14 Waste levy compliance management plan
(1) An operator of a landfill facility must prepare a draft waste levy compliance management plan in accordance with subregulation (3) in respect of the landfill facility.
(2) An operator of a landfill facility must submit a draft waste levy compliance management plan prepared under this regulation to the Secretary for approval –
(a) if the landfill facility is in operation on the commencement day, within 60 days after the commencement day; or
(b) if the landfill facility is not in operation on the commencement day, before commencing operation of the landfill facility; or
(c) within the period specified in a requirement under subregulation (4)(c) .
(3) A draft waste levy compliance management plan is to –
(a) be consistent with Ministerial standards issued under section 56 of the Act in relation to the operation of a landfill facility, if any; and
(b) be prepared in accordance with guidelines, if any, issued under section 57 of the Act in relation to the operation of a landfill facility; and
(c) specify the following matters:
(i) the boundary of the landfill facility;
(ii) the location at which, and means by which, the waste is quantified;
(iii) the areas within the landfill facility in which waste is stockpiled;
(iv) the areas within the landfill facility in which operational materials are stockpiled;
(v) the location of active and planned landfill cells;
(vi) the access and security measures employed at the landfill facility to control and record waste entering and leaving the landfill facility;
(vii) the procedures in place to ensure compliance with the Act.