory and will contribute to good internal amenity for future residents.
Condition 3 of the Council's decision did, however, overlook including a sub-condition requiring details of all relevant design initiatives that enable achievement of a Five Star Green Star Building rating. To mandate achievement, I will include a condition to that effect.
... should endeavour to integrate the range of planning policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations.[142]
(a) In the conditions review for the permission to use the subject land for the purpose of the three uses, including the community facility, and for permission for access to Chapel Street, I will modify the conditions and direct that a modified permit be issued.
(b) In the merits review, I will vary the decision to grant permission for buildings and works and for the car parking reduction and direct the issue of those permissions subject to varied conditions.
671 Chapel Street & Part 1 Forrest Hill SOUTH YARRA VIC 3141
(a) Any changes and annotations on ESD commitments required by Condition 4 (Sustainable Management Plan).
(b) Detailed dimensioned façade details (sections/plans) are to be proved demonstrating the effectiveness of the external shading strategies to the north, east and west facing glazing to habitable rooms. These details must prevent passive solar gain in summer while enabling warming winter sun access and ensure windows are shaded from the spring equinox till the autumn equinox (21 September to 21 March). For north facing glazing a fixed overhang (such as an eave) depth should measure 25% of the height from the window sill to the bottom of the shading device.
(c) Allocation of bicycle parking spaces to residential, office, retail and visitors.
(d) Landscaping within pedestrian sight triangles adjacent to the exit lane limited in height to 900mm.
(e) Doors to the sub-station designed to not encroach the access aisle when in the open position.
(f) The 'community asset' on level 1 notated as 'community facility'.
(g) The DDA lift opening directly to the community facility and not to the pool lift as shown on the plan prepared by Bates Smart Architects drawing TP03.01 rev D with a plot date of 10 October 2023.
(h) An internal stair in the community facility leading to the emergency door to the residential lobby, generally in accordance with the plan prepared by Bates Smart Architects drawing TP03.01 rev D with a plot date of 10 October 2023.
(i) An indicative location of a kitchenette and amenities within the community facility, notated as subject to change in fit out.
(j) Screening between terraces on level 03.
(k) 50% of dwellings with at least one adaptable bathroom that meets all of the requirements of either Design A or Design B specified in Table D7 of clause 58.05-1 of the Stonnington Planning Scheme.
(l) The type and location of lighting to car parking and internal accessways.
(m) Allocation of external storage within the basement levels and at level 01 to dwellings as required to demonstrate compliance with Standard D21 at clause 58.05-4 of the Stonnington Planning Scheme.
(n) A setback of penthouse 1 on level 19 no less than 7.4 metres from the rear boundary.
(o) Any changes required by Condition 7 (Green Travel Plan).
(p) Any changes required by Condition 8 (Landscape Plan).
(q) Any changes required by Condition 10 (WMP).
(r) Any changes required by Condition 13 (CFMP).
(s) Any changes required by Condition 14 (Wind)
(t) Any changes required by Condition 16 (Façade Strategy).
All these modifications to the plans must be to the satisfaction of the Responsible Authority.
(a) External shading devices to north and west facing glazing.
(b) The measures and specifications set out and assumed for the purposes of modelling and assessment in the witness statement of Jan Talacko dated 14 August 2023.
(c) Preliminary NatHERS certificates provided for one apartment on each level.
(d) Details of the Photovoltaic (PV) total capacity and inclination angle (from horizontal) the panels are to be installed.
(e) Provision of Carbon Monoxide (CO) monitoring to the basement carpark.
(f) A brief statement outlining construction measures to prevent litter, sediments and pollution entering the stormwater system. The statement should include the types of measures required to be implemented on site (such as adoption of 'Keeping our stormwater clean' guide by Melbourne Water and typical measures suggested).
(g) A brief statement outlining operational and maintenance measures to check the effective operation of all stormwater systems.
(h) Details of the sustainable design initiatives that achieve a Five Star Green Star Building rating (pursuant to Green Star - Buildings v1).
(i) Demonstrate how Best Practice measures from each of the 10 key Sustainable Design Categories of Stonnington Council's Sustainable Design Assessment in the Planning Process (SDAPP) have been addressed.
(j) Identify relevant statutory obligations, strategic or other documented sustainability targets or performance standards.
(k) Document the means by which the appropriate target or performance is to be achieved.
(l) Identify responsibilities and a schedule for implementation, and ongoing management, maintenance and monitoring.
(m) Demonstrate that the design elements, technologies and operational practices that comprise the SMP can be maintained over time.
All works must be undertaken in accordance with the endorsed Sustainability Management Plan to the satisfaction of the Responsible Authority. No alterations to the Sustainable Management Plan may occur without the written consent of the Responsible Authority.
(a) Updates to the Public Realm Enhancement Works plan as shown on the drawing TP06 revision E prepared by Jack Merlo dated 23 June 2023, to show details of the pavement along the Chapel Street frontage and the northern boundary of the subject land (such as material, size and pattern), and details of any street furniture and street tree planting, to the satisfaction of the Responsible Authority.
(b) Soil volume details of all planter boxes.
(c) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant and irrigation details for all planting.
(d) The extent of any cut, fill, embankments or retaining walls associated with the landscape treatment of the site.
(e) Details of all proposed hard surface materials including pathways, patio or decked areas.
(f) Relocation or removal of the planter box shown on drawings TP01 and TP04 in the location of the entry to the commercial lobby from Chapel Street.
(g) Deletion of landscaping works shown within Melbourne High School site to the west of the subject land.
(a) Organic waste generation rates revised to match 'Sustainability Victoria Better Practice Guide for Waste Management and Recycling in Multi-unit Development' allocation - 35% of garbage is comprised of organics. The size and number of organic waste bins required is to be amended accordingly.
(b) The designated bin stores to allow space for glass recycling as per 'Recycling Victoria Guidelines', should such a service be available in the future.
(c) Retail organic waste generation rates revised to match 'Sustainability Victoria Better Practice Guide for Waste Management and Recycling in Multi-unit Development' allocation - 73L per full time equivalent.
(d) The location of the hard waste collection area is to be clearly signed and communicated to residents and tenants.
(e) Waste collection times to match the 'VIC EPA Noise Control Guidelines' which restrict collections occurring more than once a week to between 7am to 6pm Monday to Saturday for residential waste collection, and 7am to 8pm Monday to Saturday for industrial waste collection.
(f) Information regarding how commercial tenants will transfer their waste into the bin room.
(g) Details of the way all residential tenants will dispose of their organic waste.
(h) Use of 240L bins for organic waste.
Waste collection from the development must be in accordance with the Waste Management Plan, to the satisfaction of the Responsible Authority.
(a) Further fund the streetscape and public realm works in front of the site at 671 Chapel Street and in front of the adjoining site to the north at 1 Forrest Hill as shown in the endorsed plans.
(b) Allow public access free of charge to the Community Facility located on Level 1 of the building as shown on the endorsed plans and in accordance with the Community Facility Management Plan referenced in Condition 12.
(c) Maintain access to the Community Facility as shown on the endorsed plans and to a standard that is safe and fit for public access to the satisfaction of the Responsible Authority.
(d) Costs for construction of the Community Facility are to be borne by the landowner.
(a) The responsibility for the management of the Facility.
(b) The proposed hours in which the Facility will be available to the public for community use.
(c) Accessibility and wayfinding signage to access the Facility from the public realm.
(d) Measures to ensure security of the Facility and safety of users.
(e) Arrangements and responsibilities for the cleaning and maintenance of the Facility.
(f) How noise and amenity complaints from the Facility will be managed.
(g) How users of the Facility will be made aware of minimising noise from the premises.
(h) Details of public liability insurance.
The use of the Facility must operate in accordance with the Community Facility Management Plan to the satisfaction of the Responsible Authority.
(a) A concise description by the architect of the building design concept and how the façade works to achieve this.
(b) Example prototypes and/or precedents that demonstrate the intended design outcome as indicated on plans and perspective images, to produce a high-quality built form outcome in accordance with the design concept.
(c) A schedule of colours, materials and finishes, including the colour, type and quality of materials showing their application and appearance and confirmation that no material will have more than 20% reflectivity or otherwise to the satisfaction of the Responsible Authority.
(d) Detailed elevations showing the location of the proposed materials, colours and finishes, building details, entries and doors, utilities and any special features.
(e) Cross sections or other method of demonstrating the façade systems, including fixing details indicating junctions between panels.
(f) Information about how the façade will be accessed, maintained and cleaned, including details of the ongoing maintenance, inspection and where necessary treatment of the façade.
The provisions, recommendations and requirements of the endorsed Façade Strategy must be implemented and complied with to the satisfaction of the Responsible Authority.
(a) A preliminary risk screen assessment statement in accordance with the Environment Protection Act 2017 must be issued stating that an environmental audit is not required for the use or the proposed use; or
(b) An environmental audit statement under Part 8.3 of the Environment Protection Act 2017 must be issued stating that the land is suitable for the use or proposed use.
Before the building is occupied all the conditions of the Statement of Environmental Audit must be complied with to the satisfaction of the Responsible Authority.
(a) The contact name and phone number(s) of the site manager.
(b) Bulk excavation.
(c) Management of the construction site.
(d) Hours of construction, including program/duration of works.
(e) Control of noise, dust, water and sediment laden run-off.
(f) Public safety.
(g) Traffic management.
(h) Construction vehicle road routes and measures for construction vehicles to safely enter and exit the site.
(i) Largest vehicles expected to the site.
(j) Soiling and cleaning of roadways.
(k) Security fencing, disposal of site waste and any potentially contaminated materials.
(l) Crane locations during construction.
(m) Site offices and amenities and areas for storage of wastes
(n) Onsite staff and contractors' car parking.
(o) Redirection of any above or underground services; and
(p) Site lighting during any night works.
(q) Other matters as may be required by the Responsible Authority.
(a) The development is not started within three years of the date of this permit.
(b) The development is not completed within five years of the date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987, a request may be submitted to the Responsible Authority within the prescribed timeframes for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, the material in the proceeding Tribunal Book, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all this material will be cited or referred to in these reasons.
[2] I will not include this notice as part of these reasons, but it can be accessed online as an appendix to the Tribunal's earlier orders dated 26 May 2023 in Box v Stonnington CC [2023] VCAT 598.
[3] The orders with published reasons were Box v Stonnington CC [2023] VCAT 289, Box v Stonnington CC [2023] VCAT 598, Box v Stonnington CC [2023] VCAT 715 and Box v Stonnington CC [2023] VCAT 1258.
[4] Order 2 of the orders dated 19 October 2023.
[5] This is in accordance with how building height is to be measured under the planning scheme in clause 4.4 of ACZ1 i.e. from natural ground level to the top of the roof. It is the figure adopted by the Council and not disputed by the parties. Mr O'Dwyer adopted a more conservative approach and, in adopting a building height of 65.5 metres, measured from the lowest natural ground level of RL 8.45 metres in the southeast corner of the land at Chapel Street to the roof of level 19.
[6] Again, this is the figure adopted by the Council and not disputed by the parties. Again, Mr O'Dwyer adopted a more conservative approach and, in applying the same measuring point, adopted a height of 12.5 metres.
[9] It is apparent the deck is removable because it is located above an easement.
[10] This balustrading is not apparent in figure 1.
[11] For completeness, pedestrian access to the lift is also available from the proposed path along the south side of the gymnasium.
[12] As is common (and perhaps unfortunate) current practice, the conditions included in the grant of permission do not expressly identify which are attached to each permission.
[14] For completeness, a decision on an application under clause 52.29 is exempt from review.
[15] In paragraphs 48 to 55 and Appendix B of the written submissions on behalf of Ms Box dated 3 October 2023, she relies on documents released under the Freedom of Information Act 1982 (Vic). One of those documents shows that the Department (through the Victorian Schools Building Authority) informed the Minister on 4 August 2021 that it did not support 'gifting' space in the building to MHS because the Authority should not 'facilitate a planning outcome for a private developer' and there would be ongoing owners corporation costs.
[16] [2023] VSC 658 (16 November 2023) ('Myers').
[17] Ibid [71], [101], [148], [149], [152].
[18] Ibid [26]-[27], [148], [149], [152].
[19] It is to be recalled that, for example, there would be differences between the permissions, if only because the use permission would be in relation to the decision plans and the buildings and works permission (and the parking permission) would be in relation to the substituted plans. As the Court in Myers said at [158] and [168], any difficulty of that type can be overcome by the Council by endorsement of amended plans under condition 1 of the permit for the three uses or by amendment of the permit to use the subject land for the three purposes under PE Act s 72. I would add that for practical reasons relating to administration of the permits, the Council should consider giving the two permissions different numbers. For example, the Council may decide to issue the modified permit to use the subject land for the three purposes and for access with the number 0321/22.1 and to issue the permit for buildings and works and parking variation with the number 0321/22.2.
[21] I will not set out the numerous grounds relied on by respondents but they include those relied on by Ms Box. But one submission made by Dr Kirkham warrants mention. Dr Kirkham claims there is no benefit to MHS in the community facility having regard to MHS's educational needs and there cannot therefore be a significant community benefit. I cannot consider those claims.
[25] C&L International Holdings Pty Ltd v Stonnington CC [2019] VCAT 69 ('C&L International').
[27] Written submissions on behalf of the Council [86]. It is unnecessary to refer to these amendments for the purposes of these reasons.
[28] C&L International above n 25 [18]-[27].
[30] Box v Stonnington CC [2023] VCAT 1258 [12].
[33] These included reference to sections 8, 9, 12 and 28 of the LG Act. He also submitted the Tribunal 'may want to consider' sections 88, 89 and 106 of that Act.
[34] Sweetvale Pty Ltd v VCAT [2003] VSCA 83 [17].
[36] Box v Stonnington [2023] VCAT 715 [13].
[42] Box v Stonnington CC [2023] VCAT 289 [51]-[54].
[43] Leon Park Pty Ltd v Mornington Peninsula SC [2022] VCAT 1373 [21].
[44] See Box v Stonnington CC (unreported, 9 May 2023) (Practice Day Hearing).
[45] Planning scheme cl 37.08 sch 1 cl 4.4.
[46] Closing written submissions on behalf of the Council [8].
[47] Written submissions on behalf of the Council [109].
[48] It is to be recalled that the notice of decision is made on the decision plans and that the substituted plans do not apply to the conditions review in relation to the community facility. Ultimately, this is not determinative because the plans are consistent in the size, location and access for the community facility.
[49] The 'use' in the context of this condition must be use for the facility and not the uses otherwise permitted by the Council's decision ie the dwellings and office.
[50] For completeness, there is a second path to the dedicated lift along the southern edge of the gymnasium on the part 1 Forrest Hill land. It involves descending some stairs and crossing the vehicle drop off and pick up and so it is unclear to what extent it would be used.
[51] As measured from the lowest natural ground level of RL 8.45 metres in the southeast corner of the subject land at Chapel Street to the roof of level 19.
[52] This depends on whether the Council's calculation or Mr O'Dwyer's calculation is adopted.
[53] Context is relevant - see planning scheme cls 15.01-1S, 15.01-2S.
[54] Closing submissions on behalf of GFM [6].
[55] The four-storey MHS gymnasium would theoretically have redevelopment potential, but its particular circumstances make it less likely to be redeveloped in the foreseeable future.
[56] Including acknowledging that the preferred maximum height 'may not be achievable on every site, particular smaller sites and/or constrained sites' (planning scheme cl 37.08 sch 1 cl 4.4 'Height and massing requirements' where second appearing, dot point 1. I do not consider the subject land to be either a smaller site or a constrained site. The only relevant constraints are those relating to context or the planning scheme, which are constraints affecting all sites.
[57] Planning scheme cl 37.08 sch 1 cl 5.1-2 dot point 20.
[58] The oblique view is more relevant than from directly opposite because the viewing point for the latter is too close to get a proper appreciation.
[59] Planning scheme cl 37.08 sch 1 cl 4.4 'Views and landmarks guidelines'.
[60] Ibid cl 37.08 sch 1 cl 5.1-4 'Within Sub-Precinct FH-2' dot point 1.
[61] Ibid cl 37.08 sch 1 cl 5.1-1. In the previous decision at [43]-[44], the Tribunal referred to the viewline as the 'crucial' viewpoint and I agree with that description.
[63] C&L International above n 25 [41].
[64] Alistair Campbell, statement of evidence [79]-[81].
[65] Planning scheme cl 37.08 sch 1 cl 4.4 'Height and massing requirements' where first appearing, dot point 2.
[66] Ibid cl 37.08 sch 1 cl 4.4 'Overshadowing requirements', 'Overshadowing guidelines' and Precinct Maps at cl 5.1 and cl 5.1.3.
[68] Ibid cl 37.08 cl 4.4 'Heritage sites guidelines'.
[69] Ibid cl 37.08 cl 4.4 'Interface setback guidelines' dot point 5.
[70] Ibid cl 15.03-1S, Strategies, dot point 7.
[71] C&L International above n 25 [78].
[75] See e.g. Bensons Property Group Pty Ltd v Stonnington CC [2017] VCAT 2155 [38]-[39], [42], although that case concerned the provision when it was characterised as a guideline rather than a requirement, and this qualification was considered in some later cases, including Healthscope Operations Pty Ltd v Stonnington CC [2019] VCAT 1155 [51], [56] and what I have described in these reasons as the 'previous decision'.
[77] For example, GFM pointed out that there are Supreme Court and Tribunal cases in which it was held that additional housing could be a benefit in a building that exceeds a discretionary height limit. GFM said these cases include W Property Group v Boroondara CC (Supreme Court of Victoria, Cavanough J, 6 March 2018) [in this case, at part 3143 of the Tribunal Book]; W Property Group Pty Ltd v Boroondara CC [2017] VCAT 1238; ATJ Holdings Pty Ltd v Yarra CC [2019] VCAT 1189 at [57]; San Domenico Pty Ltd v Stonnington CC [2022] VCAT 909; Queens Avenue Developments Pty Ltd v Boroondara CC [2018] VCAT 629. Nonetheless, I must be cautious in applying these authorities because all, except San Domenico, related to provisions in other planning schemes that differed from clause 4.4.
[78] It will be recalled that the assessment in the condition review relating to the use permission involved an assessment of the application including the decision plans, although I found there was little material difference with the substituted plans.
[79] Internal stairs for this door were shown on the decision plans, which supports the conclusion that they were inadvertently omitted in the preparation of the substituted plans.
[80] In accordance with the rule of evidence in Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298. Although the Tribunal is not bound by the rules of evidence (Victorian Civil and Administrative Tribunal Act 1998 (Vic) s 98(1)(b)), I would consider this rule on this point in this proceeding.
[81] Closing written submissions on behalf of GFM [44]
[82] Box v Stonnington CC [2023] VCAT 598 [25].
[83] Officers' report, Tribunal Book p 900.
[84] Box v Stonnington CC [2023] VCAT 715 [22].
[85] The occasional planters on the south side of the walkway shown on Mr Merlo's landscape plan mean the minimum width is about one metre.
[86] It is relevant to observe that other contributions may separately be required. If the building in the proposal were to be constructed and subdivided to facilitate the sale of apartments, a public open space contribution would be payable under clause 53.01 of the planning scheme. The contribution is not tied to permission to construct a building that exceeds the preferred maximum building height.
[87] Written submissions on behalf of the Council [71]-[72].
[88] Officers' report, Tribunal Book p 900.
[92] Amanda Ring, statement of evidence [256].
[94] I have not taken into account access to the nearby MHS oval because that is not 'public' open space, even though on my inspection I saw public use of the oval for dog walking.
[95] Amanda Ring, statement of evidence [256].
[96] City of Stonnington General Local Law No. 1 2018 (as amended).
[98] Ibid cl 37.08 sch 1 cl 5.1-2 dot point 17.
[99] RWDI Australia Pty Ltd, memorandum 10 July 2023 p 1.
[100] RWDI Australia Pty Ltd, Pedestrian Wind Study 671 Chapel Street, South Yarra, 5 September 2022 p 8.
[101] The nearest balconies at 661 Chapel Street are not directly below the two points but are at least 10 metres to the west.
[102] Planning scheme cl 37.08 sch 1 cl 4.4 'public realm interface guidelines' dot point 10.
[103] Ibid cl 37.08 sch 1 cl 5.1-2 'precinct objectives' dot point 15.
[104] Written submission on behalf of the Council [152]-[153].
[105] C&L International above n 25 [106].
[106] Planning scheme cl 37.08 sch 1 cl 4.4.
[108] The Council's decision required carbon monoxide monitoring in the basement (condition 1(l)), allocation of bicycle parking spaces (condition 1(m)), EV charging infrastructure in the basement (condition 1(n)), dimensioned basement entry headroom (condition 1(q)), provision of a bollard next to the accessible car space (condition 1(s)), dimensions of basement support columns (condition 1(t)), details of basement substation doors and bicycle parking dimensions (condition 1(v)). None of these conditions is in dispute.
[109] John Kiriakidis, statement of evidence, p 19.
[110] Planning scheme cl 37.08 sch 1 cl 5.1-2, dot points 7 & 8.
[111] Amendment C139 to the Stonnington Planning Scheme, prepared in 2012 but subsequently lapsed - see John Kiriakidis, statement of evidence, p 13.
[112] Planning scheme cl 15.01-2S 'Objective'.
[114] Ibid cl 15.02-1L-02 'Objective'.
[115] Ibid cl 15.02-1L-02 'Strategies'.
[119] See eg objectives for energy efficiency in cl 58.03-1 of the planning scheme.
[120] Stantec Australia Pty Ltd, Sustainability Management Plan, 6 May 2022.
[121] Mr Talacko recommended a notation on the plans to ensure best practice for re-use of harvested rainwater by specifying connection to all toilets in all apartments on levels 3 to 9. The parties did not oppose that recommendation. I have not included it in the SMP condition because it appears the condition can include that requirement without specific mention.
[122] Jan Talacko, statement of evidence, p 5.
[124] Although he did not define that term, I will take it as a reference to 'environmental and sustainability claims which are false, misleading, or have no reasonable basis': ACCC, Environmental and sustainability claims - Draft guidance for business (July 2023). Dr Kirkham included a checklist of indicia of 'greenwashing' from United Nations climate science publications.
[125] In his closing submissions, Dr Kirkham also contended that the basement car spaces needed more space, comprising an extra 900 mm in width and two metres in depth. He then submitted that provision of EV charging spaces (as outlined in the SMP and condition 1(n)) is not a 'green' (which I take to mean, an ESD) initiative, when the fire risk is considered. As I have stated, that risk is no basis to refuse planning permission.
[126] Knox City Council v Tulcany Pty Ltd [2004] VSC 375 [13(d)].
[127] Dr Reuben Kirkham, closing written submissions [27].
[128] Practice Note PNVCAT2 Expert Evidence (8 December 2022).
[129] Jan Talacko, statement of evidence, Appendix B.
[130] Box v Stonnington CC [2023] VCAT 1258 (Woodward J, President) (13 November 2023).
[137] I record what appears to be a typographical error in condition 1(c), with its reference to 'visible' rather than 'visual' light transmittance. I also record that condition 3(a) includes a reference to 'level 20' which was relevant for the decision plans but does not exist in the substituted plans.
[139] Written submissions on behalf of the Council [169].
[140] Jan Talacko, statement of evidence 14 August 2023 & Jan Talacko, Response to Council Daylight Referral Comments, 671 Chapel Street (undated, tendered to hearing).
Box
Stonnington CC [2024] VCAT 149
(1959) 101 CLR 298