This local environmental plan sets the rules for land use across Weddin: it defines zones, what development is permitted or prohibited, subdivision and lot‑size standards, and environmental and heritage controls. The Plan applies to mapped land and names the Council as the consent authority (cls 1.3, 1.6). Landowners and developers pay compliance costs (consents, assessments, conditions); the Council (and applicable State policies) decides approvals using map overlays and clause tests that constrain or enable development (cls 2.3, 4.1, 6.1–6.4).
This instrument is a local environmental plan (LEP) that sets the land use controls, development consent rules and a range of site-specific regulatory requirements for land in the Weddin area. Mechanically, it does the following.
Establishes the name and commencement mechanics for the Plan (it is Weddin Local Environmental Plan 2011 and it commences on publication on the NSW legislation website, cl 1.1AA, cl 1.1).
Identifies the consent authority as the Council, subject to the Environmental Planning and Assessment Act 1979 (the Act), cl 1.6.
Defines the land to which the Plan applies by reference to the Plan’s Land Application Map and Land Zoning Map (cl 1.3, cl 2.2), and provides that adopted maps may be amended or combined and must be made publicly available (cl 1.7).
Repeals prior local environmental plans and deemed instruments applying only to the same land, and stops other instruments applying to the area (cl 1.8). It includes a savings provision that any development application made but not finally determined before commencement is to be determined as if the new Plan had not commenced (cl 1.8A).
Sets out the zoning framework and Land Use Table that specifies permitted, permitted-with-consent and prohibited development categories for each zone (Part 2, cl 2.1, cl 2.3 and the Land Use Table). Zones include rural, residential, industrial, recreation and conservation categories (cl 2.1).
Provides that certain development requires development consent (for example subdivision, cl 2.6; demolition, cl 2.7) and identifies exempt and complying development routes (Part 3, cl 3.1, cl 3.2), together with exclusions for environmentally sensitive areas (cl 3.3).
Establishes principal development standards, notably minimum lot sizes for subdivision and a set of rural subdivision exceptions and controls (Part 4, cl 4.1, cl 4.1AA, cl 4.1A, cl 4.2, cl 4.2D). It includes an exceptions-to-development-standards mechanism (cl 4.6).
Current sections
Direct links to the current provisions in Weddin Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.31[2].
Zone RU1 Primary Production
Zone RU3 Forestry
Zone RU5 Village
Zone R1 General Residential
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E4 General Industrial
Zone SP2 Infrastructure
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone C3 Environmental Management
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Depots; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Forestry; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Helipads; Highway service centres; Home businesses; Home industries; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Mooring pens; Moorings; Open cut mining; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Research stations; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Sewerage systems; Tourist and visitor accommodation; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Serviced apartments; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2022 (832), Sch 1.31[5].
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Biodiversity protection
6 Biodiversity protection
6.1 Biodiversity protection
(1) The objective of this clause is to maintain terrestrial and aquatic biodiversity, including the following—
(a) protecting native fauna and flora,
(b) protecting the ecological processes necessary for their continued existence,
(c) encouraging the recovery of native fauna and flora and their habitats,
(d) maximising connectivity, and minimising fragmentation, of habitat.
(2) This clause applies to land identified as “High Biodiversity Sensitivity” and “Moderate Biodiversity Sensitivity” on the Natural Resource—Biodiversity Map.
(3) Before determining a development application for development on land to which this clause applies, the consent authority must consider any adverse impact of the proposed development on the following—
(a) native ecological communities,
(b) the habitat of any threatened species, populations or ecological community,
(c) regionally significant species of fauna or flora or habitat,
(d) habitat elements providing connectivity.
(4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied that—
(a) the development is designed, sited and will be managed to avoid any significant adverse environmental impact, or
(b) if that impact cannot be avoided by adopting feasible alternatives—the development is designed, sited and will be managed to minimise that impact, or
(c) if that impact cannot be minimised—the development will be managed to mitigate that impact.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Weddin Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Weddin in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to protect, enhance and conserve agricultural land through the proper management, development and conservation of natural and man-made resources,
(b) to encourage a range of housing, employment, recreation and community facilities to meet the needs of existing and future residents of Weddin,
(c) to promote the efficient and equitable provision of public services, infrastructure and amenities.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
Adds a range of site-specific and sectoral controls covering heritage, biodiversity, wetlands, groundwater vulnerability, riparian buffers, essential services, earthworks, bush fire hazard reduction, intensive livestock agriculture, aquaculture and eco‑tourism, among others (Part 5 and Part 6, cl 5.10, cl 5.18, cl 5.19, Sched 6, cl 6.1-6.7). Some clauses set objective tests and require the consent authority to be satisfied of specified matters before granting consent.
Contains local provisions about classification and reclassification of public land, relevant acquisition authorities for land reservation acquisition, and rules allowing development near zone boundaries where compatible (cl 5.1, cl 5.2, cl 5.3).
Lists heritage items and heritage conservation areas in Schedule 5 and specifies that works affecting those items or areas generally require consent and may require heritage management documents or conservation management plans (cl 5.10, Sch 5).
Carries a number of amendments and inserts over time, recorded as amendment notes beside clauses (for example cl 1.8A, cl 1.9A, cl 4.1AA and others). See the Amendment history section below for the Plan’s recorded modifications.
The Plan repeatedly cross-refers to the Act and to State environmental planning policies and other NSW statutes. It expressly states it is subject to State environmental planning policies that prevail under the Act (cl 1.9(1)). It also establishes a number of procedural and substantive preconditions that a consent authority must address before granting development consent (for example the consent authority’s matters for consideration in cl 2.3(2); heritage matters in cl 5.10; biodiversity matters in cl 6.1). The Plan therefore operates as the local layer of statutory land use regulation, allocating decision‑making authority (the Council) and identifying which land uses are permitted, conditional or prohibited, while importing higher‑order instruments and procedural requirements from the Act and various State policies.
Main concepts
This Plan uses a conventional LEP architecture. The key concepts are zoning, land use tables, maps, development consent categories, exempt and complying development, development standards and a set of local environmental controls directed at particular values or activities.
Zones and Land Use Table (cl 2.1, cl 2.3; Land Use Table): The Plan divides land into named zones (for example RU1 Primary Production, R1 General Residential, E4 General Industrial, RE1 Public Recreation, C3 Environmental Management). For each zone the Land Use Table lists zone objectives and specifies types of development that are permitted without consent, permitted with consent, or are prohibited (cl 2.3 and the Land Use Table entries). The consent authority must have regard to a zone’s objectives when determining an application (cl 2.3(2)).
Maps (cl 1.7, cl 2.2): The Plan is map‑based. The Land Application Map, Land Zoning Map, Lot Size Map, Natural Resource maps (Biodiversity, Wetlands, Groundwater, Water) and Heritage Map are adopted by the Plan and cited in many operational clauses (for example cl 4.1, cl 6.1-6.4, Sch 5). Maps may be amended or consolidated and are to be publicly available (cl 1.7).
Consent authority (cl 1.6): Subject to the Act, the consent authority is the Council. Many clauses require the consent authority to be satisfied of specific matters before granting consent, or to take specific matters into account.
Exempt and complying development (Part 3, cl 3.1-3.3): The Plan identifies development of minimal environmental impact as exempt development where it meets the Schedule 2 standards and this Part’s requirements (cl 3.1). Complying development is development listed in Schedule 3 and meeting prescribed standards (cl 3.2). Exempt and complying development are excluded where the land is an "environmentally sensitive area" as defined in cl 3.3.
Principal development standards (Part 4): The Plan sets minimum subdivision lot sizes via the Lot Size Map (cl 4.1 and cl 4.1AA) and contains special subdivision controls for rural and conservation zones (cl 4.1A, cl 4.2, cl 4.2A). It provides for exceptions to development standards where the applicant demonstrates compliance is unreasonable or unnecessary, subject to the consent authority keeping a record of its assessment (cl 4.6(2)-(4)). Height and floor space ratio clauses are noted as not adopted in this Plan (cl 4.3-4.5).
Local environmental controls (Parts 5 and 6): The instrument contains a broad set of local clauses that impose substantive requirements or matters of consideration. Examples include heritage conservation (cl 5.10 and Schedule 5), intensive livestock agriculture thresholds and locational limits and assessment matters (cl 5.18), aquaculture controls with site and operational requirements (cl 5.19 and Schedule 6), biodiversity and wetlands tests (cl 6.1, cl 6.2), groundwater and riparian land controls (cl 6.3, cl 6.4), essential services (cl 6.6), earthworks assessment matters (cl 6.7) and specific permitted/prohibited use rules such as the prohibition on canal estate development (cl 2.9) and a 52‑day cap for temporary uses unless excepted (cl 2.8).
Cross‑referenced instruments and statutory relationships (cl 1.9, cl 1.9A, multiple notes): The Plan expressly sits under the Act and must yield to State environmental planning policies that prevail under the Act (cl 1.9(1)). It also contains a suspension mechanism for private covenants and agreements to the extent necessary to enable development consistent with the Plan, subject to specified exceptions (cl 1.9A).
Schedules: Schedule 5 lists heritage items and conservation areas, and Schedule 6 provides operational and site rules for pond and tank aquaculture. Schedules 1-3 are present but largely blank or refer to State SEPPs for many exempt and complying development matters.
Definitions and guidance: The Dictionary (cl 1.4) defines words and expressions. Notes included in clauses are expressly not part of the Plan (cl 1.5), but they indicate related State policies and regulations that may apply.
Records and procedural obligations: The consent authority must keep records of assessment where a development standard is contravened under the exceptions clause (cl 4.6(4)). The Plan requires notification of heritage and Aboriginal matters in some cases (cl 5.10(7)-(9)).
Taken together these concepts create a layered decision framework. Zoning and the Land Use Table determine permissibility. Specific clauses add preconditions, locational tests, minimum sizes, design or operational standards and a number of sectoral thresholds. Maps feed into those clauses. The Council is the primary decision maker, constrained by the Act and by the specific matters and prohibitions set out in the Plan.
Who it affects
The Plan alters the regulatory environment for a range of participants. The instrument itself identifies the principal actors and the mechanics that bind them.
Landowners and prospective purchasers. Every parcel in the Plan area is assigned a zone and associated permitted and prohibited uses via the Land Zoning Map and Land Use Table (cl 2.2, cl 2.3, Land Use Table). Owners intending to subdivide must comply with minimum lot sizes on the Lot Size Map and the Plan’s subdivision rules (cl 4.1, cl 4.1AA). Owners of land mapped for biodiversity sensitivity, wetlands, groundwater vulnerability or riparian buffers must expect additional enquiry and potentially refusal unless the consent authority is satisfied the development avoids, minimises or mitigates significant adverse environmental impacts (cl 6.1-6.4). Owners of heritage items or land in conservation areas listed in Schedule 5 are subject to the consent triggers and the heritage assessment, notification and plan requirements in cl 5.10 and Sch 5. Owners seeking to change monitoring arrangements for fire alarm systems must follow cl 5.8. Those seeking to operate temporary uses should note the 52‑day cap in cl 2.8. Landholders proposing intensive livestock agriculture must respect the thresholds, locational constraints and matters for consideration in cl 5.18. Landowners with covenants and agreements on title should note the Plan’s suspension mechanism in cl 1.9A, subject to specified exceptions and rights of public authorities (cl 1.9A(1)-(3)).
The Council (consent authority). The Council is the consent authority under cl 1.6. The Plan imposes specified duties on the consent authority to take account of zone objectives (cl 2.3(2)), to be satisfied of enumerated matters before granting consent (for example cl 2.8(3) for temporary uses; cl 4.2C(3) for rural workers’ dwellings; cl 5.19(2) for aquaculture), to consult certain bodies in particular circumstances (for example notify the Heritage Council when dealing with archaeological sites under cl 5.10(7)), and to keep records of planning standard exception assessments (cl 4.6(4)). The Council must also make and keep accessible the Plan’s adopted maps (cl 1.7). The Plan allows the Council to classify or reclassify public land as operational or community land under the Local Government Act, subject to the procedures the Local Government Act requires (cl 5.2).
Applicants and their advisers (planners, engineers, ecologists, heritage consultants). The Plan requires evidence and studies for many activities. Examples include statements of environmental effects or environmental impact statements for designated development (cl 3.1(3)(c) and cl 5.18(3)(a)), heritage management documents or heritage conservation management plans when requested (cl 5.10(5)-(6)), management strategies for eco‑tourist facilities that address ISO 14000 standard elements where required (cl 5.13(3)(k)(v)), and conformity with aquaculture industry development plans and the operational/site requirements in Schedule 6 for pond and tank aquaculture (cl 5.19, Sch 6). The Plan also requires compliance with the Building Code of Australia for exempt and complying development (cl 3.1(3)(a), cl 3.2(3)(b)). Practitioners preparing applications must also be aware of the Plan’s interaction with State environmental planning policies and the Act (cl 1.9).
Crown and State authorities. The Plan recognises particular State acquisition and reservation arrangements. Clause 5.1 identifies the relevant State authorities for owner‑initiated acquisition of land shown on the Land Reservation Acquisition Map and permits development on land acquired by a State authority subject to the land’s eventual reserved purpose (cl 5.1(2)-(3)). Clause 5.12 clarifies the Plan does not restrict development carried out by or on behalf of public authorities if that development is permitted by State SEPP (cl 5.12(1)-(2)). Clause 1.9A preserves the rights and interests of public authorities under registered instruments (cl 1.9A(3)). Crown land and Crown instruments are excluded from the covenant suspension in specified cases (cl 1.9A(2)(b)).
Industry sectors. The Plan sets particular regulatory pathways for sectors with concentrated regulatory risk or environmental impacts. Intensive livestock agriculture is regulated with capacity thresholds and locational constraints that allow some small operations to proceed without consent subject to restrictions (cl 5.18(4)-(5)). Aquaculture is controlled with species, siting, pond design and discharge rules (cl 5.19, Sch 6). Eco‑tourism has a set of environmental performance and management plan expectations (cl 5.13). Designers of industrial retail outlets and neighbourhood shops must observe limits on retail floor area in cl 5.4(4), cl 5.4(7), and cl 5.4(7AA). Licensed premises proposals benefit from a specific safeguard preventing refusal on a set of music, performance and décor grounds provided the consent authority is satisfied noise can be managed to an acceptable level (cl 5.20).
Adjoining owners and the community. The Plan imposes assessment matters that explicitly require the consent authority to consider impacts on adjoining land uses, amenity, heritage, biodiversity, water quality and indigenous heritage, and to invite and consider responses from heritage or Aboriginal community interests in specified cases (cl 2.3(2); cl 5.10(4), (7)-(9); cl 6.1-6.4). Temporary uses are limited to avoid amenity impacts and must be managed so land is restored (cl 2.8). The Plan therefore directs decision making with community impacts in mind and creates a formal channel for those impacts to be tested in consent processes.
In short, any private or public actor seeking to build, subdivide, change use, or operate particular rural, industrial or environmental activities within the mapped area will be affected by the Plan’s zoning, map‑based constraints, consent triggers and sectoral rules. The Council and relevant State bodies are given roles in deciding whether proposals meet the Plan’s specific tests.
Key duties and rights
The Plan creates a network of duties for the consent authority, application prerequisites for proponents, and rights (including rights to carry out exempt or complying development in defined circumstances). These duties and rights are framed in statutory language that is specific in many areas.
Consent authority duties and process obligations
Determine uses in accordance with the Land Use Table and have regard to zone objectives (cl 2.3(2)). The consent authority must also have regard to other provisions of the Plan (cl 2.3(4)).
Keep a record of the assessment undertaken under the exceptions to development standards provision where an applicant seeks consent to contravene a development standard (cl 4.6(4)). The exceptions mechanism otherwise permits flexibility but requires the consent authority to be satisfied with the applicant’s demonstration that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds (cl 4.6(2)-(3)).
For certain development categories the consent authority must be satisfied of enumerated matters before granting consent. Examples include temporary uses (cl 2.8(3)(a)-(d)); rural workers’ dwellings (cl 4.2C(3)(a)-(d)); eco‑tourist facilities (cl 5.13(3)(a)-(j) and management strategy matters at cl 5.13(3)(k)); aquaculture (cl 5.19(2)); intensive livestock agriculture assessment matters (cl 5.18(3)(a)-(h)); flood planning (cl 5.21(2)-(3)); and natural resource clauses in Part 6 (cl 6.1-6.4). In heritage cases the consent authority must consider the effect on heritage significance and may require heritage management documents or conservation plans (cl 5.10(4)-(6)).
Notify certain bodies and consider their responses for archaeological and Aboriginal heritage matters (cl 5.10(7)-(8)), and notify the Heritage Council for demolition of nominated State heritage items (cl 5.10(9)).
Take into account particular matters when determining subdivision and dwelling applications in specified zones, notably potential land use conflicts and the predominant uses in the vicinity (cl 5.16(3)-(4)).
Ensure essential services are available or adequate arrangements exist for the proposed development (cl 6.6).
Applicant duties and rights
Applicants must comply with the Plan’s permissibility rules. Where development is exempt development in Schedule 2 and meets the Part 3 standards, it may be carried out without development consent but must still comply with other applicable approvals under other Acts and not be located on environmentally sensitive areas as defined in cl 3.3 (cl 3.1(2), cl 3.3). Exempt development must meet Building Code of Australia standards and other safety preconditions (cl 3.1(3)-(5)).
Complying development listed in Schedule 3 and meeting the Part 3 requirements, including Building Code provisions and any Council approvals needed for on‑site effluent, can proceed via a complying development certificate as an alternative to development consent (cl 3.2). Conditions attached to complying development certificates are those prescribed or referred to in Schedule 3 Part 2 and the relevant State SEPP (cl 3.2(4), Sch 3).
Applicants seeking to contravene a development standard must supply the required document under the Environmental Planning and Assessment Regulation 2021, demonstrating why compliance is unreasonable or unnecessary and advancing environmental planning grounds (cl 4.6(3) and the note referencing the Regulation).
Applicants proposing development on mapped biodiversity, wetlands, groundwater or riparian land must demonstrate design, siting and management that avoids, or if avoidance is not feasible, minimises or mitigates significant adverse environmental impacts (cl 6.1-6.4).
Applicants proposing heritage‑sensitive works may be required to prepare heritage management documents or heritage conservation management plans and, where the proposal might affect archaeological sites or Aboriginal places of heritage significance, must allow statutory notification periods and consider responses (cl 5.10(4)-(9)).
Rights and exemptions
Development specified as exempt in Schedule 2 and complying development specified in Schedule 3 can be carried out without development consent where the Plan’s conditions are met (cl 3.1-3.2). However, exempt and complying development are excluded on environmentally sensitive areas (cl 3.3).
Clause 1.9A grants a limited ability for development consistent with the Plan to proceed despite private covenants, agreements and instruments that would otherwise restrict the development, except where the covenant is one imposed by or required by the Council or certain Crown instruments or other enumerated conservation instruments (cl 1.9A(1)-(3)). This creates a conditional right to implement Plan‑permitted development notwithstanding some private title restrictions, subject to listed exceptions.
Other rights and procedural protections
Clause 1.8A preserves procedural protection for applicants with development applications made before commencement by requiring such applications, if not finally determined, to be determined as if the Plan had not commenced (cl 1.8A).
The Plan protects the rights and interests of public authorities under registered instruments when suspending covenants (cl 1.9A(3)).
The Plan explicitly states it is subject to State environmental planning policies which may prevail where the Act provides (cl 1.9(1)).
The instrument therefore distributes duties to the Council as decision maker, places information, notification and evidence obligations on applicants, establishes limited rights to undertake exempt/compliant development, and sets out particular statutory protections (for example the saving for pending applications and the exclusions to covenant suspension). The Plan does not itself specify criminal penalties or monetary fines; enforcement and remedies are addressed through the Act and other statutes it references.
Penalties and enforcement
The Plan is primarily a statutory instrument that sets development controls, consent requirements and procedural obligations. It does not itself create an express schedule of monetary penalties, infringement notices or prosecution provisions within the text provided. Enforcement and penalties for breaches are therefore not specified in the Plan’s clauses as presented. The Plan instead relies on the Act and other relevant legislation for enforcement mechanisms, as is made clear by its multiple cross‑references to the Act and other statutes (for example cl 1.6, cl 1.9(1), cl 1.9A(4) and the various Notes referencing the Act and supporting regulations).
What the Plan does include that affects enforcement and administration
Decision maker identification. The Plan designates the Council as the consent authority for the purposes of the Plan (cl 1.6). That identification focuses enforcement responsibilities and exercise of statutory powers under the Act on the Council in the first instance. The Council’s obligations to assess and determine applications pursuant to the Plan are established in the decision clauses for particular developments (for example cl 2.6 subdivision; cl 2.7 demolition).
Procedural record keeping. Where the exceptions to development standards are used, the consent authority must keep a record of its assessment (cl 4.6(4)). That requirement creates an administrative record that can be relevant in any enforcement or merits review if a decision is challenged.
Notification and consultation duties. The Plan imposes statutory notification obligations prior to consenting in specific heritage and Aboriginal matters (cl 5.10(7)-(9)). These documented steps are part of the administrative process and material in any dispute about procedural fairness.
Exclusions and reserved rights. The Plan preserves the rights and interests of public authorities and excludes certain Crown instruments from the covenant suspension mechanism (cl 1.9A(2)-(3)). Those rights limit the scope of actions the Council or private parties may take without regard to other statutory regimes.
What the Plan does not itself do in the text provided
It does not specify criminal offences, monetary penalties, compliance notices or enforcement processes within the Plan text. No clause sets out infringement penalties, abatement notice procedures, orders for demolition, or explicit enforcement sanctions.
It does not set out appeal rights, review procedures or timetables; those procedural rights and enforcement remedies rest with the Act and associated regulations.
Practical consequence
Because the Plan defers enforcement mechanics to the Act and other statutes, enforcement will be effected by the statutory mechanisms available under those instruments. Practitioners and property owners must therefore consult the Act, the Environmental Planning and Assessment Regulation 2021, the Local Government Act 1993 and other relevant legislation to identify applicable enforcement powers, available remedies and potential penalties for non‑compliance. The Plan’s obligations (for example the requirement to obtain development consent for certain activities) create regulatory duties that, if breached, will attract the enforcement regime provided by those higher‑order instruments.
How it interacts with other laws
The Plan is expressly embedded within New South Wales’ statutory environmental planning framework. It references and relies upon the Act and a number of State environmental planning policies and other statutes. The instrument therefore operates as the local legal layer while recognising and deferring to superior instruments where the Act prescribes.
Primary statutory relationships and precedence
Subject to State environmental planning policies that prevail under the Act. Clause 1.9(1) states the Plan is subject to any State environmental planning policy (SEPP) that prevails over it as provided by section 3.28 of the Act. That clause establishes that where the Act gives a SEPP effect over a local LEP, the SEPP will override inconsistent local controls. The Plan also lists several State SEPPs and State instruments that may be relevant to development in the area in the Land Use Table note (for example SEPP (Housing) 2021; SEPP (Transport and Infrastructure) 2021; other SEPPs referenced in the Land Use Table note).
The Plan repeatedly refers to the Act for a variety of procedural and substantive matters. Examples include court authorisations under section 3.16 (the Governor’s approval recorded in cl 1.9A(4)), Division 3.5 of the Act referenced in the savings Note to cl 1.8A, and section 3.20 mentioned in cl 1.2 that ties the Plan to the relevant standard environmental planning instrument under the Act. The Plan therefore assumes the Act provides procedural mechanisms for public notice, amendment and the broader regulatory scaffolding.
Cross‑reference to the Environmental Planning and Assessment Regulation 2021. Clause 4.6 includes a note stating the Regulation requires a development application that proposes to contravene a development standard to be accompanied by a document explaining why compliance is unreasonable or unnecessary. This ties the Plan’s exceptions clause to a regulatory evidentiary requirement.
Interaction with Specialist Acts. Several clauses interact with specialist legislation and reserve regimes: cl 1.9A cross‑references the Crown Land Management Act 2016 and the National Parks and Wildlife Act 1974 and excludes certain instruments from the covenant suspension; cl 5.1 interacts with the Land Acquisition (Just Terms Compensation) Act 1991 in naming relevant acquisition authorities for particular reserved land on the Land Reservation Acquisition Map; cl 5.8 references Fire and Rescue NSW and private monitoring agreements; cl 5.11 notes the Rural Fires Act 1997 authorises bush fire hazard reduction work without development consent; cl 5.19 and Schedule 6 reference the Fisheries Management Act and aquaculture regulations and industry development plans. These references indicate that work in certain areas will require permits or compliance with other Acts in addition to the Plan’s requirements.
Local Government Act 1993. Clause 5.2 enables classification and reclassification of public land as “operational land” or “community land” in accordance with Part 2 of Chapter 6 of the Local Government Act, and the clause notes section 30 of that Act enables the Plan to discharge trusts where land is reclassified. This interaction affects management of public reserves and community land status.
Specific operational interactions
Covenants and private instruments. The Plan’s suspension of covenants clause (cl 1.9A) modifies the effect of private restrictive instruments to the extent necessary to permit development that accords with the Plan, except where the covenant is imposed by or required by the Council or relates to specified Crown or conservation instruments (cl 1.9A(1)-(2)). It also preserves rights and interests of public authorities under registered instruments (cl 1.9A(3)). The clause records that the Governor approved the subclauses under section 3.16 of the Act (cl 1.9A(4)). Practitioners must therefore assess overlapping private title restrictions against the Plan and the listed exceptions.
Environmentally sensitive areas and State heritage. The Plan excludes exempt and complying development from environmentally sensitive areas (cl 3.3). It requires consultation with the Heritage Council and local Aboriginal communities in certain heritage and archaeological contexts (cl 5.10(7)-(9)). These duties reflect overlapping obligations under heritage, biodiversity and Aboriginal heritage legislation.
Building Code and BASIX. Exempt and complying development must meet the Building Code of Australia and, where BASIX commitments apply, cl 4.6(8) prevents the exceptions provision being used to contravene those commitments. This links building compliance and energy/water sustainability commitments into local planning discretion.
Flood and climate guidance. Clause 5.21 requires the consent authority to consider projected changes from climate change and to apply the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual where relevant. These references impose an external guidance framework on flood‑related consent decisions.
Local approvals for effluent systems. Clause 3.2(3)(c) makes a complying development certificate contingent on any approval required under the Local Government Act 1993 for an on‑site effluent disposal system on unsewered land. That cross‑reference links local government licensing and development certification.
Practical effect of interactions
Where the Plan’s controls conflict with a SEPP that prevails under the Act, the SEPP will take precedence (cl 1.9(1)).
Many Plan permissions are conditional on satisfying requirements in other legislation or policies. For example, exempt development remains subject to other Acts and approvals (cl 3.1 Note). Aquaculture and intensive livestock agriculture require compliance with industry plans and may be subject to separate licensing regimes under fisheries or agricultural statutes (cl 5.19(5), cl 5.18(3)(g)-(h)).
The Plan’s operational rules, such as essential services (cl 6.6) and heritage notification duties (cl 5.10), create checkpoints that frequently require engagement with other statutory regulators or specialised technical assessments.
In sum, the Plan forms the local layer of a multi‑level statutory framework. It prescribes local rules while relying on the Act and a range of State policies and specialist Acts both to supply enforcement mechanisms and to override or supplement local controls where the legislation so provides.
Amendment history
The Plan text records a number of amendments, insertions and repeals. The instrument marks those changes inline with amendment citations. The following compiles the amendment notes that appear in the Plan as provided.
Clause 1.8A (Savings provision relating to development applications), was amended and recorded as Am 2019 (621), Sch 5[1]. The note appears directly after cl 1.8A.
Clause 1.9A (Suspension of covenants, agreements and instruments) is annotated Am 2019 (621), Sch 5[2]-[4]. The clause also notes that the Governor approved subclauses under section 3.16 of the Act.
Clause 2.1 (Land use zones) shows amendment notation Am 2022 (832), Sch 1.31[1].
The Land Use Table is annotated with multiple amendments: Am 2016 (168), Sch 1[2]; 2017 (493), Sch 1.1[1]; 2019 (137), Sch 6[1]; 2022 (314), Sch 1; 2022 (832), Sch 1.31[2].
Clause 4.1AA (Minimum subdivision lot size for community title schemes) was added and recorded as Am 2022 (832), Sch 1.31[3].
Clause 4.1A (Boundary changes between lots in certain rural zones) is recorded as Ins 2018 (272), Sch 1[1].
Clause 4.2A (No strata plan subdivision in certain rural zones) shows Am 2022 (832), Sch 1.31[3].
Clause 4.2B (Erection of dwelling houses on land in certain rural and conservation zones) is annotated Am 2014 (393), cl 4; and Am 2022 (832), Sch 1.31[3] [4].
Clause 4.2D (Rural subdivision for intensive livestock agriculture or intensive plant agriculture) was inserted and recorded as Ins 2018 (272), Sch 1[2].
Clause 4.6 (Exceptions to development standards) has an amendment note Am 2022 (832), Sch 1.31[5] and contains references to repealed subclauses.
Clause 5.3 (Development near zone boundaries) is annotated Subst 2018 (272), Sch 1[3].
Clause 5.4 (Controls relating to miscellaneous permissible uses) shows Am 2018 (406), Sch 1.149 [1] [2].
Clause 5.9AA appears as Repealed, with no further detail provided in the text supplied.
Clause 6.5 is recorded as Rep 2021 (225), Sch 1.
Clause 5.24 (Farm stay accommodation) and clause 5.25 (Farm gate premises) are annotated as Subst 2023 (458), Sch 1[4].
Clause 4.1AA and cl 4.2A/4.2B amendments reflect the Plan’s updates to subdivision and dwelling controls in community title and rural zones (Am 2022 entries).
Schedule and table changes: The Plan notes several amendments to the Land Use Table and the Sch 3 general conditions are linked by note to the State SEPP (Exempt and Complying Development Codes) 2008.
What this record shows
The Plan has been updated repeatedly to refine subdivision controls, rural residential rules and procedural matters. Amendment citations indicate a sequence of modifications between 2014 and 2023 documented beside specific clauses.
Some clauses have been inserted by later amendments (Ins), some substituted (Subst) and some repealed (Rep). The amendment notes identify the amending instrument by year and Schedules or clause references.
The Plan includes both incremental adjustments (for example adjustments to permitted uses, addition of community title lot size rules) and thematic updates (for example clarifications around covenant suspension and additions to rural subdivision rules).
Limitations
The Plan text records amendment citations but does not reproduce the amending instruments themselves. The amendment references shown (for example 2019 (621), 2018 (272), 2022 (832), 2023 (458)) are the only amendment data contained in the provided text. For a full history, including the content and context of each amending instrument, one must consult the NSW legislation database and the amending instruments cited.
Litigation history
The Plan as provided contains no litigation history, no references to judicial decisions, and names no cases. The instrument is drafted as a statutory planning instrument and does not summarise or cite court or tribunal decisions. The text includes a number of procedural and evidentiary points (for example the consent authority must keep records under cl 4.6(4); notification duties under cl 5.10(7)-(9)) that affect administrative review and litigation risk, but the Plan itself does not record any litigation outcomes or judicial interpretations.
What to expect in practice
The Plan’s provisions that create discretionary judgment (for example exceptions to development standards, environmental impact assessments and heritage significance evaluations) create fertile ground for merits appeals and judicial review proceedings under the Act’s appeal and review mechanisms. However, those appeal rights and litigation pathways are governed by the Act and regulations, which are not reproduced in the Plan text.
Administrative records required by the Plan, such as the consent authority’s assessment record when a development standard is contravened (cl 4.6(4)), and the heritage notifications (cl 5.10(7)-(9)), will be material in any merits or judicial review proceedings, including in challenges to procedural fairness or to the adequacy of environmental assessment.
Because the Plan defers enforcement provisions and appeal pathways to the Act and to State policy, any litigation relating to decisions under the Plan will rely on those instruments for grounds, remedies and procedures.
In short, the Plan contains no litigation history in itself. To establish precedent or review case law relevant to interpreting the Plan one must consult decisions under the Act and tribunal or court judgments that are not reproduced in the provided text.
Gotchas
This Plan contains numerous specific traps for practitioners that can produce unintended outcomes if overlooked. The following are concrete operational “gotchas” grounded in the Plan text.
Savings for pending development applications (cl 1.8A). Any development application made before the Plan’s commencement that is not finally determined must be determined as if the Plan had not commenced. Practitioners must check dates closely. If an applicant assumes the new LEP rules apply to a pending DA, they may be wrong and risk a refusal or a change in consent pathway. The Note to cl 1.8A also flags the separate Division 3.5 Act process for an application that requires a draft instrument amendment.
Covenant suspension but limited exceptions (cl 1.9A). Clause 1.9A disapplies private covenants, agreements or similar instruments to the extent necessary to allow Plan‑consistent development. However the clause excludes covenants imposed by the Council and a list of Crown and conservation instruments (cl 1.9A(2)(a)-(g)). It also preserves public authority rights under registered instruments (cl 1.9A(3)). Practitioners must not assume that all easements or title restrictions are automatically displaced. Confirm the nature of the instrument and whether an exception applies.
Exempt and complying development exclusions for environmentally sensitive areas (cl 3.3). Exempt and complying development is barred on “environmentally sensitive areas” as defined in cl 3.3(2). That definition covers a wide set of areas including coastal waters, Ramsar wetlands, land identified as high Aboriginal cultural significance or high biodiversity significance, and land reserved under the National Parks and Wildlife Act (cl 3.3(2)(a)-(j)). A seemingly minor domestic works project that would be exempt elsewhere may require a full DA in such an area.
Heritage triggers are broad (cl 5.10, Sch 5). Demolition, exterior alteration, structural interior changes listed in Schedule 5, or erection of a building on land where a heritage item or Aboriginal object is located, all require consent (cl 5.10(2)(a), (e)). The consent authority may require a heritage management document or conservation management plan and must consider the effect on heritage significance (cl 5.10(4)-(6)). There are compulsory notification steps for archaeological sites and some Aboriginal places (cl 5.10(7)-(8)). Owners of lots listed in Schedule 5 must therefore allow time and cost for heritage assessment documents.
Intensive livestock agriculture has multiple locational thresholds (cl 5.18). Small‑capacity operations listed in cl 5.18(5) may be carried out without development consent, but only if the consent authority is satisfied they will not be located in environmentally sensitive areas, near watercourses, in drinking water catchments, or within prescribed distances of other dwellings or farming operations (cl 5.18(4)(b)(i)-(vii)). Failure to respect these locational tests can cause an otherwise permitted operation to require consent.
Aquaculture compliance is multi‑layered (cl 5.19, Sch 6). Pond and tank aquaculture must comply with Part 1 of Schedule 6 site and operational requirements and species selection must be consistent with aquaculture industry development plans (cl 5.19(2), Sch 6). Intensive pond systems must be capable of draining and drying and must not discharge freshwater to natural waterbodies except in limited cases (Sch 6 Div 2 items 3-4). Oyster aquaculture in priority areas may proceed without consent but only within tightly defined map boundaries and small parcel exceptions (cl 5.19(6)). Overlooking these operational specifics risks non‑compliance and required remediation.
Subdivision rules and exceptions (cl 4.1, cl 4.1AA, cl 4.2, cl 4.2D). The Plan’s minimum lot size rules are map‑based and apply to subdivisions requiring consent (cl 4.1(2)-(3)). There are nuanced exceptions for community title schemes (cl 4.1AA), boundary adjustments in RU1 where number of lots and dwelling entitlements does not increase (cl 4.1A), and rural subdivision for primary production or intensive agriculture under cl 4.2 and cl 4.2D. Practitioners must cross‑check the Lot Size Map and applicable zone rules before assuming a proposed parcel can be created.
Temporary use cap is short (cl 2.8). Temporary uses are limited to 52 days in any 12‑month period, unless the temporary use is a sales office for a new release area in which case an exception applies. A festival organiser or seasonal operator cannot rely on an open‑ended temporary use permission.
Playing and performing music protections (cl 5.20). Consent authorities are expressly prohibited from refusing consent to licensed premises on a range of grounds relating to music, performance and décor, and must not refuse on noise grounds if satisfied the noise may be managed and minimised to an acceptable level (cl 5.20(1)-(2)). Applicants and councils must focus on demonstrable noise management rather than intrinsic characteristics of entertainment.
Essential services precondition (cl 6.6). Development consent must not be granted unless the consent authority is satisfied essential services are available or adequate arrangements are in place for water, electricity, sewage disposal, stormwater and road access. This is a threshold matter that can halt consent where servicing is unresolved.
Exceptions to development standards cannot be used to breach specified standards (cl 4.6(8)). The exceptions clause cannot be used to contravene standards for complying development, BASIX commitments, or clauses 5.4 or 5.5. That constraint chills some creative arguments seeking to use the exceptions clause to override fundamental sustainability or compliance obligations.
Maps and public access (cl 1.7). The Plan permits maps to be in electronic or paper form and requires public access arrangements approved by the Minister. Practitioners should confirm the current maps on the NSW Planning Portal because map changes can alter permissibility.
These are practical traps that tend to generate non‑compliance, delays, additional costs and inadvertent refusals. Each is rooted in a specific clause of the Plan and can be mitigated by early mapping checks, targeted technical studies, and pre‑lodgement consultation with the Council and any relevant State agencies.
How to comply
Compliance under this Plan is a sequence of map checks, permissions checks, evidence collection and procedural steps. The checklist below sets out a pragmatic path for practitioners, citing the relevant clauses.
Confirm land identity and applicable maps. Start by identifying the parcel on the Land Application Map and the Land Zoning Map (cl 1.3, cl 2.2). Check the Lot Size Map to determine minimum lot sizes applicable to any subdivision (cl 4.1). Check the Natural Resource maps for biodiversity sensitivity, wetlands, groundwater vulnerability and watercourse identification (cl 6.1-6.4). Check the Heritage Map and Schedule 5 for heritage items or conservation areas (cl 5.10, Sch 5). Maps may be electronic; ensure you use the latest version available on the NSW Planning Portal as required by cl 1.7.
Establish permissibility from the Land Use Table. Use the Land Use Table entries for the relevant zone to determine whether the proposed use is: permitted without consent, permitted with development consent, or prohibited (cl 2.3 and the Land Use Table). The consent authority must have regard to zone objectives when determining an application (cl 2.3(2)). If the proposed activity is not listed, cl 2.4 treats development on unzoned land as requiring development consent and requires compatibility with adjoining zones.
Determine whether the proposal is exempt or complying development. Check Schedule 2 for exempt development and Schedule 3 for complying development items and conditions (cl 3.1-3.2). Remember exempt/compliant development is excluded on environmentally sensitive areas as defined in cl 3.3. Exempt development must meet Building Code of Australia provisions and other conditions in cl 3.1(3)-(5). Complying development certificates require meeting the relevant deemed‑to‑satisfy Building Code provisions and any Council approvals for on‑site effluent (cl 3.2(3)(b)-(c)). Where State SEPPs specify exempt or complying development, those instruments also apply (cl 1.9).
Check specific sectoral rules and prepare required studies. If the proposal involves any of the following, prepare the indicated material in advance:
Heritage items or conservation areas: be ready to prepare a heritage management document or a heritage conservation management plan where required, and expect notification of the Heritage Council and local Aboriginal communities in the circumstances set out in cl 5.10(5)-(9). Anticipate the consent authority’s requirement to consider heritage significance before granting consent (cl 5.10(4)).
Biodiversity, wetlands, groundwater and riparian areas: prepare ecological, hydrological and site‑specific assessments showing how the development will avoid, minimise or mitigate significant adverse environmental impacts as required by cl 6.1-6.4.
Intensive livestock agriculture: ensure any small operations meet the capacity thresholds and locational constraints in cl 5.18(4)-(5), and provide environmental assessment material on odour, water pollution risk, soil degradation and mitigation measures (cl 5.18(3)(a)-(f)).
Aquaculture: align species selection with aquaculture industry development plans and comply with the site and operational requirements of Schedule 6; for intensive pond systems ensure ponds can be drained and dried and that freshwater discharge rules are respected (cl 5.19, Sch 6).
Eco‑tourist facilities: prepare a management strategy addressing the matters at cl 5.13(3)(a)-(k), including any monitoring and ISO‑related management elements requested.
Ensure essential services and access are addressed. Clause 6.6 prevents consent if water, electricity, sewage, stormwater drainage or suitable road access are unavailable or have no arrangements to be provided. Obtain written confirmations or design plans demonstrating service availability, or outline staged arrangements acceptable to the Council.
Subdivision compliance. For subdivision proposals check the Lot Size Map and cl 4.1 for minimum lot sizes and the exceptions in cl 4.1AA, cl 4.1A, cl 4.2, cl 4.2D where applicable. Note cl 2.6(2) which prevents consent for subdivision that separates a principal dwelling from an associated secondary dwelling unless both resulting lots meet minimum lot sizes. Prepare evidence showing the subdivision will not increase dwelling entitlements where cl 4.1A is to be used.
Address development standards and possible contraventions. If the proposal contravenes a Plan development standard, structure the application to use cl 4.6 only where appropriate. Provide the document required under the Environmental Planning and Assessment Regulation 2021 explaining why compliance is unreasonable or unnecessary and demonstrate sufficient environmental planning grounds (cl 4.6(3) and note). Be aware the consent authority must keep a record of its assessment under cl 4.6(4). Note that the exceptions clause does not permit contravention of standards for complying development, BASIX commitments, or certain other specified clauses (cl 4.6(8)).
Prepare required notifications and consultations. For archaeological sites, the consent authority must notify the Heritage Council and consider responses received within 28 days (cl 5.10(7)). For Aboriginal places of heritage significance, the consent authority must notify local Aboriginal communities and consider responses within 28 days (cl 5.10(8)). For nominated State heritage item demolition, the consent authority must notify the Heritage Council and consider any response (cl 5.10(9)). Build these notification periods into programme timelines.
Check other statutory approvals. The Plan notes that exempt development is not exempt from other Acts and approvals (cl 3.1 Note). Aquaculture may require licences under the Fisheries Management Act, and Crown land and reserve lands may be governed by the Crown Land Management Act or the National Parks and Wildlife Act (cl 1.9A(2), cl 5.1). Ensure any necessary licences, water entitlements or Crown approvals are sought in parallel.
Pre‑lodgement meeting with the Council. Because the Plan vests broad discretion in the consent authority and imposes many matters-of-satisfaction, a pre‑lodgement meeting is advisable to establish expectations for studies, the likelihood of needing a heritage management plan or EIS, and the servicing requirements under cl 6.6.
Record keeping and conditions. If seeking an exceptions approval under cl 4.6, prepare to supply the required documents and evidence and anticipate detailed consent conditions that enforce the mitigation, management and monitoring the consent authority relies upon. Keep administrative records to support later review or compliance checks; the Plan expressly requires a record for cl 4.6 assessments (cl 4.6(4)).
Be mindful of timing rules. Temporary uses are limited to 52 days in any 12‑month period (cl 2.8). Clause 1.8A preserves the pre‑commencement treatment of pending DAs. Heritage and Aboriginal notifications impose 28‑day windows (cl 5.10(7)-(9)). Build these calendar constraints into project schedules.
Following this sequence and preparing the specified technical material will align a proposal with the Plan’s procedural and substantive requirements. Because the Plan operates within the legislative framework of the Act and various SEPPs and specialist Acts, compliance requires parallel attention to those instruments, especially where the Plan cross‑references them (for example BASIX, the Environmental Planning and Assessment Regulation 2021, Fisheries and Crown land statutes).
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Weddin Local Environmental Plan 2002
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
cl 2.1: Am 2022 (832), Sch 1.31[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
(i) is inundated by surface water or groundwater movement, or
(ii) drains to a waterway or waterbody by surface water or groundwater movement, and
(b) the erection of a dwelling, and
(c) one or both of the following—
(i) the use of fill material to raise the level of all or