This local environmental plan replaces earlier local LEPs for Warrumbungle and sets the legal zoning, what uses are allowed or banned, when development consent is required, and mapped development standards (minimum lot sizes, earthworks, heritage, biodiversity, flood planning) plus local controls (for example, dark‑sky limits around Siding Spring Observatory).
It affects landowners, developers and the Council (the consent authority). Applicants pay application and compliance costs; the Council decides consents against mapped zones, development standards and specific tests for heritage, biodiversity, aquaculture and observatory lighting (cl 2.3; cl 5.10; cl 6.3; cl 5.19; cl 5.14).
Mechanically, this instrument is a Local Environmental Plan (LEP) for the Warrumbungle local government area. It: commences on the day it is published on the NSW legislation website (cl 1.1AA); applies to the land shown on its Land Application and Land Zoning Maps (cll 1.3, 2.2); and expressly repeals prior local environmental plans and deemed environmental planning instruments that applied only to that land (cl 1.8). The consent authority under the Plan is the Council, subject to the Environmental Planning and Assessment Act 1979 (the Act) (cl 1.6). The Plan incorporates a set of maps and schedules (for example the Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map and Wambelong Fire Dwelling Map) that determine how its clauses operate on particular parcels (cl 1.7; cll 4.1-4.2C; Schedules).
The Plan sets the local zoning regime (cl 2.1), prescribing zones including RU1 Primary Production, RU3 Forestry, RU5 Village, R1 General Residential, E1 Local Centre, E3 Productivity Support, E4 General Industrial, SP2 Infrastructure, RE1/RE2 Recreation and C1 National Parks and Nature Reserves. The Land Use Table at Part 2 establishes, by zone, the development that is permitted without consent, permitted with consent and prohibited (cl 2.3; Land Use Table). It also provides for exempt development and complying development regimes by reference to Schedules 2 and 3 and to State SEPPs (cl 3.1-3.3; notes to Land Use Table).
The Plan contains principal development standards for subdivision (minimum lot sizes and special rules for strata and community title schemes at cll 4.1, 4.1AA, 4.1A) and mechanisms for exceptions to development standards (cl 4.6). It adds numerous local provisions that create substantive planning controls and application-stage obligations: heritage (cl 5.10 and Schedule 5), biodiversity and riparian protections (cll 6.3, 6.5), groundwater vulnerability (cl 6.4), flood planning (cl 5.21), earthworks (cl 6.1), intensive livestock thresholds (cl 5.18), aquaculture rules (cl 5.19 and Schedule 6), dark-sky constraints tied to Siding Spring Observatory (cl 5.14), and protections for music at licensed premises (cl 5.20). The Plan also classifies and reclassifies public land in Schedule 4 and carries savings and transitional rules for applications made before commencement (cl 1.8A).
Current sections
Direct links to the current provisions in Warrumbungle Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.30[2]; 2023 (458), Sch 2.84.
Zone RU1 Primary Production
Zone RU3 Forestry
Zone RU5 Village
Zone R1 General Residential
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E3 Productivity Support
Zone E4 General Industrial
Zone SP2 Infrastructure
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Camping grounds; Car parks; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Freight transport facilities; Helipads; Highway service centres; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Mortuaries; Neighbourhood shops; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roads; Roadside stalls; Rural industries; Rural workers’ dwellings; Signage; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Warrumbungle Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Warrumbungle in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage sustainable economic growth and development in Warrumbungle,
(b) to encourage and provide opportunities for local employment growth and the retention of the population in Warrumbungle,
(c) to encourage the retention of productive rural land for agriculture,
(d) to identify, protect, conserve and enhance Warrumbungle’s natural assets,
(e) to identify and protect Warrumbungle’s built and cultural heritage assets for future generations,
(f) to facilitate the equitable provision of social services and facilities for the community,
(g) to provide for future tourist and visitor accommodation in a sustainable manner that is compatible with and will not compromise the natural resource and heritage values of the surrounding area.
The instrument states its planning aims (cl 1.2): protecting arts and cultural activity, encouraging sustainable economic growth and local employment, retaining productive rural land, conserving natural and built heritage assets, and providing for sustainable tourist accommodation. Those are claims of purpose in the text; the Plan then implements those aims by the mechanisms described above (zoning, permitted uses, development standards, and targeted local clauses such as eco‑tourist requirements at cl 5.13).
From an implementation and cost perspective the Plan creates specific, predictable triggers for consent and consultation, and thereby produces administrative and compliance burdens that fall on landowners and applicants. Examples include consultation requirements (observatory director for Siding Spring matters at cl 5.14(4), Heritage Council notification for archaeological sites at cl 5.10(7), and local Aboriginal community notice for Aboriginal places at cl 5.10(8)), map-based constraints (multiple thematic maps referenced in cll 1.7, 4.1-4.2C), and quantitative thresholds (lot sizes under cl 4.1, lumens thresholds and radii at cl 5.14). The Plan also creates avenues for discretion: the consent authority (Council) must be satisfied on many matters before granting consent (for example cll 2.8(3), 4.2B(3), 5.13(3), 5.19(2)), and the Planning Secretary retains a concurrence role for certain Siding Spring outcomes (cl 5.14(5), (7)). Those procedural and substantive mechanisms change private development choice by making some uses subject to more administrative steps and by reserving to the consent authority and relevant agencies the assessment of environmental and amenity impacts.
Finally, the Plan is expressly subject to any State environmental planning policy that prevails under s 3.28 of the Act (cl 1.9(1)). Where the Plan is silent on a particular standard (for example height of buildings, floor space ratio and related measures shown as not adopted at cll 4.3-4.5), controls at other levels of planning or by the consent authority will determine outcomes.
Main concepts
The Plan operates through a small set of recurring legal and spatial instruments. Understanding those is necessary to apply the instrument on particular applications.
Zones and Land Use Table (cl 2.1-2.3; Land Use Table). The Plan’s central organising device is zone-based permissibility. For each zone the Land Use Table sets objectives, what is permitted without consent, what requires consent and what is prohibited. The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)). This creates a rule-first, objective-guided decision framework: developers identify the zone, consult the Land Use Table and the relevant zone objectives, and then assess whether the proposed use is permitted, permissible with consent, or prohibited.
Maps as operative instruments (cl 1.7). Multiple maps are integral: Land Zoning Map, Lot Size Map, Minimum Lot Size,Dwelling House and Dual Occupancy Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Riparian Lands and Watercourses Map, Heritage Map, Wambelong Fire Dwelling Map and others. The Plan repeatedly makes obligations and prohibitions map-contingent (for example cl 4.1 applies to land shown on the Lot Size Map; cl 6.3 applies to land identified as “Biodiversity” on the Terrestrial Biodiversity Map). The maps are to be maintained and made available by the Minister and the Planning Portal (cl 1.7).
Consent architecture and exceptions. The Plan distinguishes exempt development (Schedule 2; cl 3.1), complying development (Schedule 3; cl 3.2), development permitted with consent (Land Use Table), and prohibited development (Land Use Table). It provides savings for development applications made before commencement (cl 1.8A), and a clause allowing limited suspension of private covenants to the extent necessary to enable development permitted by the Plan (cl 1.9A), while excluding certain conservation agreements and planning agreements from that suspension.
Development standards and exceptions. The Plan sets minimum subdivision lot sizes (cl 4.1) and contains an exceptions-to-standards clause (cl 4.6) allowing the consent authority to grant a variation where compliance is shown to be unreasonable or unnecessary and sufficient environmental planning grounds exist. The Plan explicitly excludes certain standards from that flexing power, for example BASIX commitments and development standards for complying development (cl 4.6(8)).
Thematic/local provisions. The Plan deploys targeted controls to protect local assets and manage specific activities: heritage (cl 5.10 and Schedule 5), Siding Spring dark-sky protection (cl 5.14), eco-tourist facility criteria (cl 5.13), aquaculture and intensive livestock thresholds and site rules (cll 5.18-5.19 and Schedule 6), flood planning (cl 5.21), riparian and groundwater protections (cll 6.5, 6.4), and earthworks management (cl 6.1). Each of these contains both matters a consent authority must consider and (in several cases) mandatory preconditions to consent.
Public land classification (cl 5.2; Schedule 4). The Plan classifies or reclassifies identified public land as operational or community land (see Schedule 4), and records that certain reclassifications discharge trusts for parts of land described (cl 5.2(5) and note).
Agency consultation and concurrence. Certain clauses require consultation and the taking into account of responses within statutory timeframes. Notably, cl 5.14 requires consultation with the Siding Spring Observatory director for lit development within 18 km and in a range of other circumstances, and requires the Planning Secretary’s concurrence before consent can be granted in several situations (cl 5.14(4)-(7), (10), (12)). Heritage and Aboriginal place assessments carry specific notification obligations and statutory 28-day windows for responses (cl 5.10(7)-(9)).
These concepts turn the LEP into a spatially differentiated rule set: the operative legal effect on any property depends on the parcel’s maps, zone, and the interaction of targeted clauses with the Land Use Table.
Who it affects
The Plan creates legal effects that fall across several distinct groups; the text identifies roles and obligations for each.
Landowners and applicants. Private holders of land in the Warrumbungle area are first-order subjects. The Plan determines permissible uses, minimum lot sizes for subdivisions, and conditions under which dwellings, rural worker dwellings, dual occupancies and other developments may be erected (cll 2.3; 4.1; 4.2A; 4.2B). Owners making development applications must engage with map-based constraints (Lot Size Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Wambelong Fire Dwelling Map etc.) and satisfy consent authority considerations such as impacts on biodiversity (cl 6.3), groundwater (cl 6.4), flood planning (cl 5.21) and heritage (cl 5.10). For example, cl 4.2C permits replacement dwellings on land identified on the Wambelong Fire Dwelling Map where the dwelling was damaged by the January 2013 Wambelong Fire.
Developers and businesses. Commercial applicants face zone-specific limits on floor areas and retail components (cl 5.4 controls such as maximum retail floor area for neighbourhood shops, industrial retail outlets and artisan food industries). Aquaculture operators are subject to site selection and operational requirements in cl 5.19 and Schedule 6 and may in some circumstances carry out oyster aquaculture without consent in priority areas (cl 5.19(6)). Intensive livestock operations below specified capacity thresholds may proceed without consent provided location restrictions are met (cl 5.18(4)-(5)).
Council (consent authority). The Plan designates the Council as consent authority (cl 1.6) and imposes on it primary decision responsibilities: determining applications, keeping records of assessments for exceptions to standards (cl 4.6(4)), and carrying out consultation and notification steps (cl 5.10(7)-(9), cl 5.14(12)). The Plan also allows the Council to classify or reclassify public land under the Local Government Act framework (cl 5.2).
State agencies and the Planning Secretary. The Planning Secretary has an explicit concurrence role for certain Siding Spring dark-sky related matters (cl 5.14(5), (7), (10)). The Plan also identifies particular State authorities as the relevant acquisition authority for owner-initiated land acquisition (cl 5.1(2) table: e.g., Transport for NSW for classified roads; Minister administering National Parks and Wildlife Act for National Park land).
Heritage and Aboriginal stakeholders. Heritage processes require the consent authority to notify and to consider responses from the Heritage Council for archaeological sites (cl 5.10(7)) and to notify local Aboriginal communities and take their responses into account for development in Aboriginal places of heritage significance (cl 5.10(8)). Schedule 5 identifies heritage items and heritage conservation areas to which those processes will apply.
Siding Spring Observatory (ANU). The clause protecting observing conditions (cl 5.14) makes the observatory director a recurrent consultation and advice recipient and introduces quantitative thresholds (lumens limits, distance radii) that directly affect development with lit components within certain distances.
Crown and other public authorities. The Plan preserves the Crown’s ability to carry out development under State SEPPs (cl 5.12) and preserves public authorities’ rights under registered instruments in relation to suspended covenants (cl 1.9A(3)). The Plan also identifies who will be the relevant State authority for acquisition of reserved land (cl 5.1(2)).
Who pays and who decides: applicants and landowners primarily pay the compliance and information costs for applications, studies and mitigation measures required by the Plan. The Council decides applications, with required consultation steps involving the observatory director, Heritage Council and local Aboriginal communities in specified circumstances (cll 5.14(4), 5.10(7)-(8)). The Planning Secretary is a gatekeeper for certain dark-sky outcomes (cl 5.14(5), (7)).
Key duties and rights
The Plan imposes multiple duties on applicants and the consent authority and establishes statutory rights of access to consultation and review pathways.
Duties on applicants and landowners
Check operative maps and zone rules before acting. Many clauses and prohibitions are map-contingent (cll 1.7; 4.1; 6.3; 6.4; 6.5; Schedule 6). Applicants must establish whether their land is subject to the Lot Size Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map or Riparian Lands and Watercourses Map and comply with related standards.
Obtain development consent where required. The Plan specifies numerous consent triggers: subdivision (cl 2.6), demolition (cl 2.7), temporary uses beyond the exempt period (cl 2.8), dwellings in RU1 (cl 4.2A), rural worker dwellings (cl 4.2B), and various forms of lit development near Siding Spring (cl 5.14). Exempt and complying development remain subject to their specific tests (cll 3.1-3.2).
Provide requisite technical material. Clauses expect adequate information in environmental statements and EISs where designated development or significant impacts may arise (see cl 5.18(3)(a) on adequacy of information for intensive livestock), and the EP&A Regulation requires a written demonstration where a development standard is proposed to be contravened under cl 4.6(3) (note in cl 4.6).
Design and manage development to avoid, minimise or mitigate impacts. Consent cannot be granted for biodiversity, groundwater, riparian or aquaculture-related development unless the consent authority is satisfied that development is designed, sited and managed to avoid or, if avoidance is impossible, minimise or mitigate significant adverse impacts (cll 6.3(4), 6.4(4), 6.5(4), 5.19(3)-(4)).
Comply with specified quantitative limits. Certain uses are subject to numeric maxima: e.g., bed and breakfast accommodation limited to 5 bedrooms (cl 5.4(1)); home business floor area limited to 50 m2 (cl 5.4(2)); neighbourhood shop retail area limited to 100 m2 (cl 5.4(7)); neighbourhood supermarket limited to 1,000 m2 (cl 5.4(7AA)); lumens and shielded fitting thresholds tied to Siding Spring (cl 5.14(5)-(7)).
Duties on the consent authority (Council)
Apply zone objectives and make reasoned assessments. The Granting of consent requires regard to zone objectives (cl 2.3(2)) and to a range of mandatory matters in specific clauses (e.g., cll 2.8(3), 5.10(4)-(6), 5.13(3), 5.19(2)).
Keep records for exceptions to standards. Where cl 4.6 is used to contravene a development standard, the consent authority must keep a record of the assessment (cl 4.6(4)).
Carry out specified consultations and notifications. For example, the consent authority must notify the Heritage Council before granting consent for development on archaeological sites and must consider any response within 28 days (cl 5.10(7)); it must consult the observatory director for lit development within 18 km and for specified classes 18 km or more where lumens thresholds are implicated (cl 5.14(4), (8)-(9), (12)).
Rights and procedural protections
Applicants retain the right to seek consent and to apply for variations under clause 4.6, subject to the documentary requirements described in the EP&A Regulation (cl 4.6(3) and note).
Applicants with pre-commencement development applications have a savings protection: applications made before the Plan commenced and not finally determined must be determined as if the Plan had not commenced (cl 1.8A).
The Plan provides rights for third-party consultation: the Heritage Council and local Aboriginal communities have a statutory right to receive notice and to be consulted in specified heritage settings (cl 5.10(7)-(9)), and the observatory director must be consulted in Siding Spring-related lit development (cl 5.14(4), (12)).
Discretion and checks
The Plan grants the consent authority substantive discretion in many matters (for example whether temporary uses will prejudice future development cl 2.8(3)(a); whether an eco-tourist facility demonstrates a connection to ecological values cl 5.13(3)(a)). However, it also prescribes hard limits the consent authority cannot circumvent (for example, clause 4.6(8) excludes certain standards from variation and cl 5.14(5)-(7) places lumens/distance limits requiring Planning Secretary concurrence to depart from).
In sum, duties are both procedural (notification, consultation, record-keeping) and substantive (design to avoid/minimise/mitigate environmental impacts, satisfy quantitative maxima, adhere to lot size limits), while rights gravitate around application and consultation processes and limited pathways to seek an exception to standards.
Penalties and enforcement
The LEP text itself sets land use permissions, procedural obligations and consultation duties but does not specify monetary penalties or enforcement mechanisms within its own clauses. Enforcement and penalties for breach of planning controls under this LEP are governed by the Act and its regulations. The Plan repeatedly operates “subject to the Act” (for example cl 1.6) and integrates with the Act’s process architecture (e.g., references to Division 3.5 of the Act in cl 1.8A note and to Division 7.1 planning agreements in cl 1.9A(2)(g)). This means:
Primary enforcement regimes, penalties and compliance tools are those contained in the Environmental Planning and Assessment Act 1979 and associated regulations, which provide for: requiring consent where necessary, refusing or imposing conditions on consent, issuing stop-work or enforcement notices, and prosecuting unauthorised development (the Plan does not re‑state those powers but sits within that statutory framework , see cl 1.6 and multiple cross-references to the Act).
Record-keeping and procedural compliance. The Plan imposes procedural obligations practitioners and consent authorities must follow (for example the consent authority must keep a record when exercising cl 4.6(4)). Failure to follow those procedural requirements could be relevant to judicial review or to the exercise of enforcement powers under the Act, but the LEP does not create a separate penalty schedule.
Third-party review and agency sanctions. Some clauses engage external agencies whose views affect consent outcomes. Examples: the Heritage Council and local Aboriginal communities receive statutory notifications (cl 5.10(7)-(8)); the observatory director is a statutory consultee for Siding Spring matters (cl 5.14(4), (12)); the Planning Secretary must give concurrence to certain lit development (cl 5.14(5), (7)). Non-compliance with consultation or concurrence processes can lead to administrative invalidity of a consent or be a ground for internal or external review processes under the Act and judicial review.
Obligations unaffected by the Plan. The Plan repeatedly notes that exempt development under the Plan remains subject to approvals, licences or authorities required under other Acts (Schedule 2 note; cl 3.1(5) reference to Building Code of Australia compliance). Consequently, licence breaches under separate statutes (for example the Heritage Act 1977, Native Vegetation Acts, Crown land instruments) may produce separate enforcement or penalty regimes independent of the LEP.
Operational implication for practitioners: the Plan transfers most enforcement and penalty detail to the Act and other statutory regimes. Legal risk for applicants arises from failing to obtain required consent, failing to follow mandatory consultation/notification steps (which may render a consent vulnerable), or failing to observe external licences and approvals required under other statutes referenced by the Plan (for example compliance with the Heritage Act or Fisheries/aquaculture licensing regimes referenced in cl 5.19 and Schedule 6).
How it interacts with other laws
The Plan is explicitly framed as part of the NSW planning and regulatory architecture and contains multiple cross-references to other statutory instruments and policies. Practitioners must therefore treat the LEP as one component of a layered regulatory environment.
Relationship with the Environmental Planning and Assessment Act 1979 (the Act). The LEP is made under the Act and repeatedly operates “subject to the Act” (cl 1.6; cf. cl 1.2 note invoking section 3.20 of the Act for conformity with the standard instrument). Key procedural duties (consent authority role, application processes, exceptions to standards procedure under cl 4.6 which is accompanied by EP&A Regulation documentary requirements) derive from the Act and its regulations. The Plan’s savings provision for pre-commencement applications references Division 3.5 of the Act and how such applications may be considered alongside draft instruments (cl 1.8A note).
State Environmental Planning Policies (SEPPs). Clause 1.9(1) makes the Plan subject to any SEPP that prevails (section 3.28 of the Act). The Plan’s Land Use Table notes a list of State SEPPs that may be relevant (for housing, transport and infrastructure, resources and energy, resilience and hazards, industry and employment, primary production). Clause 1.9(2) indicates some SEPP provisions may be excluded for this land, but the text provided contains no list; practitioners should verify whether any SEPP exclusions are recorded on the consolidated LEP or on the Planning Portal.
Local Government Act 1993. The Plan’s Schedule 4 and cl 5.2 concern classification and reclassification of public land as operational or community land and refer to Part 2 of Chapter 6 of the Local Government Act 1993. The Plan notes Governor approval may be required to discharge trusts when public land is reclassified (cl 5.2 note and cl 5.2(5)).
Heritage and Aboriginal law. The Plan engages the Heritage Act 1977 and requires coordination with the Heritage Council in archaeological contexts and nominated State heritage items (cl 5.10(7), (9)). It also requires consent for works that affect Aboriginal objects or places of heritage significance and requires notification of local Aboriginal communities (cl 5.10(2), (8)). The Plan cross-references the National Parks and Wildlife Act 1974 in relation to land reserved under that Act (cl 1.9A(2)(c); cl 5.12(1); cl 5.2).
Fisheries and aquaculture statutes. Clauses on aquaculture (cl 5.19 and Schedule 6) link to the Fisheries Management Act 1994 and its aquaculture planning instruments and strategies; they require consideration of industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19(5)-(6), Schedule 6 definitions).
Rural fires, biodiversity and native vegetation regimes. The Plan permits bush fire hazard reduction authorised by the Rural Fires Act 1997 to be carried out without development consent (cl 5.11), and it identifies biodiversity protections that intersect with SEPP chapters and the Biodiversity Conservation Act 2016 (e.g. conservation exclusion zones in Schedule 6 reference areas declared under the Biodiversity Conservation Act).
Building Code and BASIX. Exempt development and complying development tests require compliance with Building Code of Australia provisions (cl 3.1(3)(a)-(b)). Clause 4.6(8) excludes BASIX commitments from the operation of the exceptions-to-standards clause.
Land acquisition and Crown instruments. Clause 5.1 designates the relevant State acquisition authority for owner-initiated acquisitions under the Land Acquisition (Just Terms Compensation) Act 1991 and declares that development on land acquired by a State authority may be carried out with consent for any purpose before the land is used for the reserved purpose (cl 5.1(3)). Clause 1.9A suspends private covenants to the extent necessary to enable development permitted by this Plan, but excludes Crown land instruments, conservation agreements and planning agreements (cl 1.9A(1)-(2)).
Practically, the Plan must be read and applied alongside these other laws. Permissibility under the LEP does not displace the need to obtain approvals or licences required under other statutes (Schedule 2 note). Clause-by-clause interactions are frequent: for example a proposed pond-based aquaculture project must satisfy Schedule 6 site and operational requirements and also any fisheries licences and other regulatory approvals outside the LEP (cl 5.19 and Schedule 6 note).
Amendment history
The Plan’s text records a number of discrete amendments and insertions. The instrument itself lists the amendment references appended to particular clauses or schedules. Key recorded amendments and insertions in the text supplied include:
Clause 1.8A (Savings provision relating to development applications) , inserted/amended: Am 2019 (621), Sch 5[1] (cl 1.8A notes this amendment).
Clause 1.9A (Suspension of covenants, agreements and instruments) , Amended: Am 2019 (621), Sch 5[2]-[4].
Clause 2.1 (Land use zones) , Amended to reflect newer zone list: Am 2022 (832), Sch 1.30[1].
Land Use Table and related entries , multiple amendments recorded in the Land Use Table heading: Am 2016 (168), Sch 1[2]; 2017 (493), Sch 1.1[1]; 2022 (314), Sch 1; 2022 (832), Sch 1.30[2]; 2023 (458), Sch 2.84.
Clause 4.2A (Erection of dual occupancies and dwelling houses on land in Zone RU1) , Amended: Am 2015 (596), cl 4 (1)-(3).
Clause 4.2C (Erection of dwellings on land affected by Wambelong Fire) , Inserted: Ins 2018 (516), cl 5 (1).
This list is limited to the amendment references explicitly shown in the Plan text supplied. Practitioners should consult the consolidated LEP on the NSW Planning Portal for the full, up-to-date amendment chronology and for any more recent changes not reflected in this document extract. The Plan also contains notes directing users to State policies and technical map requirements, which are updated separately (cl 1.7 note).
Litigation history
The Plan text supplied does not record any court or tribunal decisions interpreting its provisions. It does not name cases or include judgments. Consequently, there is no litigation history recorded within the instrument itself to cite. Practitioners seeking precedent or judicial interpretation should conduct searches of NSW Land and Environment Court and other jurisdictional decisions for matters referencing the Warrumbungle Local Environmental Plan 2013 or its particular clauses (for example disputes over cl 5.14 Siding Spring constraints, cl 4.6 exceptions to development standards, or cl 5.10 heritage requirements). The LEP’s own record of amendments and its cross-references to the Act mean that litigation will often involve the interaction of Plan clauses with the Act and with State policies.
Note: the Plan includes specific provisions (for example subclause timeframes for responses from the Heritage Council and observatory director) that create administrative steps; failure to follow the Plan’s required procedures may be a relevant factor in any judicial review or merits appeal under the Act. But no decisions are cited in the text itself.
Gotchas
The Plan contains a number of technical traps and operative features that commonly lead to dispute or compliance failure. These are concrete mechanics that practitioners must watch for.
Map dependence and multiple thematic overlays. Many prohibitions and consent preconditions are tied to map labels (Lot Size Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Groundwater Vulnerability Map, Wambelong Fire Dwelling Map). An application’s permissibility can hinge on a single map annotation. Always check the current Planning Portal maps because the Plan treats maps as operative and subject to amendment (cl 1.7). Overlooking a map overlay can convert a permissible use into one requiring consent or into a prohibited use (see cll 4.1, 6.3, 6.4, 6.5, 4.2C).
Clause 1.8A savings can be counter‑intuitive. If an application was made before this LEP commenced and had not been finally determined at commencement, it must be decided as if the LEP had not commenced (cl 1.8A). That can preserve an applicant’s entitlement under an old instrument, but Division 3.5 of the Act also permits simultaneous public exhibition of a draft instrument and an associated application, so developers should verify which regime applies in transitional scenarios.
Suspension of covenants has limits. Clause 1.9A suspends private covenants to the extent necessary to enable development permitted under the Plan, but it excludes covenants imposed by the Council, relevant Crown instruments, conservation agreements and planning agreements (cl 1.9A(2)). Public authority interests under registered instruments are unaffected (cl 1.9A(3)). The “extent necessary” standard is factual and may be contested.
Exceptions-to-standards requires documentary proof and is limited. Under cl 4.6 the consent authority may allow contravention of a development standard only where the applicant demonstrates compliance would be unreasonable or unnecessary and where there are sufficient environmental planning grounds. The EP&A Regulation requires a supporting document. Certain standards are excluded from cl 4.6, including complying development standards and BASIX commitments (cl 4.6(8)), and cl 4.6(6) bars subdivision consents that would create multiple lots under the minimum area or lots below 90% of the minimum area for certain zones.
Siding Spring thresholds are quantitative and involve multiple decision-makers. Clause 5.14 sets hard lumens limits and radii (12 km and 18 km) and requires consultation with the observatory director and Planning Secretary concurrence for departures. The Planning Secretary must weigh observatory comments and public interest factors (cl 5.14(10)). For lit development the consent authority may not grant consent without concurrence where particular thresholds are exceeded (cl 5.14(5)-(7)). This clause imposes an extra, technical gate that can materially delay or block consent for lit development and external lighting solutions.
Heritage and Aboriginal process timeframes can be outcome-determinative. For archaeological sites (cl 5.10(7)) and nominated State heritage item demolition (cl 5.10(9)), the consent authority must notify the Heritage Council and take into account any response within 28 days. For Aboriginal places (cl 5.10(8)), local Aboriginal communities must be notified and responses considered within 28 days. Practitioners must build these statutory windows into project timelines.
Missing standard controls in the LEP may create gaps. The Plan shows “Not adopted” for height, floor space ratio and some calculation provisions (cll 4.3-4.5). That silence does not mean development is unconstrained; other planning instruments, DCPs or the consent authority may impose controls. Do not assume an absence of LEP numeric controls eliminates design constraints.
Food‑use and retail ceilings are strict. Clauses on industrial retail outlets, artisan food and drink industries, neighbourhood shops and neighbourhood supermarkets impose floor area limitations (cl 5.4(4), (10), (7), (7AA)). Those ceilings, combined with the Land Use Table permissibility, limit mixed-use retail strategies without explicit consent and can affect viability calculations.
Aquaculture and intensive livestock thresholds are both capacity- and location-sensitive. Clause 5.18 allows small-scale intensive livestock agriculture to proceed without consent only if site location restrictions are satisfied (for example minimum separation distances from dwellings and other farms). Clause 5.19 and Schedule 6 set site exclusions and operational rules for pond- and tank-based aquaculture; they also limit freshwater discharges in intensive aquaculture and require screening of outlets to avoid fish escape. Overlooking these technical requirements risks non-compliance with both the LEP and separate fisheries licensing regimes.
Temporary use cap and sales office exception. Temporary use consent is limited to a maximum of 52 days in any 12-month period (cl 2.8(2)). There is an exception allowing a dwelling to operate as a sales office for new release areas beyond that cap (cl 2.8(4)). Applications relying on temporary use frameworks must demonstrate non-prejudice to future development and restoration measures (cl 2.8(3)(a),(d)).
Public land reclassification requires additional approvals. Clause 5.2(5) notes that reclassification of public land in Part 2 of Schedule 4 ceases the land to be a public reserve and discharges trusts, but that the Governor’s approval is required under section 30(2) of the Local Government Act 1993 for certain operations. Practitioners should not assume reclassification is a purely local administrative act.
These are operational mechanics, not policy judgments. Each “gotcha” is anchored in an explicit clause; checking the relevant clauses and maps at the outset of project planning avoids material surprises.
How to comply
Complying with the LEP requires a structured, map-led, evidence-based approach. The following is a practical step-by-step checklist, tied to the Plan clauses, for practitioners preparing a development application or advising clients.
Establish the parcel’s operative maps and zones.
Consult the Land Zoning Map, Lot Size Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Riparian Lands and Watercourses Map, Wambelong Fire Dwelling Map, Heritage Map and any other maps referenced in the Plan (cl 1.7; cll 4.1, 6.3-6.5, 4.2C, 5.10). The Planning Portal will show the consolidated maps. The parcel’s zone determines which row of the Land Use Table applies (cl 2.2; cl 2.3).
Identify applicable permissibility and thresholds.
Read the Land Use Table entry for the zone to determine if the proposed use is permitted without consent, permitted with consent, or prohibited (cl 2.3).
Check numeric caps in cl 5.4 (bed and breakfast bedrooms, home business floor area, home industry, neighbourhood shop/supermarket ceilings, industrial retail outlet caps) and zone-specific prohibitions in the Land Use Table.
For subdivision proposals, confirm minimum lot sizes on the Lot Size Map and the applicability of cl 4.1, and consider cl 4.1AA/4.1A where strata or community title schemes are proposed.
Verify whether development is exempt or complying.
Check Schedule 2 and State SEPPs for exempt development (cl 3.1) and Schedule 3 and State SEPPs/EP&A Regulation for complying development (cl 3.2). Even if development is exempt under the LEP, confirm other statutory approvals or licences required under other Acts (Schedule 2 note).
For sensitive activities, prepare required specialist reports.
Biodiversity: if land is identified as “Biodiversity” on the Terrestrial Biodiversity Map, prepare a biodiversity assessment and show how the proposal avoids, minimises or mitigates impacts (cl 6.3(3)-(4)).
Riparian/Watercourses: where the site falls within the 40 m riparian buffer or watercourse mapping, prepare a hydrological and riparian impact assessment addressing water quality, bank stability and fish passage (cl 6.5(3)-(4)).
Groundwater: if the Groundwater Vulnerability Map applies, prepare groundwater contamination and groundwater-dependent ecosystem impact analysis (cl 6.4(3)-(4)).
Heritage and Aboriginal: for heritage items or archaeological sites (Schedule 5; cl 5.10) prepare heritage management documents or heritage impact statements and be prepared to notify the Heritage Council; for Aboriginal places notify local Aboriginal communities and prepare adequate assessment (cl 5.10(4)-(8)).
Flooding: if land is within a flood planning area, prepare flood impact assessment consistent with the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual and show evacuation and risk minimisation measures (cl 5.21(2)-(3)).
Address Siding Spring dark-sky requirements where relevant.
If the proposal involves lit development within 18 km of Siding Spring Observatory, the consent authority must consult the observatory director and may not grant consent for certain outcomes without Planning Secretary concurrence (cl 5.14(3)-(6), (12)). Check lumens limits and shielded fitting requirements; design lighting to minimise light pollution, avoid visibility above ridgelines and specify shielding and automatic fittings where appropriate (cl 5.14(2), (5)-(6)).
For exceptions to standards, prepare the required demonstration.
If the proposal seeks to contravene a development standard, prepare the detailed statement required by the EP&A Regulation explaining why compliance is unreasonable or unnecessary and articulating sufficient environmental planning grounds (cl 4.6(3); note in cl 4.6). Record-keeping by the consent authority will follow (cl 4.6(4)).
Build consultation, notification and statutory timeframes into the project plan.
Heritage Council responses for archaeological sites and demolition of state items: 28 days (cl 5.10(7), (9)).
Local Aboriginal communities for Aboriginal places: 28 days (cl 5.10(8)).
Observatory director: 21 days for written comments after notice (cl 5.14(12)).
Allow for Planning Secretary concurrence if required under cl 5.14; the Planning Secretary’s decision will consider observatory comments and public interest (cl 5.14(10)).
Demonstrate essential services and on-site arrangements.
The consent authority must be satisfied that essential services (water supply, electricity, sewage disposal, stormwater and vehicular access) are available or arrangements are in place (cl 6.6). For unsewered sewerage-disposal systems, council approvals under the Local Government Act may be required for complying development (cl 3.2(3)(c)).
Ensure coordination with other regulatory approvals.
Confirm licences and approvals under other statutes: fisheries/aquaculture licences for aquaculture (cl 5.19 and Schedule 6), Heritage Act approvals where State heritage is implicated (cl 5.10), water extraction and discharge licences, Rural Fires Act considerations for bush fire hazard reduction (cl 5.11), and any Crown land permissions where the land is Crown-owned (cl 1.9A(3); cl 5.12).
Check public land classification consequences.
If the proposal involves public land listed in Schedule 4, confirm the classification and whether any trusts, reservations or conditions remain on the land (cl 5.2(2)-(5); Schedule 4 parts).
Draft conditions and management strategies consistent with Plan obligations.
For eco-tourist facilities require a management strategy addressing regeneration, monitoring, energy and water efficiency, waste minimisation and avoidance of visual intrusion (cl 5.13(3)(g)-(k)).
For farm stay accommodation ensure guest accommodation sits on the same lot as a lawful dwelling or meets lot size minima and consider noise, visual amenity, flora and fauna, water quality, traffic and bushfire/flood constraints (cl 5.24(2)-(4)).
Account for timing and transitional rules.
If relying on pre-commencement entitlements, ensure the application status meets the criteria in cl 1.8A and confirm whether the application must be decided under the prior instrument.
Use the Plan’s process rights where appropriate.
If refused or if cl 4.6 is denied, advise clients of appeal and review rights under the Act and that the Plan requires the consent authority to keep assessment records for departures (cl 4.6(4)). Also, document the consultation and reasons given in the decision record.
Maintain documentary discipline.
The Plan requires some specific documents (heritage management documents, heritage conservation management plans, EIS where designated, aquaculture compliance with Part 1 of Schedule 6). Ensure those documents are explicit about how the development will avoid, minimise or mitigate impacts as required by the respective clauses (cll 5.10(5)-(6), 5.19(3), 6.3(3)-(4), 6.5(3)-(4)).
This is an operational compliance roadmap driven by the LEP’s map‑based permissions, clause-specific preconditions and consultation and notification duties. Practitioners should confirm the current consolidated LEP and Planning Portal layers because maps and certain clause applications may have been updated since the text excerpt provided.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Coolah Local Environmental Plan 2000
Coonabarabran Local Environmental Plan 1990
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
cl 2.1: Am 2022 (832), Sch 1.30[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
This is an opening excerpt, not the complete document.