This Local Environmental Plan (LEP) sets the zoning, maps and rules that determine what land uses are allowed, need Council consent, or are prohibited across Wagga Wagga, and establishes technical standards for subdivision, building height, floor space, heritage, flood and environmental overlays. The Council is the consent authority (cl 1.6). Developers and landowners must obtain consents, meet mapped lot sizes and standards, and fund studies or infrastructure where required; the Plan uses permitted uses, minimum lot sizes, exemptions and discretionary exceptions (cl 4.6) to change development incentives (see cl 5.21, Schedule 5).
This instrument is the Wagga Wagga Local Environmental Plan 2010 (the Plan). Mechanically it does the following:
Establishes the Plan as the local environmental planning instrument for the geographic area shown on the Land Application Map and Land Zoning Map, and provides its commencement rule (cl 1.1AA; cl 1.3). The maps are authoritative and may be amended or replaced with the approval of the local plan‑making authority (cl 1.7).
Declares the consent authority for the Plan as the Council, subject to the Environmental Planning and Assessment Act 1979 (the Act) (cl 1.6).
Repeals prior local environmental plans and deemed instruments that applied to the same land (cl 1.8), and provides a savings rule for development applications lodged and not finally determined before commencement (cl 1.8A).
Creates the zoning framework (Part 2): a set of named zones (cl 2.1) with objectives and a Land Use Table that specifies, for each zone, uses permitted without consent, uses permitted with consent and prohibited uses (cl 2.3, Land Use Table). The Land Use Table and multiple maps (Lot Size, Height, Floor Space Ratio, Heritage, Water Resource, Terrestrial Biodiversity, Vulnerable Land, North Wagga restrictions, Noise Exposure Forecast Contour Map etc) are the operative spatial controls (cl 2.2; cl 1.7).
Sets out processes for exempt and complying development and the conditions applicable to those categories (Part 3, cl 3.1-3.3; Schedule 2; Schedule 3). It excludes environmentally sensitive areas from being treated as exempt or complying development (cl 3.3).
Imposes principal development standards (Part 4) including minimum subdivision lot sizes (cl 4.1), exceptions for split zones and community title schemes (cl 4.1A; 4.1AA), rural subdivision flexibility (cl 4.2), controls on erection of dwelling houses and dual occupancies in certain zones (cl 4.2A), strata subdivision limits (cl 4.2B), height limits (cl 4.3), floor space ratio (cl 4.4) and calculation rules including avoidance of “double dipping” (cl 4.5). It includes a clause allowing, in specified circumstances, consent to contravene a development standard subject to justification and exclusions (cl 4.6).
Current sections
Direct links to the current provisions in Wagga Wagga Local Environmental Plan 2010.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Aquaculture; Artisan food and drink industries; Bed and breakfast accommodation; Cellar door premises; Dual occupancies; Dwelling houses; Extractive industries; Farm buildings; Farm stay accommodation; Hardware and building supplies; Home industries; Intensive livestock agriculture; Intensive plant agriculture; Markets; Open cut mining; Roadside stalls; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Timber yards; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Airports; Amusement centres; Camping grounds; Caravan parks; Commercial premises; Crematoria; Eco-tourist facilities; Entertainment facilities; Exhibition homes; Exhibition villages; Freight transport facilities; Function centres; Health services facilities; Heavy industrial storage establishments; Home occupations (sex services); Industrial training facilities; Industries; Local distribution premises; Mortuaries; Passenger transport facilities; Recreation facilities (indoor); Registered clubs; Residential accommodation; Restricted premises; Sex services premises; Storage premises; Tourist and visitor accommodation; Transport depots; Truck depots; Vehicle body repair workshops; Vehicle repair stations; Warehouse or distribution centres; Wharf or boating facilities; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Public open space” | Land and Housing Corporation |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning is required to take action to enable the designation of the acquiring authority under this Part. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
Note.
At the time this Plan was made no land in the zones listed in the Table to subclause (2) was included on the Land Reservation Acquisition Map.
cl 5.1: Am 2024 (552), Sch 1.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban or industrial purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) If there was no minimum lot size specified for the land immediately before the land became, or became part of, an urban release area, development consent must not be granted for the subdivision of the land unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(4) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot created by a subdivision previously consented to in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(5) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
7 Restriction on new dwellings at North Wagga Wagga
7.1 Restriction on new dwellings at North Wagga Wagga
(1) The objective of this clause is to prevent intensified residential development on flood planning land in North Wagga Wagga and to control the replacement of, and alterations or additions to, lawfully erected dwellings on that land.
(3) Despite any other provision of this Plan, development consent must not be granted for the erection of a new dwelling on land to which this clause applies unless the consent authority is satisfied that—
(a) the new dwelling is a replacement dwelling, and
(b) any habitable floor space contained within the replacement dwelling is above the flood planning level, and
(c) any non-habitable floor space below the flood planning level does not create an unreasonable risk of injury to persons or damage to property, and
(d) adequate arrangements have been made for the demolition and removal of the dwelling it replaces.
(4) Development consent must not be granted to a development application for the carrying out of alterations or additions to an existing dwelling on land to which this clause applies unless the consent authority is satisfied—
(a) that the dwelling as proposed to be altered or added to will be substantially the same as the existing dwelling, and
(b) if the existing dwelling does not contain habitable floor space below the flood planning level, the alterations or additions will not create any floor space below the flood planning level, and
(c) if the existing dwelling already contains habitable floor space below the flood planning level, the alterations or additions, when taken together with any alterations or additions for which development consent has been granted, will not result in the amount of habitable floor space below the flood planning level created by alterations or additions, exceeding 50 square metres, and
(d) if the alterations or additions will raise the height of the floor level of the entire dwelling, the finished floor level of the dwelling will be at or above the flood planning level.
(5) In determining whether a dwelling as proposed to be altered or added to will be substantially the same as the existing dwelling, the consent authority must have regard to the following matters—
(a) the extent to which the structural elements of the existing dwelling (such as the walls, roof and slab footings) will be altered, removed or replaced by the alterations or additions,
(b) the extent to which the bulk and scale of the existing dwelling will be changed by the alterations or additions, including any additional amount of floor space or storeys,
(c) any other factors that the consent authority considers relevant.
(6) A reference in subclause (4)(c) to development consent is a reference to a development consent granted under this Plan or Wagga Wagga Local Environmental Plan 1985 (before its repeal), but does not include a development consent that has been surrendered or has lapsed.
(7) In this clause—
flood planning level means the level of a 1:100 ARI (average recurrent interval) flood event plus 0.5 metre freeboard.
replacement dwelling means a dwelling that is lawfully erected and that replaces—
(b) a lawfully erected dwelling that has replaced a dwelling referred to in paragraph (a).
Note.
Development for the purpose of alterations or additions to which this clause applies that is exempt or complying development under the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 (in particular, the Housing Alterations Code in that Policy) may be carried out as exempt or complying development in accordance with that Policy.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch.2-sec Change of use—exhibition home to dwelling
Change of use—exhibition home to dwelling
(1) Current use must be a lawful use and must not be an existing use within the meaning of section 106 of the Act.
(2) New use must be permissible in the land use zone in which it is carried out.
(3) Must not involve any building alterations or additions that are not a type of exempt development.
(4) The size of the lot must not be less than the minimum size shown on the Lot Size Map in relation to that land.
(5) Must have at least 1 off-street car parking space.
sch.2-sec-oc.2
Emergency services facilities
sch.2-sec-oc.2 Emergency services facilities
Emergency services facilities
(1) Must be for the use of the NSW Rural Fire Service.
(2) Must have obtained all required approvals.
(3) Must not be constructed or installed on or in a heritage item, heritage conservation area, land on which an Aboriginal item is located or land within the flood planning area (within the meaning of clause 5.21).
(4) Must be located on land in Zone RU1 Primary Production.
(5) Must not have an area of more than 140m2.
(6) Must not exceed a height of 5m above ground level (existing).
(7) Must be located at a distance of at least 20m from the primary road frontage and at least 10m from any other lot boundary.
(8) Must not be constructed or installed within 50m of a dwelling.
(9) Must be located at least 50m from any natural waterbody.
(10) To the extent it is comprised of metal components—must be constructed of low reflective materials and designed and constructed in accordance with a professional engineer’s specifications.
(11) If it is located on bush fire prone land—must be constructed in accordance with Planning for Bush Fire Protection.
sch.2-sec-oc.3
Signage—projecting wall signs
sch.2-sec-oc.3 Signage—projecting wall signs
Signage—projecting wall signs
(1) Must only be a building identification sign or business identification sign.
(2) Must not be located on or in, or in relation to, a heritage item and not within a heritage conservation area.
(3) Must be attached to the wall of a building (other than the transom of a doorway or display window).
(4) Must not project horizontally more than 300mm.
(5) Must be at least 2.7m above ground level (existing).
(6) Must be erected at right angles to the wall of the building to which it is attached.
(7) Must not be erected below an awning if there is an existing under awning sign associated with the premises.
(8) Must not cover existing windows or doors.
(9) Must be non-flashing and non-illuminated.
(10) Must be constructed of non-reflective materials.
(11) Maximum area of sign—1.5m2.
(12) Maximum number of building identification signs—1 per building.
(13) Maximum number of business identification signs—1 per business.
sch.2-sec-oc.4
Temporary commercial, community or retail events or private functions
sch.2-sec-oc.4 Temporary commercial, community or retail events or private functions
Temporary commercial, community or retail events or private functions
(1) Must be located on Council-owned land or land for which the Council has care, control or management.
(2) Must have obtained the written consent of Council.
(3) Must have obtained all required approvals.
(4) Must not involve the closure of any public roads.
(5) Must not have a duration of more than 1 day in any 12-month period.
(6) Total number of people attending the event must not exceed 1,000 at any time.
(7) Must not involve the selling of liquor.
(8) Must not involve any permanent physical change to any land.
(9) Lighting must be provided to facilitate the safe movement of patrons, must not cause glare to adjoining properties and must comply with AS 4282—1997, Control of the Obtrusive Effects of Outdoor Lighting.
(10) Event (including set up and pack down) must take place only during the following periods—
(a) 7.00 am to 10.00 pm on Monday, Tuesday, Wednesday, Thursday, Friday or Saturday,
(b) 8.00 am to 10.00 pm on Sunday.
(11) Toilet facilities must be available as follows—
(a) female facilities—at least 3 toilets and 1 hand basin,
(b) male facilities—at least 1 toilet, 1m length of urinal troughs and 1 hand basin.
(1) Must be located on Council-owned land or land for which the Council has care, control or management.
(2) Must be for the purposes of promoting a civic or community event (including a public exhibition, a festival, a sporting event, a charity event or the like) to be held in the Council’s local government area.
(3) Must not include advertising of a commercial nature, other than the name of the event’s sponsor or a small logo.
(4) Must not be illuminated or reflective.
(5) Must be removed within 2 days after the event.
(6) Must be located on a site designated by the relevant guidelines issued by the Council in relation to temporary event signage.
(7) Maximum 1 sign on each designated site.
(8) Must not be higher than 5m above ground level (existing).
(9) Must not have a surface area of more than 6m2.
(10) Must not be located on or visible from a classified road.
(11) Must be wholly located within the boundaries of the property or, if attached to a building, fence or wall, not project more than 100mm from the building, fence or wall.
(12) Must not obstruct or interfere with traffic signs.
(13) Must not be permanently fixed to a building, fence, wall, electricity pole, tree or traffic sign.
(14) Must only be displayed on the Council-owned fixtures provided at each designated site.
(15) Must not be displayed earlier than 14 days before the event.
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Wagga Wagga Local Environmental Plan 2010.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Wagga Wagga in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to optimise the management and use of resources and ensure that choices and opportunities in relation to those resources remain for future generations,
(b) to promote development that is consistent with the principles of ecologically sustainable development and the management of climate change,
(c) to promote the sustainability of the natural attributes of Wagga Wagga, avoid or minimise impacts on environmental values and protect environmentally sensitive areas,
(d) to co-ordinate development with the provision of public infrastructure and services.
Contains miscellaneous and locally specific provisions (Part 5 and Schedules), for example: suspension of covenants to permit development consistent with the Plan (cl 1.9A); heritage controls (cl 5.10; Schedule 5); flood planning and special flood considerations with reference to NSW Guidelines (cl 5.21; cl 5.22); standards that cannot be used to refuse consent for licensed premises playing or performing music (cl 5.20); controls on aquaculture (cl 5.19; Schedule 6); and specific local precinct provisions (e.g. Lloyd Quarry cl 6.5, North Wagga restrictions cl 7.1, Cartwrights Hill cl 7.8).
Provides administrative rules on classification/reclassification of public land and designates acquiring authorities for owner‑initiated acquisition in certain mapped circumstances (cl 5.1; cl 5.2; Schedule 4).
Official purpose claims in the Plan are expressed as objectives in many clauses (for example, cl 1.2 sets aims such as protecting arts and culture and promoting ecologically sustainable development; cl 4.1 lists objectives about protecting productive agricultural land; cl 4.3 and 4.4 set urban design and growth aims). Those are stated policy purposes that the Plan requires the consent authority to have regard to when assessing development (cl 2.3(2) and numerous clauses that specify objectives).
Mechanically, the Plan allocates regulatory rights (what a proponent may do with or without development consent), places obligations on the consent authority (what the Council must consider, notify or require), and establishes map‑based constraints and numeric development standards (lot size, height, FSR, floor area caps for specific uses). It also creates procedural obligations , for example, a mandatory record of assessments when a development standard is contravened (cl 4.6(4)); requirements to notify Heritage Council or Aboriginal communities in specified heritage cases (cl 5.10(7)-(9)); and consultation with Commonwealth aviation body if proposed works penetrate the Obstacle Limitation Surface (cl 7.11).
Who pays, who decides, what behaviour changes: property owners and developers pay compliance costs (application preparation, professional reports, possible infrastructure contributions), the Council (consent authority) decides most local development applications subject to Act processes, and the Plan shifts behaviour by enabling, restricting or conditioning land uses across zones and by setting numerical caps and design rules which influence subdivision, building form and use choices.
Main concepts
The Plan uses a small set of recurring legal and technical mechanisms to implement planning outcomes. The principal concepts, and their operational mechanics in the text, are:
Zoning and the Land Use Table (cl 2.1-2.3; Land Use Table). Zones are discrete legal categories (RU, R, E, MU, SP, RE, C, W) with listed objectives. The Land Use Table (at the end of Part 2) is the primary instrument that tells whether a use is permitted without consent, permitted only with consent, or prohibited within a zone. The consent authority must have regard to the zone objectives when deciding a development application (cl 2.3(2)).
Spatial maps as operative rules (cl 1.7; cl 2.2). The Plan’s effect is map‑driven: Lot Size Map, Land Zoning Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Water Resource Map, Terrestrial Biodiversity Map, Vulnerable Land Map, North Wagga map and others determine applicability of many clauses. The maps are kept and made available for public access (cl 1.7(3)‑(4)); note that the Plan contemplates electronic GIS formats and standard technical requirements.
Development consent as primary gateway (multiple clauses). Many kinds of development (subdivision, demolition, erection of dwellings in certain rural zones, certain changes of fire alarm monitoring) require development consent (cl 2.6; cl 2.7; cl 5.8; numerous Land Use Table entries). The Plan specifies when development is exempt development (Schedule 2) or complying development (Schedule 3 and cl 3.2).
Development standards and exceptions (Part 4). Numeric and spatial development standards set minimum lot sizes (cl 4.1), maximum heights (cl 4.3), maximum floor space ratios (cl 4.4) and lots of specific caps on floor area for certain uses (cl 5.4). Clause 4.6 allows flexibility: the consent authority may grant consent that contravenes a development standard if the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(2)‑(3)), but cl 4.6 also lists explicit exclusions where the clause does not apply (cl 4.6(8)).
Environmentally sensitive area exclusions (cl 3.3). Exempt or complying development cannot be carried out on environmentally sensitive areas defined in cl 3.3(2) (coastal waters, Ramsar wetlands, heritage or high biodiversity significance land, etc.).
Heritage protection and processes (cl 5.10; Schedule 5). The Plan sets consent triggers for demolition, alteration, excavation and subdivision affecting items on the heritage list or within a heritage conservation area; it allows the consent authority to require heritage management documents or conservation management plans and mandates notification of the Heritage Council and consultation with Aboriginal communities in specified circumstances (cl 5.10(2)-(9)).
Flood planning and special flood considerations (cl 5.21; 5.22). The Plan requires the consent authority not to grant consent in the flood planning area unless satisfied of compatibility with flood function and behaviour, risk to life and evacuation, and climate change impacts (cl 5.21(2)-(3)). Special flood considerations extend those obligations for land between the flood planning area and the probable maximum flood and for sensitive/hazardous development (cl 5.22).
Suspension of private covenants where necessary to enable development in accordance with the Plan (cl 1.9A). Clause 1.9A suspends private agreements, covenants or similar instruments to the extent necessary to permit development under the Plan, but excludes certain covenants and instruments (Council‑imposed covenants, Crown land instruments, conservation agreements, planning agreements etc) and does not affect public authority rights under registered instruments (cl 1.9A(1)‑(3)).
Localised special controls and precinct rules. Examples include the North Wagga special site restrictions limiting new dwellings and additions (cl 7.1), Lloyd Quarry redevelopment preconditions (cl 6.5), Cartwrights Hill odour/noise assessment requirement (cl 7.8), Estella bicycle/pedestrian requirements (cl 7.13), and primacy rules for Zone E2 (cl 7.9).
Interaction with State environmental planning policies (cl 1.9). The Plan is subject to SEPPs that prevail under s 3.28 of the Act; the Plan lists some State policies that may be relevant, and disapplies certain SEPP provisions where expressed.
These concepts establish the governance architecture: maps and zone rules constrain private choices; development consent and the Council’s functions allocate decision authority and implementation discretion; the Plan interacts with State policies, other Acts and technical guidelines (e.g. Considering Flooding in Land Use Planning Guideline cited in cl 5.21(5)).
Who it affects
The Plan changes legal entitlements and obligations for several classes of actors. The mechanics in the Plan show precisely who is empowered or constrained:
Landowners and developers within the Plan area. The Plan directly governs what landowners can do with their land, by zoning, by defining permitted/prohibited uses in the Land Use Table, by imposing lot size, height and floor space ratio limits (cl 2.3; cl 4.1; cl 4.3; cl 4.4), and by setting rules for subdivisions (cl 2.6) and dwelling construction in rural zones (cl 4.2A). Landowners proposing development must comply with the Plan’s mapping, standards and consent triggers.
The Council (consent authority). The Council is the named consent authority under cl 1.6 and therefore exercises statutory decision‑making powers under the Act consistent with the Plan’s requirements. The Plan prescribes matters the Council must consider in many contexts (e.g. flood planning cl 5.21(3); heritage cl 5.10(4); aquaculture cl 5.19(2)). The Council also administers local approvals on Council land (Schedule 2 exempt events and signs require written Council consent).
Neighbouring landowners and the local community. Several clauses require the consent authority to consider impacts on adjoining properties and neighbourhood amenity (cl 2.4(2), temporary use cl 2.8(3)(b), intensive livestock agriculture cl 5.18(3)(b), farm stay/farm gate premises cl 5.24(4) and cl 5.25(2)). Those provisions expose development proposals to considerations that protect neighbour amenity and environmental values.
NSW State agencies and regulatory bodies. The Plan explicitly involves State agencies in particular decision pathways: the Director‑General (for certification under urban release area infrastructure arrangements cl 6.1(2)-(3)); Transport for NSW in land acquisition entries (cl 5.1(2)); the Minister administering the National Parks and Wildlife Act for acquisition of national park land (cl 5.1(2)); the Heritage Council (notifications under cl 5.10(7) and (9)); and the relevant Commonwealth aviation body for developments affecting the Obstacle Limitation Surface (cl 7.11(2)-(4)). The Plan also defers to SEPPs and State guidelines (cl 1.9; cl 5.21(5)).
Aboriginal communities and the Heritage Council. Heritage clauses require notification and consultation with local Aboriginal communities and the Heritage Council for developments affecting Aboriginal places or archaeological sites (cl 5.10(7)-(8)). The Plan thereby brings procedural obligations to engage with these communities for qualifying proposals.
Sector‑specific industries. The Plan sets industry‑specific rules that affect aquaculture operators (cl 5.19; Schedule 6), intensive livestock agriculture proponents (cl 5.18), and licensed premises (music protections cl 5.20). These provisions create substantive site and operational requirements and alter the analysis consent authorities must undertake.
Lenders, purchasers and title holders. Minimum lot sizes, strata subdivision controls, community title rules, and covenants affect property values, the ability to create dwelling entitlements and title configurations. Clause 4.5(9) allows a consent condition requiring a registered covenant preventing the creation of floor area on a “restricted lot” to avoid double‑counting floor area, which affects title encumbrances.
The Crown and public authorities. The Plan preserves or recognises interests of public authorities, sets the acquiring authority for specific reservation types (cl 5.1), and allows certain Crown infrastructure uses to proceed under State SEPPs regardless of the Plan (cl 5.12).
Who pays: the Plan imposes compliance and transaction costs primarily on landowners and developers (preparation of environmental impact statements, heritage management documents, flood risk assessments, infrastructure contributions and possibly covenants). The Council bears administrative costs in assessments and public consultation, and State agencies bear consultation and certification roles when invoked by specific clauses.
Key duties and rights
The Plan creates a mixture of rights (what may be done without or with consent) and duties (what decision makers and proponents must do or show) across its parts. Key operative duties and rights follow.
Rights and entitlements
Permitted uses by zone. The Land Use Table confers a right to carry out certain development without consent in each zone (cl 2.3(1); Land Use Table). For example, in RU1 Primary Production "Extensive agriculture" and "Home businesses" are permitted without consent; in E1 Local Centre certain retail and community uses are permitted with consent.
Exempt and complying development. Schedule 2 lists development that is exempt, and Schedule 3 sets out types and conditions for complying development (cl 3.1‑3.2). Where development meets Schedule criteria and other statutory requirements, proponents may proceed without development consent (but must comply with other regulatory approvals).
Suspension of private covenants. Clause 1.9A(1) grants, for the purpose of enabling development under the Plan, that agreements and covenants restricting development "do not apply to the extent necessary to serve that purpose", subject to exceptions (cl 1.9A(2)‑(3)). This creates a right for proponents to proceed notwithstanding earlier private restrictions, except where specifically excluded.
Specific use rights via Schedule 1. Schedule 1 grants additional permitted uses for identified parcels of land (sch 1), e.g. specialised retail premises at specified East Wagga Wagga addresses.
Duties and conditions on consent authorities and applicants
Regard to zone objectives. The consent authority must have regard to objectives for each zone when determining a development application (cl 2.3(2)).
Evidence and assessment requirements on contravening development standards. Clause 4.6 requires that development consent must not be granted for contravention of a development standard unless the applicant demonstrates (a) compliance is unreasonable or unnecessary and (b) there are sufficient environmental planning grounds. The consent authority must keep a record of its assessment (cl 4.6(3)‑(4)).
Heritage procedural duties. Where development affects heritage items, archaeological sites or Aboriginal places, the consent authority must assess heritage impacts, may require heritage management documents or conservation plans and must notify the Heritage Council or Aboriginal communities in specified cases and consider their responses within 28 days (cl 5.10(4)‑(9)).
Flooding duties. The consent authority must not grant consent in a flood planning area unless it is satisfied of compatibility with flood function and behaviour, non‑adverse effects on flood behaviour and evacuation routes, measures to manage life‑safety risk, and environmental protection (cl 5.21(2)‑(3)). Special flood considerations apply for land up to the probable maximum flood for sensitive and hazardous development (cl 5.22).
Assessment matters for intensive livestock and aquaculture. The consent authority must consider specified environmental and amenity impacts before granting consent for intensive livestock agriculture (cl 5.18(3)) and must be satisfied that pond/tank aquaculture meets site and operational requirements in Schedule 6 (cl 5.19(2)‑(3)).
Urban release staging and infrastructure certification duties. In urban release areas, development consent for subdivisions creating smaller lots requires a Director‑General certification that arrangements for designated State public infrastructure have been made, and a development control plan must be in place for staged development (cl 6.1‑6.3).
Limitations on rezonings/subdivision outcomes via cl 4.6(6). Clause 4.6 prevents consent to contravene development standards for subdivisions in many rural and conservation zones that would create multiple lots below the minimum area or any lot under 90% of the minimum area.
Other notable duties/permissions
Demolition generally requires development consent (cl 2.7).
Temporary use caps (20 days per 12 months , cl 2.8) with specific exceptions for sales offices (cl 2.8(4)‑(5)).
Music and entertainment standards that cannot be used to refuse consent for licensed premises on certain grounds (cl 5.20).
Obligations to exclude environmentally sensitive areas from exempt or complying development (cl 3.3).
The Plan is procedural as well as prescriptive: many duties are framed as matters the consent authority "must consider" or preconditions the authority must be "satisfied" of before granting consent (repeated across cl 4.6, cl 5.10, cl 5.18, cl 5.19, cl 5.21, cl 5.22, cl 6.1-6.3, cl 7.1, cl 7.8, etc.). Rights are largely tied to zone entitlements and compliance with the Plan’s numeric and locational standards or to being listed in the exempt/compliant Schedules.
Penalties and enforcement
The Plan itself does not expressly create criminal penalties or fines; those enforcement mechanisms are part of the broader statutory regime under the Environmental Planning and Assessment Act 1979 and related legislation (the Plan refers repeatedly to the Act). From the Plan text the enforcement and compliance architecture is as follows:
Decision and enforcement reliance on the Act. The Plan delegates decision‑making to the Council as the consent authority (cl 1.6) and uses the Act’s development consent, exemption and complying development frameworks (Part 3 and many cross‑references to the Act). Enforcement functions, penalties for unauthorised development, and orders for remedying breaches are matters dealt with under the Act and Regulations; the Plan does not invent new penalty regimes.
Consent conditions and registered covenants. The Plan contemplates consent conditions, including the ability to require a covenant to prevent “double dipping” of floor space between consolidated lots (cl 4.5(9)‑(10)). Such registered covenants become enforceable encumbrances on title and affect future development possibilities.
Procedural restraints with consultative triggers and notification obligations. Non‑compliance with consultation and notification requirements set out in the Plan (for example, not notifying the Heritage Council or local Aboriginal communities where the Plan requires such notification, cl 5.10(7)-(9)) would affect the lawfulness of a consent decision and could be grounds for appeal or review under the Act.
Exempt and complying development conditions. Exempt development and complying development certificates are subject to specific conditions in Schedule 2 and Schedule 3; failure to comply with those conditions could render development unauthorised and attract enforcement under the Act.
Interaction with other statutory regimes. The Plan repeatedly cross‑references other statutes (Local Government Act 1993, Crown Land Management Act 2016, Native Vegetation Act 2003, National Parks and Wildlife Act 1974, Land Acquisition (Just Terms Compensation) Act 1991, Rural Fires Act 1997, Fisheries Management Act 1994, BASIX policy etc). Non‑compliance with those statutes constitutes separate offence or compliance regimes which apply in addition to planning enforcement.
Implementation and administrative enforcement is therefore carried out through the Council’s exercise of consent powers, conditions on consents (including registered covenants), and the Act’s enforcement tools for unauthorised development. The Plan itself sets preconditions and obligations (e.g. a consent authority must be satisfied of certain matters before granting consent , see cl 5.21, cl 5.10), and failure to fulfil those preconditions would mean a lawful consent cannot be issued; the Plan does not create separate criminal penalties within its text.
How it interacts with other laws
The Plan is expressly designed to sit within and interact with a network of State and Commonwealth laws and policies; the instrument uses cross‑references and exclusions to manage overlaps and institutional responsibilities. Key interactions specified in the text:
The Environmental Planning and Assessment Act 1979 (the Act). The Plan is made under, and subject to, the Act. It refers to the Act for decision‑making structures (consent authority, s 3.28 SEPP primacy, s 3.16 Governor approvals referenced in cl 1.9A(4)) and uses the Act’s frameworks for exempt and complying development, development consent, and the requirement that SEPPs prevail where necessary (cl 1.9).
State environmental planning policies (SEPPs). Clause 1.9(1) confirms that the Plan is subject to SEPPs that prevail under s 3.28 of the Act. The Plan also specifically disapplies some SEPP provisions in relation to the land (cl 1.9(2) , list omitted in the extract). The Plan lists several SEPPs and State instruments that may be relevant to development (e.g. Housing 2021; Transport and Infrastructure 2021; Resilience and Hazards 2021; Resources and Energy 2021; Primary Production 2021).
Local Government Act 1993. The Plan explicitly deals with classification and reclassification of public land pursuant to Part 2 of Chapter 6 of the Local Government Act (cl 5.2) and references section 30(2) approvals by the Governor for discharge of trusts (cl 5.2(5) note). It also requires approvals from Council for some works that are otherwise regulated under the Local Government Act (cl 3.2(3) on on‑site effluent systems).
Crown and Crown land management laws. Clause 1.9A(2) exempts certain Crown land instruments from the suspension of private covenants, and cl 5.2 notes Crown reservations and mineral reservations preserved on reclassification (cl 5.2(5)(b)-(c)). The Plan also preserves the use of Crown buildings (cl 5.12).
Heritage and Aboriginal heritage law. Clause 5.10 cross‑references the Heritage Act 1977 for State heritage register and interim heritage order matters and imposes notification obligations to the Heritage Council for certain archaeological and nominated State heritage item matters (cl 5.10(7)-(9)). Aboriginal places and objects are handled with consultation duties (cl 5.10(8)).
Biodiversity and national parks laws. Environmentally sensitive area definitions refer to Coastal Management Act 2016, Fisheries and Marine Parks Acts (cl 3.3), and the Biodiversity Conservation Act 2016 is cited in Schedule 6 exclusions (cl 1 of Schedule 6). Clause 7.7 explicitly identifies protected regrowth for the (now repealed) Native Vegetation Act 2003.
Rural Fires Act 1997. Clause 5.11 permits bush fire hazard reduction work authorised by the Rural Fires Act to be carried out without development consent.
Land Acquisition (Just Terms Compensation) Act 1991. Clause 5.1 sets out which State authority will be the relevant acquisition authority in owner‑initiated acquisition scenarios under that Act and notes the Governor’s role and section 23 hardship acquisition trigger.
Civil aviation and Commonwealth bodies. Clause 7.11 requires consultation with the relevant Commonwealth body (Civil Aviation Safety Authority or other federal approval body) if a proposed development penetrates the Obstacle Limitation Surface for Wagga Wagga Airport.
Flood planning guidelines and manuals. Clause 5.21 and 5.22 require decision‑makers to use the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual in assessing flood‑related matters.
Fisheries and aquaculture law. Clause 5.19 and Schedule 6 require compliance with aquaculture industry development plans published under the Fisheries Management Act 1994 and the Fisheries Management (Aquaculture) Regulation 2017 definitions and limits.
BASIX/BASIX‑linked development standards. Clause 4.6(8) excludes BASIX commitments and development standards for complying development from being varied under the exceptions clause, indicating an interaction with the BASIX regime and the Act’s regulations.
Other Acts referenced: Crown Land Management Act 2016, National Parks and Wildlife Act 1974, Land Acquisition Act, Local Land Services Act 2013, Native Vegetation Act 2003 (repealed but referenced for historical mapping), Marine Estate Management Act 2014 for aquatic reserves and marine parks.
Mechanisms of interaction are threefold: (1) primacy rules , SEPPs and other State instruments can prevail under the Act (cl 1.9); (2) referral, consultation and certification hooks , the Plan requires consultation with Heritage Council, Aboriginal communities, Director‑General certification for urban release infrastructure, and Commonwealth aviation bodies in specified cases (cl 5.10; cl 6.1; cl 7.11); (3) cross‑compliance , obligations under other Acts (e.g. fisheries licences, Crown land authorities, bush fire planning) remain in force and the Plan often requires applicants to demonstrate compliance or to obtain those approvals as part of the application package (e.g. cl 3.1(5), cl 5.19(3), cl 5.11 note).
For practitioners, the critical point is that any application under the Plan will commonly require a check of multiple statutory regimes and possibly multiple approvals or licences beyond development consent.
Amendment history
The Plan text itself contains embedded amendment citations attached to many clauses and schedules. The Plan has been amended repeatedly; the instrument records those amendments by year and amendment number in the body text. The provided Plan extract shows the following amendment references (non‑exhaustive list drawn from the clause notes and inline amendment markers):
The Plan’s amendment notes document incremental, targeted changes,new local controls (e.g. Lloyd Quarry, Cartwrights Hill, Estella), additional technical standards (aquaculture, flood) and updates to align with State policy changes (new SEPPs, BASIX, flood guideline references). For full amendment trace practitioners must consult the Plan’s consolidated instrument on the NSW legislation website where the Plan’s schedule of amendments and amendment instruments are recorded; the Plan itself records many amendment instrument citations next to amended clauses.
Litigation history
The Plan text provided does not cite any court or tribunal decisions. There are no judicial decisions, appeals or litigation outcomes referenced in the instrument. Where the Plan refers to decision‑making obligations (for example, cl 4.6(3) requiring demonstration when contravening a development standard), it references the procedural requirements in the Environmental Planning and Assessment Regulation rather than substantive case law.
Practitioners seeking the litigation history or authoritative judicial interpretation of any clause should search case law databases and tribunal decisions (Land and Environment Court of NSW) because the Plan as provided does not contain internally recorded litigation or precedent references.
Gotchas
The Plan contains several provisions that commonly catch practitioners and clients. These items can change application strategy, increase compliance costs or create unforeseen constraints:
Maps are binding and multiple. The Plan relies heavily on maps (Lot Size, Height, FSR, Heritage, Biodiversity, Vulnerable Land, Water Resource, North Wagga Special Site, Noise Exposure Forecast Contours, Obstacle Limitation Surface map etc). A proposal must be tested against all relevant maps (cl 1.7; cl 2.2). Failure to check all maps can lead to unexpected triggers (heritage, biodiversity, flood) that require additional approvals or studies.
Suspension of covenants (cl 1.9A). Clause 1.9A can suspend private covenants, agreements or instruments to the extent necessary to enable Plan‑consistent development. However it expressly preserves Council‑imposed covenants, relevant Crown land instruments, conservation agreements, Trust agreements under Nature Conservation Trust Act 2001, property vegetation plans, biobanking agreements and planning agreements (cl 1.9A(2)). Practitioners should not assume covenant suspension covers every restriction , the clause lists notable exclusions and preserves public authority registered interests (cl 1.9A(3)). Governor approval was obtained before making cl 1.9A (cl 1.9A(4)), but the scope of suspension is factually limited by its text.
Savings provision for pending applications (cl 1.8A). Applications made before the Plan’s commencement that were not finally determined must be determined as if the Plan had not commenced (cl 1.8A(1)). This can be a tactical issue for proponents who lodged under the old plan expecting different entitlements. Note the specific savings rule for State Environmental Planning Policy Amendment (Flood Planning) 2023 in cl 1.8A(2).
Exclusions to exempt/compliant development for “environmentally sensitive areas” (cl 3.3). Exempt or complying pathways are closed for land that falls within a long list including Ramsar wetlands, World Heritage areas, coastal wetlands, land of high Aboriginal cultural significance, areas within 100 metres of such areas, and other prescribed reserves (cl 3.3(2)). A seemingly minor alteration may be captured by these exclusions.
Contravention of development standards (cl 4.6). While cl 4.6 allows flexing standards, it requires a demonstrative test by the applicant and places the consent authority on record to justify any approval that departs from standards (cl 4.6(3)-(4)). There are explicit exclusions where cl 4.6 does not allow a contravention (cl 4.6(8)), including BASIX commitments, certain clauses (e.g. 4.2A, 4.2B), and complying development standards.
Strict rules for dwelling development in rural/conservation zones (cl 4.2A). Erection of dwellings or dual occupancies on lots where none was previously erected is tightly constrained; exceptions require minimum lot size per the Lot Size Map or pre‑existing holdings or other narrow tests. The definition of “existing holding” is technical and includes adjoining land under the same ownership at a particular historical date (1 November 1986) (cl 4.2A(3)-(6)), a fact‑specific test that affects entitlements and subdivision strategy.
Flood planning obligations are demanding. Clause 5.21 requires the consent authority to be satisfied about flood compatibility, no adverse flood behaviour impacts, evacuation safety and measures to manage risk to life; it imports the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.21(4)-(5)). Developers face significant technical and design obligations and must address climate change projections, evacuation capacity and potential future modification/removal of buildings (cl 5.21(3)(a)-(d)). Special flood considerations (cl 5.22) extend obligations to land up to the probable maximum flood for sensitive development.
Heritage consents have multiple triggers and consultation obligations. Demolition, alteration, excavation and erection on land with heritage items or within conservation areas requires consent and may require a heritage management document or conservation management plan; the Heritage Council must be notified in specified cases and the consent authority must consider responses (cl 5.10(2)-(6), (7)-(9)). Failure to carry out proper heritage assessment risks refusal or delay.
Limitations on subdividing around split zones and exceptions for consolidated lots. Clauses 4.1A and 4.6A permit some flexibility for original lots containing multiple zones, but set tight tests about resulting lot sizes and what land must be contained in particular resulting lots (cl 4.1A(3); cl 4.6A(3)). Misreading these can produce plans for subdivision that the consent authority must refuse.
Music protections for licensed premises (cl 5.20). Consent authorities are prohibited from refusing consent for licensed premises on specified artistic/entertainment grounds (genre, live/amplified, dancing, stage orientation, etc.) and from refusing on noise grounds if the noise may be managed and minimised to an acceptable level (cl 5.20(1)-(2)). Applicants and councils must shift assessment to feasible noise management rather than categorical refusals on entertainment grounds.
Exempt development on Council land requires written Council consent and strict conditions. Several exempt items in Schedule 2 (temporary events and signage,sch 2 items) are permitted only on Council land and require written Council consent and daughter requirements (sch 2 oc.4 and oc.5). Private events on private land do not benefit from these particular exemptions.
“Double dipping” floor area covenants (cl 4.5(9)-(10)). Conditions preventing double counting of FSR between lots may result in registered covenants that restrict future development and resale values.
Those “gotchas” are concrete constraints widely dispersed through the Plan; they raise compliance costs (technical studies, heritage and Aboriginal heritage engagement, flood/evacuation design), create timing risks (notification periods, certification requirements), and require checking multiple maps and schedules.
How to comply
Practical, step‑by‑step checklist grounded in the Plan’s provisions for lawyers, planning consultants and proponent teams preparing a development proposal in the Wagga Wagga LGA:
Confirm the applicable maps and zones
Check the Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Terrestrial Biodiversity Map, Vulnerable Land Map, Water Resource Map, North Wagga Special Site Map, Noise Exposure Forecast Contour Map, and any other Plan maps listed in cl 1.7 and cl 2.2.
Identify the zone (cl 2.1) and then consult the Land Use Table to determine whether the proposed use is permitted without consent, permitted with consent or prohibited in that zone (cl 2.3).
Determine whether development consent is required
If the use is listed as permitted without consent in the Land Use Table but involves building work, check Part 3: exempt development criteria (Schedule 2) and complying development rules (cl 3.1-3.2 and Schedule 3).
Confirm that the land is not an “environmentally sensitive area for exempt or complying development” under cl 3.3 if relying on exempt/compliant pathways.
Check numeric and locational development standards
Minimum lot sizes (cl 4.1) and applicable exceptions (cl 4.1A, cl 4.1AA, cl 4.2, cl 4.2A, cl 4.2B).
Height limits (cl 4.3) and floor space ratios (cl 4.4), and use cl 4.5 to calculate site area and floor space ratio correctly, including exclusions for community land and double dipping rules (cl 4.5(4)-(7), (9)-(10)).
If the proposal contravenes a development standard, prepare the justification under cl 4.6 and the accompanying documents required by the Environmental Planning and Assessment Regulation; expect the consent authority to keep a written record (cl 4.6(3)-(4)).
Identify and address special local provisions
If land is within a special precinct (e.g. Lloyd Quarry cl 6.5, North Wagga cl 7.1, Cartwrights Hill cl 7.8, Estella cl 7.13, or within Zone E2 primacy cl 7.9), ensure compliance with those clauses and include required assessments (e.g. odour/noise studies for Cartwrights Hill).
For urban release areas, ensure DCP provisions and Director‑General certification for designated State infrastructure are in place before subdivision applications (cl 6.1-6.3).
Heritage and Aboriginal heritage due diligence
Check Schedule 5 for listed heritage items and the Heritage Map. For any work affecting heritage items, heritage conservation areas, Aboriginal objects or archaeological sites, follow the procedural steps in cl 5.10: determine whether consent is required, whether a heritage management document or conservation management plan is needed, notify the Heritage Council or Aboriginal communities as required, and include heritage impact assessments.
Flood, bushfire and environmental assessments
If the land is in the flood planning area or within special flood consideration areas, prepare a flood risk assessment consistent with the Considering Flooding in Land Use Planning Guideline and address cl 5.21 and cl 5.22 matters (compatibility, evacuation, risk to life, environmental impacts, and climate change projections).
For bushfire prone land, account for the Rural Fires Act and relevant Planning for Bush Fire Protection standards (cl 5.11 note and other references).
If land is on Terrestrial Biodiversity, Vulnerable Land, Riparian Land, or Groundwater maps, include biodiversity, slope/soil, riparian and groundwater impact assessments per cl 7.3-7.6.
Industry‑specific compliance
For intensive livestock proposals, follow cl 5.18 (capacity thresholds, locational restrictions) and prepare statements addressing odour, pollution risk, soil degradation, species welfare codes, and DPI guidelines (cl 5.18(3)(a)-(h)).
For pond/tank/oyster aquaculture, meet Schedule 6 site and operational requirements, species selection rules and discharge/screening requirements (cl 5.19; Schedule 6 parts).
Prepare application documentation and notifications
Assemble statements of environmental effects, heritage management documents, flood risk assessments, acoustic reports (for licensed premises or development near airport flight paths cl 7.12), bushfire assessment if relevant, and any other specialist reports required by cl 5.10, cl 5.18, cl 5.21 or local council practice notes.
Where clause triggers notifications (Heritage Council cl 5.10(7); Aboriginal community notice cl 5.10(8); Commonwealth aviation body cl 7.11), include evidence of notification and responses or explain reasons for reliance on exceptions.
Consider timing, consultation and approvals
Allow time for consultation with the Council, Heritage Council, Aboriginal communities, state agencies (Director‑General for urban release infrastructure), and Commonwealth aviation bodies as required.
Where cl 1.8A applies (pending applications saved), confirm lodgement dates and whether the proposal can proceed under the prior instrument.
Consent conditions and title encumbrances
Anticipate consent conditions that may include provision for registered covenants to prevent double counting of floor area (cl 4.5(9)-(10)), conservation works, infrastructure contributions, or noise management plans (cl 5.20). Ensure clients understand ongoing obligations and title impacts.
Appeals and records
Keep records of the consent authority’s assessments, particularly where cl 4.6 justifications are relied upon because the consent authority must keep an assessment record (cl 4.6(4)). This is important for demonstrating procedural correctness and for any potential review or appeal.
Use the Plan’s notes and external guidance
The Plan frequently points to external policies and guidelines (e.g. BASIX, Considering Flooding Guideline, Flood Risk Management Manual, NSW Oyster Industry Strategy). Use the exact versions cited by the Plan in the clauses (cl 5.21(5); cl 5.19(7)) and ensure the application addresses those standards.
In short, compliance is map‑led, clause‑specific and often multi‑regulatory. Early site checks against the Plan maps and schedules, pre‑lodgement meetings with Council, and commissioning of targeted technical reports (heritage, flood, bushfire, odour/noise, biodiversity, groundwater) will reduce risk. Where a proposed development breaches a development standard, prepare the s 4.6 written justification and supporting evidence in line with the Regulation and be ready for the consent authority to record its assessment.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Wagga Wagga Local Environmental Plan 1985,
Wagga Wagga Local Environmental Plan—Reclassification of Public Land,
Wagga Wagga Rural Local Environmental Plan 1991.
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to pending development approvals
1 Savings provision relating to pending development approvals
1.8A Savings provision relating to pending development approvals
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 4B of Part 3 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
cl 1.8A: Am 2023 (609), Sch 1.1[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 20 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of
This is an opening excerpt, not the complete document.