The time specified for the purposes of regulation 11(1) and (2) for a prescribed activity set out in Part 42 of Schedule 2 is the later of—
(b) the day on which the gas-fired steam boiler, gas-fired hot water boiler or gas-fired water heater with the installed product is commissioned to produce and deliver steam or water heated by gas.
The time specified for the purposes of regulation 11(1) and (2) for a prescribed activity set out in Part 43 of Schedule 2 is the day on which the cold room, with the product or products installed, is first commissioned to refrigerate goods.
44 Air source heat pump water heaters—Schedule 2, Part 44
The time specified for the purposes of regulation 11(1) and (2) for a prescribed activity set out in Part 44 of Schedule 2 is the later of—
(a) the day on which the installation and commissioning of the product are complete; or
(b) the day on which the existing gas‑fired hot water boiler, gas‑fired water heater, electric resistance hot water boiler or electric resistance water heater is decommissioned.
45 Home energy rating assessment—Schedule 2, Part 45
The time specified for the purposes of regulation 11(1) and (2) for a prescribed activity set out in Part 45 of Schedule 2 is the day on which a copy of the results of the home energy rating assessment is provided to the energy consumer.
46 Induction cooktops and freestanding combined induction cooking products—Schedule 2, Part 46
The time specified for the purposes of regulation 11(1) and (2) for a prescribed activity set out in Part 46 of Schedule 2 is the day on which the induction cooktop or freestanding combined induction cooking product is sold to the energy consumer.
47 Commercial and industrial solar photovoltaic system—Schedule 2, Part 47
The time specified for the purposes of regulation 11(1) and (2) for a prescribed activity set out in Part 47 of Schedule 2 is the first day on which the installed product—
(a) is connected to a distribution network in accordance with the approval of a Distribution Network Service Provider under a negotiated connection contract; and
Section 42 - Victorian Energy Efficiency Target Regulations 2018 - Economizers—Schedule 2, Part 42 | Zoe
(b) is able to produce and deliver energy.
Sch. 4 (Heading) amended by S.R. No. 25/2023 reg. 30, substituted by S.R. No. 109/2024 reg. 13(1).
Schedule 4—Limits on the creation of certificates for certain prescribed activities
Regulation 24
1 Definitions
In the Schedule—
old Regulations means the Victorian Energy Efficiency Target Regulations 2008 as in force immediately before their revocation;
Sch. 4 cl. 1 def. of relevant period amended by S.R. Nos 25/2023 regs 16, 21, 31, 109/2024 reg. 13(2).
relevant period means—
(a) in respect of a prescribed activity other than an activity referred to in clause 2 or 5, the period beginning on 10 December 2018 and ending immediately before a product is installed or modified as part of the prescribed activity; and
(b) in respect of a prescribed activity referred to in clause 2(1), the period beginning on 10 June 2019 and ending immediately before a product is installed or modified as part of the prescribed activity; and
(ba) in respect of a prescribed activity referred to in clause 2(1A), the period beginning on 31 May 2023 and ending immediately before a product is installed as part of a prescribed activity; and
(c) in respect of a prescribed activity referred to in clause 2(2), the period beginning on 10 December 2008 and ending immediately before the earlier of—
(i) 10 June 2019; or
(ii) the installation or modification of a product as part of the prescribed activity; and
(ca) in respect of a prescribed activity referred to in clause 3, 3A, 4 or 4A, the period beginning on 31 May 2023 and ending immediately before a product is installed as part of a prescribed activity; and
(d) in respect of a prescribed activity referred to in clause 5(1), the period beginning on 10 June 2019 and ending immediately before a product is installed or modified as part of the prescribed activity; and
(e) in respect of a prescribed activity referred to in clause 5(2), the period beginning on 10 December 2008 and ending immediately before the earlier of—
(i) 10 June 2019; or
(ii) the installation or modification of a product as part of the prescribed activity; and
(f) in respect of a prescribed activity referred to in clause 12, a period of 5 years ending immediately before the home energy rating assessment is provided as part of the prescribed activity; and
(g) in respect of a prescribed activity referred to in clause 13, the period beginning on and including 25 October 2024 and ending immediately before a product is sold as part of the prescribed activity.
2 Water heating products
(1) A certificate cannot be created in relation to a prescribed activity involving the installation, in residential premises, of a water heating product specified in Part 1 or 3 of Schedule 2 if, during the relevant period, 2 or more water heating products specified in Part 1 or 3 of Schedule 2 have been installed at the premises as part of a prescribed activity (whether or not a certificate was created for that activity).
(1A) A certificate cannot be created in relation to a prescribed activity involving the installation, in non-residential premises, of a water heating product specified in Part 1 or 3 of Schedule 2 if, during the relevant period, 5 or more water heating products specified in Part 1 or 3 of Schedule 2 have been installed at the same premises as part of a prescribed activity (whether or not a certificate was created for that activity).
(2) A certificate cannot be created in relation to a prescribed activity involving the installation, in residential premises, of a water heating product specified in Part 1 or 3 of Schedule 2 if, during the relevant period, 2 or more water heating products specified in Part 1 or 3 of Schedule 2 or in Schedule 1 or 3 of the old Regulations have been installed at the premises as part of a prescribed activity (whether or not a certificate was created for that activity).
(1) A certificate cannot be created in relation to a prescribed activity involving the installation, in residential premises, of a ducted heating or cooling product specified in Part 6 of Schedule 2 if—
(a) a specified controlled heating or cooling product at the premises has not been decommissioned as part of the prescribed activity; and
(b) during the relevant period, one or more ducted heating or cooling products specified in Part 6 of Schedule 2 have been installed at the same premises as part of a prescribed activity (whether or not a certificate was created for that activity).
(2) A certificate cannot be created in relation to a prescribed activity involving the installation, in non-residential premises, of a ducted heating or cooling product specified in Part 6 of Schedule 2 if—
(a) a specified controlled heating or cooling product at the premises has not been decommissioned as part of the prescribed activity; and
(b) during the relevant period, 2 or more ducted heating or cooling products specified in Part 6 of Schedule 2 have been installed at the same premises as part of a prescribed activity (whether or not a certificate was created for that activity).