[2008] VCAT 6
Victorian Civil and Administrative Tribunal
2008-01-16
Original judgment source is linked above.
Application to amend permit - When is a separate permit required? - Display of sample products not a sign
Australian Slate-Crete Supplies v Casey CC (Red Dot) [2008] VCAT 6
The nature of the use of the premises is as a wholesale warehouse providing materials to the building trade for the making of ornamental paving for domestic and commercial purposes. The majority of the floor space (80%) is occupied by stored materials either stacked on the floor or on racks and shelves. The balance of the building is occupied by a customer service area which includes a sales counter and display racks containing tools and building supplies. I understand that the operation of the business is almost entirely servicing the building trade.
Land used to store or display goods. It may include the distribution and the wholesale selling of the goods.
WHAT ARE THE IMPLICATIONS OF THESE FINDINGS OF FACT?
[2] The layout of the site and the size of the proposed building and works as shown on the endorsed plan must not be altered or modified without the written consent of the responsible authority.
[2] The land is also in a Development Plan Overlay (Schedule 8) and Development Contributions Plan Overlay (Schedule 7) under the Casey Planning Scheme, but these controls are not relevant for the purpose of this application.
[3] The exception is use of Factory 1 for the purpose of a store. The definition of warehouse includes store. As warehouse is a section 1 use, it is unclear why a permit for use for the purpose of store was required. However, this aspect of the permit is not relevant to the subject land (Factory 11) or to the present case.
[6] [1979] VicRp 37; [1979] VR 347 at 363
[7] My comments about the amendment of permits under Division 1A apply equally to amendments under Division 3 applied for by the permit holder. Each process is similar in that it allows procedural fairness to be accorded to affected persons. It would be inequitable, not to say highly confusing, if a different approach was to be taken and different outcomes were to arise depending on whether a permit had been issued at the direction of the Tribunal or not.
Australian Slate-Crete Supplies
Casey CC