Work Health and Safety (Mines and Petroleum Sites) Regulation 2022
119Survey plan to be available
Start here
Get a plain-English read of 119
Turn the raw legal text into a practical explanation grounded in Work Health and Safety (Mines and Petroleum Sites) Regulation 2022.
119 Survey plan to be available
119 Survey plan to be available
(1) The operator of a mine or petroleum site must keep the current survey plan and all previous versions of the plan available for inspection under the WHS laws.
Maximum penalty—
(a) for an individual—36 penalty units, or
(b) for a body corporate—180 penalty units.
(2) The operator of a mine or petroleum site must make the current survey plan available on request to workers at the mine or petroleum site.
Maximum penalty (subsection (2))—
(a) for an individual—60 penalty units, or
(b) for a body corporate—300 penalty units.