Water Plan (Moreton) 2007
sec.38Authorising existing taking of water from Morton Vale Pipeline zone
Start here
Get a plain-English read of sec.38
Turn the raw legal text into a practical explanation grounded in Water Plan (Moreton) 2007.
sec.38 Authorising existing taking of water from Morton Vale Pipeline zone
The chief executive must grant 2 water allocations to the bulk water supply authority to take surface water from the Morton Vale Pipeline zone. The first water allocation— must state a nominal volume of 3,507ML; and belongs to the medium priority B group. The second water allocation— must state a nominal volume of 185ML; and belongs to the high priority group. s 38 prev s 38 om 2014 SL No. 142 s 187 pres s 38 ins 2019 SL No. 251 s 20 (sec.38-ssec.1) The chief executive must grant 2 water allocations to the bulk water supply authority to take surface water from the Morton Vale Pipeline zone. (sec.38-ssec.2) The first water allocation— must state a nominal volume of 3,507ML; and belongs to the medium priority B group. (sec.38-ssec.3) The second water allocation— must state a nominal volume of 185ML; and belongs to the high priority group.
- (a) must state a nominal volume of 3,507ML; and
- (b) belongs to the medium priority B group.
- (a) must state a nominal volume of 185ML; and
- (b) belongs to the high priority group.