Water Plan (Border Rivers and Moonie) 2019
sch.7-sec.7Base flow
Start here
Get a plain-English read of sch.7-sec.7
Turn the raw legal text into a practical explanation grounded in Water Plan (Border Rivers and Moonie) 2019.
sch.7-sec.7 Base flow
An environmental flow objective for underground water to which this plan applies is that, at node M, the performance indicator mentioned in subsection (2) is at least 292.6mAHD. The performance indicator, for node M, is the 90 th percentile water level during the simulation period. (sch.7-sec.7-ssec.1) An environmental flow objective for underground water to which this plan applies is that, at node M, the performance indicator mentioned in subsection (2) is at least 292.6mAHD. (sch.7-sec.7-ssec.2) The performance indicator, for node M, is the 90 th percentile water level during the simulation period.