Work Health and Safety Regulations 2022
549Time in which major hazard facility licence must be applied for
Start here
Get a plain-English read of 549
Turn the raw legal text into a practical explanation grounded in Work Health and Safety Regulations 2022.
549 Time in which major hazard facility licence must be applied for
(1) Subject to this regulation, the operator of a determined major hazard facility must apply for a major hazard facility licence within 24 months after the determination of the facility.
(2) The regulator may extend the time in which the operator of a determined major hazard facility must apply for a licence if satisfied, on application by the operator, that there has not been sufficient time to comply with Part 9.3.
| Note | | The exemption from the requirement to be licensed is conditional on an application for a licence being made within the time specified by this regulation (see regulation 535(3) and (5) ). |