Water NSW Regulation 2026
Sch 1 s 2Controlled areas
Start here
Get a plain-English read of Sch 1 s 2
Turn the raw legal text into a practical explanation grounded in Water NSW Regulation 2026.
Sch 1 s 2 Controlled areas
2 Controlled areas
(1) The following controlled areas, being parts of land identified on the scheduled land map, including an area on which a water transfer structure is located—
(a) the Bendeela Pondage and pipeline as declared by order published in Gazette No 76 of 2 July 1999 at pages 4646 and 4647,
(b) the Kangaroo pipeline and Fitzroy Canal control structure as declared by order published in Gazette No 76 of 2 July 1999 at pages 4646 and 4647,
(c) the Upper Canal as proclaimed in Gazette No 76 of 2 July 1999 at pages 4646 and 4647,
(d) Warragamba pipelines as proclaimed in Gazette No 76 of 2 July 1999 at pages 4646 and 4647,
(e) Warragamba Controlled Area as proclaimed in Gazette No 175 of 30 November 2007 at pages 8705 and 8706.
(2) In this section—
water transfer structure means a canal, drainage channel, pipeline, tunnel or water main.
Warragamba pipelines means the pipelines that transfer water from Warragamba Dam to Prospect Reservoir.