Schedule 3 High risk work licences and classes of high risk work
Schedule 3 High risk work licences and classes of high risk work
section 81
Table 3.1
| Item | High risk work licence | Description of class of high risk work | | Scaffolding work | | 1 | Basic scaffolding | Scaffolding work involving one or more of the following—(a) modular or pre-fabricated scaffolds,(b) cantilevered materials hoists with a maximum working load of 500kg,(c) ropes,(d) gin wheels,(e) safety nets and static lines,(f) bracket scaffolds (tank and formwork),but excluding scaffolding work involving equipment, loads or tasks listed in item 2(2)(a)–(g) and item 3(2)(a)–(c) | | 2 | Intermediate scaffolding | (1) Scaffolding work included in the class of basic scaffolding, and(2) Scaffolding work involving one or more of the following—(a) cantilevered crane loading platforms,(b) cantilevered scaffolds,(c) spur scaffolds,(d) barrow ramps and sloping platforms,(e) scaffolding associated with perimeter safety screens and shutters,(f) mast climbing work platforms,(g) tube and coupler scaffolds (including tube and coupler covered ways and gantries),but excluding scaffolding work involving equipment, loads or tasks listed in item 3(2)(a)–(c) | | 3 | Advanced scaffolding | (1) Scaffolding work included in the class of intermediate scaffolding, and(2) Scaffolding work involving one or more of the following—(a) cantilevered hoists,(b) hung scaffolds, including scaffolds hung from tubes, wire ropes or chains,(c) suspended scaffolds | | Dogging and rigging work | | 4 | Dogging | Dogging work | | 5 | Basic rigging | (1) Dogging work(2) Rigging work involving one or more of the following—(a) structural steel erection,(b) hoists,(c) pre-cast concrete members of a structure,(d) safety nets and static lines,(e) mast climbing work platforms,(f) perimeter safety screens and shutters,(g) cantilevered crane loading platforms,but excluding rigging work involving equipment, loads or tasks listed in item 6(b)–(f) and item 7(b)–(e) | | 6 | Intermediate rigging | Rigging work involving one or more of the following—(a) rigging work in the class basic rigging,(b) hoists with jibs and self climbing hoists,(c) cranes, conveyors, dredges and excavators,(d) tilt slabs,(e) demolition of structures or plant,(f) dual lifts,but excluding rigging work involving equipment listed in item 7(b)–(e) | | 7 | Advanced rigging | Rigging work involving one or more of the following—(a) rigging work in the class intermediate rigging,(b) gin poles and shear legs,(c) flying foxes and cable ways,(d) guyed derricks and structures,(e) suspended scaffolds and fabricated hung scaffolds | | Crane and hoist operation | | 8 | Tower crane | Use of a tower crane | | 9 | Self-erecting tower crane | Use of a self-erecting tower crane | | 10 | Derrick crane | Use of a derrick crane | | 11 | Portal boom crane | Use of a portal boom crane | | 12 | Bridge and gantry crane | Use of a bridge crane or gantry crane that is—(a) controlled from a permanent cabin or control station on the crane, or(b) remotely controlled and having more than 3 powered operations,including the application of load estimation and slinging techniques to move a load | | 13 | Vehicle loading crane | Use of a vehicle loading crane with a capacity of 10 metre tonnes or more, including the application of load estimation and slinging techniques to move a load | | 14 | Non-slewing mobile crane | Use of a non-slewing mobile crane with a capacity exceeding 3 tonnes | | 15 | Slewing mobile crane—with a capacity up to 20 tonnes | Use of a slewing mobile crane with a capacity of 20 tonnes or lessUse of a vehicle loading crane with a capacity of 10 metre tonnes or more, excluding the application of load estimation and slinging techniques to move a loadUse of a non-slewing mobile crane with a capacity exceeding 3 tonnesUse of a reach stacker | | 16 | Slewing mobile crane—with a capacity up to 60 tonnes | Use of a slewing mobile crane with a capacity of 60 tonnes or lessUse of a vehicle loading crane with a capacity of 10 metre tonnes or more, excluding the application of load estimation and slinging techniques to move a loadUse of a non-slewing mobile crane with a capacity exceeding 3 tonnesUse of a reach stacker | | 17 | Slewing mobile crane—with a capacity up to 100 tonnes | Use of a slewing mobile crane with a capacity of 100 tonnes or lessUse of a vehicle loading crane with a capacity of 10 metre tonnes or more, excluding the application of load estimation and slinging techniques to move a loadUse of a non-slewing mobile crane with a capacity exceeding 3 tonnesUse of a reach stacker | | 18 | Slewing mobile crane—with a capacity over 100 tonnes | Use of a slewing mobile crane with a capacity exceeding 100 tonnesUse of a vehicle loading crane with a capacity of 10 metre tonnes or more, excluding the application of load estimation and slinging techniques to move a loadUse of a non-slewing mobile crane with a capacity exceeding 3 tonnesUse of a reach stacker | | 19 | Materials hoist | Use of a materials hoist | | 20 | Personnel and materials hoist | Use of a personnel and materials hoistUse of a materials hoist | | 21 | Boom-type elevating work platform | Use of a boom-type elevating work platform if the length of the boom is 11m or more | | 22 | Concrete placing boom | Use of a concrete placing boom | | Reach stackers | | 23 | Reach stacker | Operation of a reach stacker of greater than 3 tonnes capacity that incorporates an attachment for lifting, moving and travelling with a shipping container, but does not include a portainer crane | | Forklift operation | | 24 | Forklift truck | Use of a forklift truck other than an order-picking forklift truck | | 25 | Order-picking forklift truck | Use of an order-picking forklift truck | | Pressure equipment operation | | 26 | Standard boiler operation | Operation of a boiler with a single fuel source that does not have a pre-heater, superheater or economiser attached | | 27 | Advanced boiler operation | Operation of a boiler, including a standard boiler, which may have one or more of the following—(a) multiple fuel sources,(b) pre-heater,(c) superheater,(d) economiser | | 28 | Steam turbine operation | Operation of a steam turbine that has an output of 500 kilowatts or more and—(a) is multi wheeled, or(b) is capable of a speed greater than 3600 revolutions per minute, or(c) has attached condensers, or(d) has a multi staged heat exchange extraction process | | 29 | Reciprocating steam engine | Operation of a reciprocating steam engine if the diameter of a piston exceeds 250mm |