Water Management (General) Regulation 2025
103Floodplain harvesting—certification of accuracy
Start here
Get a plain-English read of 103
Turn the raw legal text into a practical explanation grounded in Water Management (General) Regulation 2025.
103 Floodplain harvesting—certification of accuracy
103 Floodplain harvesting—certification of accuracy
(1) A duly qualified person who checks point-of-intake metering equipment for a water supply work for accuracy under Schedule 5, section 9 must give a certificate to the person for whom the check is undertaken certifying whether or not the maximum permissible error of the metering equipment exceeds plus or minus 5% in the field.
(2) A duly qualified person who checks storage metering equipment for a water supply work for accuracy under Schedule 5, section 9 must give a certificate to the person for whom the check is undertaken certifying whether or not the maximum permissible error of the metering equipment exceeds plus or minus 10mm in the field.
(3) The duly qualified person must give the certificate—
(a) in the approved form and manner, and
(b) within 7 days after the certification.
Maximum penalty for subsection (3)—100 penalty units.
s 103: Am 2025 No 70, Sch 4[1].