Work Health and Safety Regulation 2025
464Asbestos removal control plan
Start here
Get a plain-English read of 464
Turn the raw legal text into a practical explanation grounded in Work Health and Safety Regulation 2025.
464 Asbestos removal control plan
464 Asbestos removal control plan
(1) A licensed asbestos removalist must prepare an asbestos removal control plan for licensed asbestos removal work the removalist is commissioned to undertake.
Maximum penalty—
(a) for an individual—73 penalty units, or
(b) for a body corporate—364 penalty units.
(2) An asbestos removal control plan must include—
(a) details of how the asbestos removal will be carried out, including the method to be used and the tools, equipment and personal protective equipment to be used, and
(b) details of the asbestos to be removed, including the location, type and condition of the asbestos.
(3) The licensed asbestos removalist must give a copy of the asbestos removal control plan to the person who commissioned the licensed asbestos removal work.
Maximum penalty—
(a) for an individual—43 penalty units, or
(b) for a body corporate—217 penalty units.