Work Health and Safety Regulation 2025
529CBSilica risk control plan required for processing of CSS that is high risk
Start here
Get a plain-English read of 529CB
Turn the raw legal text into a practical explanation grounded in Work Health and Safety Regulation 2025.
529CB Silica risk control plan required for processing of CSS that is high risk
529CB Silica risk control plan required for processing of CSS that is high risk
(1) A person conducting a business or undertaking carrying out the processing of a CSS that is high risk must, before the processing commences, ensure that a silica risk control plan for the processing—
(a) is prepared, or
(b) has already been prepared by another person.
Maximum penalty—
(a) for an individual—73 penalty units, or
(b) for a body corporate—364 penalty units.
(2) A silica risk control plan must—
(a) identify all the processing of a CSS carried out at the workplace that is high risk, and
(b) include the risk assessment undertaken under section 529CA for all processing of a CSS that is high risk, and
(c) document what control measures will be used to control the risks associated with the processing that is high risk and how the measures will be implemented, monitored and reviewed, and
(d) be set out and expressed in a way that is readily accessible and understandable to persons who use it.
(3) A silica risk control plan is not required to be prepared before the processing of a CSS that is high risk commences if—
(a) the processing that is high risk is also high risk construction work, and
(b) a safe work method statement is prepared, or has already been prepared by another person, before the processing commences, and
(c) the safe work method statement satisfies the requirements in subsection (2).