Work Health and Safety Regulation 2025
308Specific control measure—signage identifying principal contractor
Start here
Get a plain-English read of 308
Turn the raw legal text into a practical explanation grounded in Work Health and Safety Regulation 2025.
308 Specific control measure—signage identifying principal contractor
308 Specific control measure—signage identifying principal contractor
The principal contractor for a construction project must ensure that signs are installed that—
(a) show the principal contractor’s name and telephone contact numbers, including an after-hours telephone number, and
(b) show the location of the site office for the project, if any, and
(c) are clearly visible from outside the workplace, or the work area of the workplace, where the construction project is being undertaken.
Maximum penalty—
(a) for an individual—43 penalty units, or
(b) for a body corporate—217 penalty units.