118 Review of survey plan
118 Review of survey plan
(1) The operator of a mine or petroleum site must review and as necessary revise the survey plan at least once every 12 months.
Maximum penalty—
(a) for an individual—60 penalty units, or
(b) for a body corporate—300 penalty units.
(2) The operator of a mine or petroleum site must also review and as necessary revise the survey plan if—
(a) the survey plan no longer accurately reflects the workings that have been, or are proposed to be, carried out at the mine or petroleum site, or
(b) there are reasonable grounds to believe the survey plan is not accurate, or
(c) directed by the regulator because the regulator believes the survey plan is not accurate.
Maximum penalty—
(a) for an individual—60 penalty units, or
(b) for a body corporate—300 penalty units.
(3) Subsection (1) does not apply if the mining operations or petroleum operations at the mine or petroleum site have been discontinued or suspended for more than 12 months.