[2018] VCAT 1831
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-12-06
Original judgment source is linked above.
Buildings and works must be constructed in accordance with any requirements in a schedule to this overlay. A schedule may include requirements relating to:
A permit may be granted to construct a building or construct or carry out works which are not in accordance with any requirement in a schedule to this overlay, unless the schedule specifies otherwise.
A permit cannot be granted to vary any mandatory requirements of this Schedule. This does not apply to the following circumstances:
A permit may be granted to vary the requirements as specified in this Schedule in the above circumstances, subject to the proposal achieving the Preferred Character and Design Objectives specified for that Precinct and any local planning policy requirements, to the satisfaction of the responsible authority.
The street wall parapet height must be a minimum of 11 metres and must not exceed 12 metres.
A maximum of 8 metres (equivalent of 2 storeys) change of height is allowed within 5 metres of an abutment to existing buildings.
The ground floor level must not be more than 0.75 metres above the footpath level or 1:100 year flood level.
At least 25% of the ground floor façade should be clear-glazed or transparent.
New crossovers are generally discouraged. Rear access should be utilised where available.
Street Wall Height is the height of the wall at zero setback from the adjoining pavement. Where there is no pavement the height is to be measured from the ground level adjoining the site;
The road alignment at the front of a lot. If a lot abuts two or more roads, the one to which the building, or proposed building, faces;
The vertical distance from natural ground level to the roof or parapet at any point.
What does DDO8 say about height in relation to the proposal?
The maximum overall building height should not exceed 23.5 meters or 6 storeys, whichever is lesser.
A permit may be granted to allow architectural features such as domes, towers, masts and building services that do not exceed the required height by more than 4 metres. The floor area of these features must not exceed 10% of the gross floor area of the top building level.
The street wall parapet height must be a minimum of 11 metres and must not exceed 12 metres.
Where the street wall height is less than 10 metres both levels 5 and 6 must be set back so that they are not visible when viewed from the street frontage of the site/s directly opposite on the other side of the street, at an eye level of 1.6 metres above the footpath level.
Street wall height is measured as being the height of the wall at zero setback from the adjoining pavement.[3]
A permit may be granted to increase the street wall height of corner sites, as specified in the table to this schedule, by up to 4 metres. Where the site has a street frontage of over 15 metres, the street wall height may be increased by 4 metres within a distance of 15 metres from the corner. Increased street wall heights at corners must comply with the solar access requirements of the sub-precinct.
The street wall should be built to side boundaries, except in the Kings Way Mixed Use Precinct (see Kings Way Mixed Use Precinct requirements).
to a height of 28.130 metres[4] where it is setback 4.5 metres from the west boundary abutting 49-55 York Street. Within this 4.5 metre setback the street wall height is 12.3 metres. This frontage does not comply with the street wall height requirement. The Council's view was that a street-wall of 11 metres to a maximum of 12 metres is required to York Street as a mandatory requirement of DDO8-7a.
A maximum of 8 metres (equivalent of 2 storeys) change of height is allowed within 5 metres of an abutment to existing buildings.
... if the sites to the west and south were redeveloped to the discretionary height limit of six storeys, the difference in height would be far less pronounced. However, Council considers that the lack of separation between the buildings, combined with the excessive height of the proposed development would result in unacceptable and overwhelming visual bulk in the streetscape.
What does DDO8 say about setbacks in relation to the proposal?
Buildings must have a zero setback to the street frontage, unless specified in the table to this schedule. A permit may only be granted to vary the setback where a public open space or landscaped area is created. This setback must:
be designed, landscaped and furnished to the satisfaction of the Responsible Authority.
make a positive contribution to the appearance and amenity of the building and the streetscape.
What were the parties' overall positions on the interpretation of DDO8?
The Applicant's primary argument was that for a Requirement to be mandatory, the Requirement should be followed by words to the effect that 'a permit may not be granted to vary this requirement'. The Applicant argued that the use of the word "must" in a sentence, of itself and without more, is insufficient to convert the substance of the sentence into a mandatory requirement.
In further support of this interpretation, the Applicant stated:
the proposal complies with the content of those dot points as regards the upper level setbacks on that street frontage.
DDO8 is a convoluted and confusing planning control and one which would benefit from a thorough revision directed to clarifying its intent and implementation. It is difficult to envisage that consistent and predictable results will be achieved by the implementation of a control which is as poorly expressed as this DDO.[9]
Tribunal's findings: How do we interpret DDO8 as it relates to the proposal?
A permit may not be granted to construct a building or construct or carry out works which are not in accordance with this requirement unless allowed by clause 4.0 of this schedule.
In relation to any requirements of this schedule which otherwise operate as mandatory requirements, a permit may be granted to vary such requirements if either of the following circumstances apply:
except for where this was allowed by clause 4.0, was one that would otherwise operate as a mandatory requirement.
Development beyond the setbacks identified above must not exceed a height of 30 metres. A permit may not be granted to construct a building or construct or carry out works which are not in accordance with this requirement unless allowed by clause 4.0 of this schedule.
A 3 metre landscaped setback must be provided to all street frontages, except laneways and Kings Way.
A permit cannot be granted to vary any mandatory requirements of this Schedule. This does not apply to the following circumstances:
...a requirement or control that must be met and provides for no opportunity to vary the requirement.
The ground floor level must not be more than 0.75 metres above the footpath level or 1:100 year flood level;
Upper level side walls must be designed to create an attractive façade;
The maximum overall building height should not exceed 23.5 metres or 6 storeys, whichever is the lesser; and
New crossovers are generally discouraged. Rear access should be utilised where available.
be as measurable as possible using a quantifiable measure
there is no consistent use of the terms "must" and "may", but rather, where different words and expressions are used without any apparent method; and
we have identified apparent internal inconsistencies within DDO8, e.g. between street wall height provisions,
this has the potential to produce built form outcomes that are not mindful of their context, but which are driven by compliance with strict requirements, and where such determination is subjectively in the hands of the particular reader. This is unlikely to produce certainty and consistency in outcomes. Further, depending who is interpreting the requirement, this approach potentially removes the discretion otherwise available to the decision-maker to determine whether a particular design response will be in keeping with the Preferred Character Statement, will be compatible with the Design Objectives and will be in accordance with the relevant Requirements.
DOES THE PROPOSAL PROVIDE AN ACCEPTABLE BUILT FORM OUTCOME?
What is the strategic planning context of the site?
new private and public open spaces, ensuring the sense of openness and sky visibility is maintained, emphasise corner sites, and creating a high quality public realm with particular emphasis on pedestrian friendliness and active street frontages.
A further design objective seeks to maintain the distinction in building scale between SMC, which is characterised by low to medium rise buildings, and the highrise buildings of Southbank, the Central Activity District and Kings Way.
Is the design, height and visual bulk of the development acceptable?
Whether the bulk, location and appearance of any proposed buildings and works will be in keeping with the character and appearance of adjacent buildings, the streetscape or the area.
To respect the hard edge character of the commercial and industrial precincts of SMC by requiring zero setbacks...to emphasise corner sites through built form, setbacks, street level activity and/or landscape treatments...to encourage development to express detailed articulation and varied streetscape frontages.
...through the design expression and design articulation sought to both enrich the quality of the urban environment and the reading of corner sites as preeminent ordering elements of the reimagined commercial neighbourhood.
demonstrated by the architects as not being visible from a 1.5 metre height above ground level.
framing element in champagne tinted metal cladding panel (CL01). They submitted that:
This framing element architecturally addresses both street frontages, turning the corner and providing continuity and visual cohesion between the two facades.
In terms of setbacks to the southern and western boundaries?
Does the development provide an acceptable ESD response?
internal amenity (daylight) for occupants, they were discussed in the hearing. The interim order we issued requested that a revised glazing schedule be provided with a minimum visible light transmittance (VLT) of 40%. We also requested that the architects explore incorporating openable windows (particularly on the north façade) in our order, to provide natural ventilation to the internal spaces if practicable.
The amended façade design (of two options) both incorporated these measures. Mr Talacko's revised assessment found that with both these revised options, the development continued to achieve a 5-star Green Star rating. His analysis also found that the NABERS energy rating had risen to 6-stars, which in his opinion was a substantial improvement on the previous 5-star NABERS rating.
Mr Talacko stated that his analysis confirms that both options will now achieve an Australian Excellence standard in relation to ESD. Mr Talacko also stated that it must be noted that in order to achieve the NABERS and Green Star ratings, high performance double glazed units must be specified with a maximum system U-value of 2.5 and a solar heat gain coefficient (SHGC) of 0.23. In his opinion:
These performance values can be achieved by specifying a light grey tinted glass with a VLT of 40% ...Our analysis also indicates that substituting the grey glass with a green tinted glass which has an inherently higher ratio of light transmission to solar heat gain (for equivalent thermal properties) will result in improved internal daylight penetration within the office floor plates whilst maintaining the 6-star NABERS rating.
A lift can be omitted dependant on that both Level 8 and Level 9 is a sole tenant and cannot be leased or sold separately without a lift service between level 8 and level 9.
We also note that there are a number of alternate solutions and modifications available in the building permit regime to be assured that the development will satisfy the DDA.
U-value of 2.5 and a solar heat gain coefficient (SHGC) of 0.23; and
The east and west facades to incorporate operable glazing elements to assist with passive ventilation strategies generally in accordance with architectural drawings TP16 by Hayball Architects;
(b) External operable shading to the roof lights;
(c) The proposed location of Urban Art;
(d) A full schedule of materials, finishes and paint colours, including colour samples;
(e) All plant and equipment which are to be located externally; and
(f) A door in the south face of the café to the lobby zone to provide access to toilet facilities.
Incorporation of Sustainable Design initiatives
Implementation of Sustainable Design Initiatives
pursuant to this permit, or similarly qualified person or company, must be submitted to the satisfaction of the Responsible Authority. The report must confirm that all measures and recommendations specified in the Sustainable Management Plan report have been implemented and/or incorporated in accordance with the approved report to the satisfaction of the Responsible Authority.
Site Management Water Sensitive Urban Design (larger Multi-Unit Developments)
Car Parking Stacker Maintenance and Provision
Once submitted and approved the works detailed by the Construction Management Plan must be carried out to the satisfaction of the Responsible Authority.
The Responsible Authority may extend the periods referred to if a request is made in writing:
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] See 244 Dorcas Street Pty Ltd v Port Phillip City Council [2013] VCAT 1487 at [16].
[4] We note that the overall building height at 31.3 metres is greater than this, but the 10th storey is stepped in from the York Street boundary, such that the street wall reaches 28.130 metres at its highest point on the north facade.
[6] Being Amendment C52 to the Port Phillip Planning Scheme.
[7] The examples given were of Schedules 12, 13 and 23 to the DDO.
[8] See, for instance, Gurner 278 Kings Way Pty Ltd v Port Phillip CC [2016] VCAT 28.
[9] Submissions on Behalf of the Applicant for Review at [48].
[10] Assuming a mandatory provision is equivalent to a mandatory requirement and noting that Planning Practice Note 59 also refers to the term "mandatory requirement", seemingly interchangeably.
[11] Department of Environment, Land, Water and Planning, dated June 2015.
[12] Although we acknowledge that DDO8 pre-dates Planning Practice Note 59.