Water Plan (Baffle Creek Basin) 2010
sec.35Interference with water for the provision of a pumping pool
Start here
Get a plain-English read of sec.35
Turn the raw legal text into a practical explanation grounded in Water Plan (Baffle Creek Basin) 2010.
sec.35 Interference with water for the provision of a pumping pool
This section applies if the proposed interference with water is to provide a pumping pool to enable water to be taken under an authorisation. The proposed storage capacity of the pumping pool must not be greater than the capacity required to enable the pump to function properly while minimising the impact the proposed interference may have on the following— in-stream water levels; a matter mentioned in section 32 (2) (h) (i) to (ix) . In deciding the application, the chief executive must also consider any alternative methods for providing for the operation of the pump that may minimise the impact mentioned in subsection (2) . a pump well constructed in bed sand (sec.35-ssec.1) This section applies if the proposed interference with water is to provide a pumping pool to enable water to be taken under an authorisation. (sec.35-ssec.2) The proposed storage capacity of the pumping pool must not be greater than the capacity required to enable the pump to function properly while minimising the impact the proposed interference may have on the following— in-stream water levels; a matter mentioned in section 32 (2) (h) (i) to (ix) . (sec.35-ssec.3) In deciding the application, the chief executive must also consider any alternative methods for providing for the operation of the pump that may minimise the impact mentioned in subsection (2) . a pump well constructed in bed sand
- (a) in-stream water levels;
- (b) a matter mentioned in section 32 (2) (h) (i) to (ix) .