Schedule 23 — High risk mining activities
[r. 675UK]
| Column 1<br>Item | Column 2<br>High risk mining activity | Column 3<br>Waiting period | Column 4<br>Information to be provided to regulator | | 1. | Commencing sinking, widening or deepening of a mine shaft using entry methods at an underground mine | 45 days | Information required in the approved form<br>Method of working<br>Details of plant to be used<br>Risk assessment and control measures | | 2. | Installing a winding system or making major changes to an already installed winding system at an underground mine | 45 days | Information required in the approved form<br>Relevant parts of the principal mining hazard management plan for the mine<br>Details and, if necessary, drawings and certifications, of the winder, conveyance, ropes and other attachments | | 3. | Commissioning a winding system at an underground mine | 15 days | Information required in the approved form<br>Relevant parts of the principal mining hazard management plan for the mine | | 4. | Rising using entry methods at an underground mine | 15 days | Information required in the approved form<br>Method of working<br>Risk assessment and control measures<br>Specifications of the finished rise | | 5. | Single entry development beyond 200 metres from through ventilation at an underground mine | 15 days | Information required in the approved form<br>Method of working and ventilation<br>Risk assessment and controls<br>Emergency evacuation procedure | | 6. | Construction of an underground explosive magazine at an underground mine | 30 days | Location, design and capacity<br>Ventilation<br>Risk assessment and control measures | | 7. | Construction of a dam or plug to store water or slurry at an underground mine | 30 days | Information required in the approved form<br>Design calculations<br>Construction method and maintenance<br>Risk assessment and control measures | | 8. | Construction of a fuel storage or refuelling facility at an underground mine | 30 days | Information required in the approved form<br>Location, design and capacity<br>Ventilation<br>Risk assessment and control measures | | 9. | Approaching known or suspected water bodies or water‑logged workings at an underground mine, including probe drilling — within 50 m | 30 days | Information required in the approved form<br>Assessment of the water body<br>Development plan for workings<br>Risk assessment and controls<br>Relevant parts of the principal mining hazard management plan for the mine | | 10. | Use of a dredge at a surface mine | 45 days | Information required in the approved form<br>Design and construction details of the dredge<br>Operating details and parameters<br>Loads, stability and buoyancy calculations<br>Review by an independent qualified naval architect<br>Results of buoyancy and stability tests<br>Risk assessment and control measures | | 11. | Construction of, or making substantial change to, a tailing storage facility at a surface mine | 45 days | Information required in the approved form<br>Design details and calculations<br>Construction method<br>Risk assessment and control measures | | 12. | Use of explosives at a mine that is —<br>(a) in reactive ground; or<br>(b) in hot (>57°C) ground | 15 days | Information required in the approved form<br>Selection of explosive and documents in support of its suitability<br>Risk assessment and control measures | | 13. | Introducing or making substantial change to externally‑controlled plant at a mine that is —<br>(a) mobile plant; or<br>(b) production drilling plant | 45 days | Information required in the approved form<br>Design and safety features details<br>Operating environment and limitations<br>Risk assessment and controls<br>Details of planned operations | | 14. | Installing high voltage equipment at a mine | 30 days | Design and construction details of the installation<br>Risk assessment and control measures |