101 Lodgment of plans after completion of protection work
S. 101(1) amended by Nos 33/2010 s. 23, 21/2017 s. 17(1).
(1) Not later than 2 months after the completion of any protection work carried out under this Part, the owner must serve on the adjoining owner and the relevant building surveyor a complete set of plans, drawings and specifications showing the protection work which has actually been carried out in respect of the adjoining property.
S. 101(2) amended by Nos 33/2010 s. 23, 21/2017 s. 17(1).
(2) The relevant building surveyor, within 7 days after receiving plans, drawings and specifications under subsection (1), must give a copy of those documents to the relevant council.