The Determination’s brevity and reliance on the Woomera Prohibited Area Rule 2014 create a number of practical issues and potential pitfalls for legal advisers and operational planners. The instrument’s text should be read carefully to avoid missteps that could arise from ambiguous drafting choices or from reliance on the Determination in isolation.
Temporal ambiguity. The Determination specifies dates but not times. It lists the exclusion periods as "16 May 2016 - 22 May 2016" and "23 May 2016 - 29 May 2016." The absence of start and end times for each listed date creates uncertainty about exact commencement and expiry moments. Practitioners must not assume midnight-to-midnight coverage without confirming whether the Rule 2014 or departmental guidance supplies a default interpretive rule.
Apparent continuity masked by tabular split. The two exclusion periods are consecutive weeks with identical spatial descriptions. Visually they appear as two rows in the Schedule. That format could lead an unwary reader to treat them as separate events requiring separate permissions or notifications. In practice the effect may be continuous exclusion from 16 May through 29 May 2016 inclusive; the Determination does not explain why the exclusion was segmented administratively. Advisers should therefore treat the two rows as functionally contiguous for operational planning and verify whether distinct administrative steps are required for each week.
Reliance on both coordinates and map. The instrument incorporates a set of coordinates (EZ 1 to EZ 13) and an identifying map in Part 2. The Determination explicitly states the bounded area is "contained within and bounded by a line commencing at [EZ 1] ... and identified in the map in Part 2 of the Schedule." That dual reliance can create interpretive questions if the map and the coordinates do not correspond perfectly, or if there is uncertainty about the map’s scale, datum, or projection. The Determination does not specify the geodetic datum or projection used for the coordinates. Advisers and surveyors should confirm the coordinate datum and reconcile any discrepancies between the textual polygon and the map.
Label and sequence irregularities. In the textual table row the sequence of coordinates includes one instance where punctuation or phrasing departs from the otherwise repetitive pattern ("then to a point 28 58.760 S, 133 49.041 E (EZ 8); 29 14.811 S, 134 14.768 E (EZ 9); then to a point 29 26.926 S ..."). There is an omission of the phrase "then to a point" before EZ 9 in that row. While likely stylistic, in strict constructional arguments such differences sometimes invite contest about intent. Practical users should rely on the full set of coordinates and the map, not on micro-punctuation differences.
Delegation and authority. The Determination is signed by an Acting Assistant Secretary "as a delegate of the Minister for Defence." If an aggrieved party wished to challenge the validity of the Determination, issues might be raised about the scope of the delegate’s delegation instrument or whether the delegate had the authority to exercise subsection 8(1). The Determination does not include the instrument of delegation or cite its empowering provision. Practitioners evaluating procedural risk should therefore confirm that an authorised delegation existed at the relevant time.
No statutory cross-references beyond the Rule 2014. The instrument does not reference other potentially relevant laws or obligations (for example, obligations to notify landholders, environmental assessment obligations, or native title consultation requirements). Where other legal obligations intersect with a spatial exclusion, the Determination’s silence does not relieve administrators of those external obligations, but it does mean those obligations are not managed within this document. Advisers should therefore map out other potential legal interfaces externally to the Determination.
No penalties or enforcement details. The instrument contains no enforcement mechanics. That silence can create risk when operational actors attempt to plan logistics. For example, a contractor contracted to perform work on dates that fall within the exclusion will need to determine whether they must reschedule, obtain a permit under the Rule 2014, or take other steps. The Determination does not set out how to do any of those things.
Map not self-explanatory. The incorporated map in Part 2 is an identifying attachment. The Determination does not specify whether the map is schematic or precise, nor does it provide a key, an inset, or coordinate grid in the text. Users should not assume the map is sufficient alone; they should cross-check the coordinates and consult the Department of Defence for authoritative geospatial files if precise mapping is required.
No recorded consultation or notice record. The Determination does not record whether any notice was given to local landholders or whether consultations occurred. Where statutory duties require notice or consultation under other laws, that absence may be material. The Determination makes no attempt to record or discharge such obligations.
In short: the Determination’s brevity, lack of procedural detail, and dependence on coordinates plus a map create several concrete interpretive and operational risks which must be addressed by cross-referencing to the Rule 2014 and by seeking departmental clarification.