Water Plan (Gold Coast) 2006
sec.35Matters chief executive must consider
Start here
Get a plain-English read of sec.35
Turn the raw legal text into a practical explanation grounded in Water Plan (Gold Coast) 2006.
sec.35 Matters chief executive must consider
In deciding the operating arrangements and supply requirements for water infrastructure under the resource operations licence for the Nerang water supply scheme, the chief executive must consider— the impact of the infrastructure’s operation on the following— the water allocation security objectives; water quality; instream water levels; erosion of the bed and banks of watercourses; riparian vegetation; the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems; recreation and aesthetic values of the plan area; cultural values, including, for example, cultural values of the traditional owners of the area; and the impact of the infrastructure on the movement of fish and other aquatic species; and the impact of the transfer of water between watercourses; and the likelihood of fish deaths caused by the operation of the infrastructure; and the joint operation of all the infrastructure; and any system operating plan applying to the plan area; and any regional water security program for the SEQ region. Subsection (1) does not limit the matters the chief executive may consider. s 35 amd 2008 Act No. 34 s 751 sch 2 ; 2014 SL No. 142 s 89 (sec.35-ssec.1) In deciding the operating arrangements and supply requirements for water infrastructure under the resource operations licence for the Nerang water supply scheme, the chief executive must consider— the impact of the infrastructure’s operation on the following— the water allocation security objectives; water quality; instream water levels; erosion of the bed and banks of watercourses; riparian vegetation; the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems; recreation and aesthetic values of the plan area; cultural values, including, for example, cultural values of the traditional owners of the area; and the impact of the infrastructure on the movement of fish and other aquatic species; and the impact of the transfer of water between watercourses; and the likelihood of fish deaths caused by the operation of the infrastructure; and the joint operation of all the infrastructure; and any system operating plan applying to the plan area; and any regional water security program for the SEQ region. (sec.35-ssec.2) Subsection (1) does not limit the matters the chief executive may consider.
- (a) the impact of the infrastructure’s operation on the following— (i) the water allocation security objectives; (ii) water quality; (iii) instream water levels; (iv) erosion of the bed and banks of watercourses; (v) riparian vegetation; (vi) the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems; (vii) recreation and aesthetic values of the plan area; (viii) cultural values, including, for example, cultural values of the traditional owners of the area; and