Water Plan (Border Rivers and Moonie) 2019
sch.7-sec.5Days with river-forming flow
Start here
Get a plain-English read of sch.7-sec.5
Turn the raw legal text into a practical explanation grounded in Water Plan (Border Rivers and Moonie) 2019.
sch.7-sec.5 Days with river-forming flow
An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection (2) is not less than what the performance indicator was immediately before the commencement. The performance indicator, for nodes A to K, is the total number of days with a river-forming flow at each node as a percentage of the total number of days in the simulation period. In this section— river-forming flow , at a node, means a daily water flow at the node that is more than the flow threshold stated for the node in the following table. Node Flow threshold (ML/day) A 22,000 B 9,000 C 4,400 D 9,600 E 110,000 F 165,000 G 73,000 H 1,000 I 4,600 J 1,000 K 13,000 (sch.7-sec.5-ssec.1) An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection (2) is not less than what the performance indicator was immediately before the commencement. (sch.7-sec.5-ssec.2) The performance indicator, for nodes A to K, is the total number of days with a river-forming flow at each node as a percentage of the total number of days in the simulation period. (sch.7-sec.5-ssec.3) In this section— river-forming flow , at a node, means a daily water flow at the node that is more than the flow threshold stated for the node in the following table. Node Flow threshold (ML/day) A 22,000 B 9,000 C 4,400 D 9,600 E 110,000 F 165,000 G 73,000 H 1,000 I 4,600 J 1,000 K 13,000