Waste Avoidance and Resource Recovery (Container Deposit Scheme) Regulation 2017
9APerformance targets
Start here
Get a plain-English read of 9A
Turn the raw legal text into a practical explanation grounded in Waste Avoidance and Resource Recovery (Container Deposit Scheme) Regulation 2017.
9A Performance targets
9A Performance targets
(1) A network operator agreement is to include performance targets for—
(a) the number of collection points to be operating in the area to which the agreement applies, and
(b) the hours of operation of those collection points.
(2) In determining the performance targets to be included in a network operator agreement, the Minister is to have regard to the community access principles set out in Schedule 1.
(3) A network operator agreement is to—
(a) specify the period to which the performance target applies, and
(b) provide for a protocol to be applied in determining whether the performance targets have been met during that period.
cl 9A: Ins 2017 (377), Sch 1 [1].