455Emergency procedure—residential premises
Start here
Get a plain-English read of 455
Turn the raw legal text into a practical explanation grounded in Work Health and Safety Regulation 2025.
455 Emergency procedure—residential premises
455 Emergency procedure—residential premises
(1) This section applies if—
(a) an emergency occurs at residential premises, and
(b) a structure or plant at the premises must be demolished, and
(c) asbestos is fixed to or installed in the structure or plant before the emergency occurs.
(2) A person conducting a business or undertaking who is to carry out the demolition of the residential premises must ensure so far as is reasonably practicable, that, before the demolition is commenced, a procedure is developed that will, so far as is reasonably practicable, reduce the risk of exposure of workers and persons in the vicinity of the demolition site to asbestos to below the exposure standard.
Maximum penalty—
(a) for an individual—43 penalty units, or
(b) for a body corporate—217 penalty units.
(3) The person must ensure that the regulator is given written notice about the emergency—
(a) immediately after the person becomes aware of the emergency, and
(b) before the demolition is commenced.
Maximum penalty—
(a) for an individual—43 penalty units, or
(b) for a body corporate—217 penalty units.
(4) For this section, an emergency occurs if—
(a) a structure or plant is structurally unsound, or
(b) collapse of the structure or plant is imminent.