301 Safe work method statement—copy to be given to principal contractor
301 Safe work method statement—copy to be given to principal contractor
A person conducting a business or undertaking that includes carrying out high risk construction work in connection with a construction project must, before the high risk construction work commences, ensure that a copy of the safe work method statement for the work is given to the principal contractor.
Maximum penalty—
(a) for an individual—43 penalty units, or
(b) for a body corporate—217 penalty units.