Water Supply (Critical Needs) Act 2019
Schedule 2Declared water supply development
Start here
Get a plain-English read of Schedule 2
Turn the raw legal text into a practical explanation grounded in Water Supply (Critical Needs) Act 2019.
Schedule 2 Declared water supply development
Schedule 2 Declared water supply development
| Development | Critical town or locality water supply | | Burrendong Dam access point relocation project | the locality that includes Dubbo, Wellington, Warren, Nyngan and Cobar | | Chaffey Dam to Dungowan Village pipeline | the locality that includes Tamworth, Moonbi and Kootingal | | Macquarie River to Orange pipeline | the locality that includes Orange, Spring Hill, Lucknow and Molong and the area serviced by the Central Tablelands Water County Council water supply system | | Works to connect the Cobar and Nyngan town water supplies to alternative available groundwater sources | the locality that includes Cobar and Nyngan | | Walgett weir and Walgett water treatment plant project | the locality that includes Walgett | | Bourke weir, bore water supply and water treatment project | the locality that includes Bourke | | Re-establishment of natural rock weirs on the Darling River between Bourke and its junction with the Murray River | the locality that includes Bourke and the Darling River between Bourke and its junction with the Murray River | | Works for the Warren town water supply, including bores, connecting piping and associated infrastructure for the Warren bore field | the locality that includes Warren | | Works for the Bathurst water supply system, including a pumping station on the Macquarie River, a pre-treatment plant, pipelines, processing ponds, storage ponds and additional pumping stations to transfer water to the existing Bathurst water filtration plant | the locality that includes Bathurst, Raglan, Eglinton and Perthville and the area serviced by the Bathurst water supply system |
sch 2: Am 2020 (171), cl 3(2).