Water Plan (Calliope River Basin) 2006
sec.27Amending or replacing plan
Start here
Get a plain-English read of sec.27
Turn the raw legal text into a practical explanation grounded in Water Plan (Calliope River Basin) 2006.
sec.27 Amending or replacing plan
The Minister must consider amending this plan or preparing a new plan to replace this plan if the Minister is satisfied— authorisations in the plan area are not sufficient to meet emerging requirements for additional water; or there is a risk that taking, or interfering with, underground water in the plan area may significantly impact on the plan’s outcomes; or there is a risk that taking, or interfering with, underground water in the plan area may significantly affect— the availability of water for existing water entitlements; or the water requirements of natural ecosystems; or the quality of water; or this plan’s ecological outcomes under section 9 are not being achieved. s 27 amd 2016 SL No. 216 s 146 sch 20
- (a) authorisations in the plan area are not sufficient to meet emerging requirements for additional water; or
- (b) there is a risk that taking, or interfering with, underground water in the plan area may significantly impact on the plan’s outcomes; or
- (c) there is a risk that taking, or interfering with, underground water in the plan area may significantly affect— (i) the availability of water for existing water entitlements; or (ii) the water requirements of natural ecosystems; or (iii) the quality of water; or
- (i) the availability of water for existing water entitlements; or
- (ii) the water requirements of natural ecosystems; or
- (iii) the quality of water; or
- (d) this plan’s ecological outcomes under section 9 are not being achieved.
- (i) the availability of water for existing water entitlements; or
- (ii) the water requirements of natural ecosystems; or
- (iii) the quality of water; or